Letter Sequence Request |
|---|
|
|
MONTHYEARML0209302122002-03-28028 March 2002 Proposed Technical Specifications Changes & Exemption Request for Use of Framatome Anp Advanced Mark-BW Fuel Project stage: Request ML0213503742002-05-13013 May 2002 Request for Withholding Information from Public Disclosure by Letter Dated 03/28/2002 Project stage: Withholding Request Acceptance ML0220500122002-07-23023 July 2002 Ltr, Proposed Technical Specification Changes and Exemption Request Regarding Use of Framatome and Advanced Mark-BW Fuel Project stage: Other ML0222702432002-08-0202 August 2002 Small Break LOCA Evaluation in Support of Proposed Technical Specifications Changes & Exemption Request Use of Framatome Anp Advanced Mark-BW Fuel Project stage: Other ML0224601642002-08-16016 August 2002 Large Break LOCA Analysis in Support of Proposed Technical Specifications Changes & Exemption Request to Use Framatome Anp Advanced Mark-BW Fuel Project stage: Other ML0233303622002-11-15015 November 2002 Revised Loca Analysis Schedule in Support of Proposed Technical Specifications Changes and Exemption Request to Use Framatome Anp Advanced Mark-BW Fuel Project stage: Other ML0302701122003-01-24024 January 2003 Fax, Request for Additional Information Framatome Fuel Transition Project stage: RAI ML0308003902003-03-21021 March 2003 Request for Additional Information on Small-break LOCA Evaluation in Support of Proposed Technical Specifications Changes and Exemption Request to Use Framatome Anp Advanced Mark-BW Fuel Project stage: RAI ML0309104342003-03-31031 March 2003 Facsimile Transmission of Questions for Proposed Technical Specifications Changes and Exemption Request, Use of Framatome Anp Advanced Mark-BW Fuel Project stage: Other ML0313306512003-05-0606 May 2003 Request to Use Subsequent Edition and Addenda of ASME Section XI for Qualification of Examination Personnel Project stage: Request ML0314007262003-05-0909 May 2003 Request for Additional Information, Proposed Technical Specifications Changes and Exemption Request to Use Framatome Anp Advanced Mark-BW Fuel Project stage: Request ML0316106732003-06-10010 June 2003 Withholding from Public Disclosure, Document Response to Request for Additional Information and Revised Pages for March 2002 Evaluation Report - Framatome Fuel Transition Program Technical Specification Change Project stage: RAI ML0316403882003-06-12012 June 2003 N. Anna, Units 1 and 2 - Framatome Anp Request for Withholding Information from Public Disclosure Project stage: Withholding Request Acceptance ML0323200022003-08-19019 August 2003 Facsimile Transmission of Questions for Proposed Technical Specifications Changes, Use of Framatome Anp Advanced Mark-BW Fuel Project stage: Other ML0327315722003-09-0808 September 2003 Facsimile Transmission of Questions on Proposed License Amendment to Use Framatome Anp Advanced Mark-BW Fuel Project stage: Other ML0325500032003-09-11011 September 2003 Facsimile Transmission of Questions on Proposed License Amendment to Use Framatome Anp Advanced Mark-BW Fuel Project stage: Other ML0328205902003-10-0606 October 2003 Meeting Summary - Usnrc/Vepco & Anp - to Discuss Framatome Fuel Transition Program at North Anna, Units 1 and 2 Project stage: Meeting ML0335002392003-12-0808 December 2003 Proposed Technical Specifications Changes & Exemption Request for Use of Framatome Anp Advanced Mark-BW Fuel Supplemental Information for Realistic Large Break Loss of Coolant Accident (Rlbloca) Containment Model Project stage: Supplement ML0401405092004-01-0606 January 2004 Stations, Units 1 and 2 - Engineering Evaluation Results and Closure of Commitment for Management of Environmentally Assisted Fatigue in Safety Injection Accumulator and Charging Nozzles Project stage: Request ML0401405102004-01-0606 January 2004 Supplemental Information for Realistic Large Break Loss of Coolant Accident (Rlbloca) Containment Pressure Analysis Proposed Technical Specifications Change & Exemption Request for Use of Framatome Anp Advanced Mark-BW Fuel Project stage: Supplement ML0401405642004-01-13013 January 2004 Facsimile Transmission of Question for Proposed Technical Specifications Changes, Use of Framatome Anp Advanced Mark-BW Fuel (Tacs MB4714 and MB4715) Project stage: Other ML0402908102004-01-22022 January 2004 Proposed Technical Specifications Changes & Exemption Request for Use of Framatome Anp Advanced Mark-BW Fuel, Response to Request for Additional Information Regarding Assessment of Fuel Assembly Bow Concern Project stage: Response to RAI ML0405505522004-02-12012 February 2004 Proposed Technical Specifications Changes and Exemption Request for Use of Framatome Anp Advanced Mark-BW Fuel, Supplemental Information for Loss of Coolant Accident Mixed Core Effects Project stage: Supplement ML0406909252004-03-0101 March 2004 Supplemental Information for SBLOCA Slot Breaks, Per Proposed Technical Specifications Changes and Exemption Request for Use of Framatome Anp Advanced Mark-BW Fuel Project stage: Supplement ML0419502182004-07-0101 July 2004 Day Report of Emergency Core Cooling System (ECCS) Evaluation Model Changes Pursuant to the Requirements of 10 CFR 50.46 Project stage: Request ML0423305602004-08-20020 August 2004 Technical Specification Amendment No. 237, Pages 2.0-1, 4.0-1, 5.6-3, 5.6-4, 5.6-5 Project stage: Other ML0423306592004-08-20020 August 2004 8/20/04, North Anna, Unit 1, Issuance of Amendment Re. Conversion to Framatome Advanced Mark-BW Fuel Project stage: Approval 2003-05-09
[Table View] |
Text
VIRGINIA ELECTRIC AND POWER COMPANY RIcHMOND, VIRGINIA 23261 January 6, 2004 United States Nuclear Regulatory Commission Serial No.:
03-616 Attention: Document Control Desk LR/CTS RO' Washington, DC 20555-0001 Docket Nos.:
50-280/281 50-338/339 License Nos.: DPR-32/37 NPF-4f7 VIRGINIA ELECTRIC AND POWER COMPANY (DOMINION)
SURRY POWER STATION UNITS I AND 2 NORTH ANNA POWER STATION UNITS 1 AND 2 ENGINEERING EVALUATION RESULTS AND CLOSURE OF COMMITMENT FOR MANAGEMENT OF ENVIRONMENTALLY ASSISTED FATIGUE IN SAFETY INJECTION ACCUMULATOR AND CHARGING NOZZLES A specific commitment of the renewed operating licenses for both the Surry and North Anna Power Stations was management of environmentally assisted fatigue for safety injection (SI) accumulator and charging line nozzles. As stated in Section 18.3.2.4 and in Table 18-1 (Item 25) of the UFSARs for both stations, an acceptable approach for addressing this issue was to further refine the fatigue analyses for SI accumulator and charging line nozzles using the guidance of ASME Code Section 1I, NB-3200, in an effort to reduce the cumulative usage factors (CUF) for the nozzles to values that are below the Code limit of 1.0. The enhanced fatigue analyses have been completed and confirm that the CUF values for the SI accumulator and charging nozzles at Surry and North Anna are below the limit of 1.0. Therefore, no additional inspections are required for these nozzles due to environmentally assisted fatigue and no further action is required for Item 25 of UFSAR Table 18-1. Appropriate changes will be made in the UFSARs for the Surry and North Anna Power Stations to document this conclusion and the closure of this commitment.
Should you have any questions regarding this submittal, please contact Mr. C. T. Snow at (804) 273-2937.
Very truly yours, Leslie N. Hartz Vice President - Nuclear Engineering Commitments made in this letter: None.
Serial No.03-616 SPS/NAPS Environmentally Assisted Fatigue cc page 1 of 1 cc:
U. S. Nuclear Regulatory Commission Region II Sam Nunn Atlanta Federal Center 61 Forsyth St., SW, Suite 23 T85 Atlanta, GA 30303-8931 Mr. C. Gratton Senior Project Manager U. S. Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike Mail Stop 8G9 Rockville, MD 20852-2738 Mr. S. R. Monarque Project Manager U. S. Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike Mail Stop 8H12 Rockville, MD 20852-2738 Mr. M. T. Widmann NRC Senior Resident Inspector North Anna Power Station Mr. G. J. McCoy NRC Senior Resident Inspector Surry Power Station Mr. J. E. Reasor Old Dominion Electric Cooperative Innsbrook Corporate Center 4201 Dominion Boulevard Suite 300 Glen Allen, VA 23060