Brunswick Nuclear Plant April 10, 2002 AProgres Energy Company lb rQU0Y
Unit 1 Performance
- 707 Day Breaker to Breaker Run o LWR Continuous Run World Record
- Refueling Outage Completed in 29 days i Major Extended Power Uprate Modifications Installed Successfully o No Human Performance Events P No Reportable Events o Recordable Accidents and Occupational Dose Lowest Ever CP&L
Unit 2 Performance
- Previous Refueling Outage - 32 days i Completed 157,000 Hours of Maintenance and Modifications P No Human Performance or NRC Reportable Events o Outage Standards Met o Improved Reliability P Increased Production by 4 MWe
- 378 Day Run
- Mid-cycle Safety/Reliability Outage - 04/18/02 i Scheduled 8 Day Duration Q C CP &L
Extended Power Uprate II* 15% Power Increase by2005
- Two Phase Uprate Required I 1st Phase = 7 to 1 0% Increase
- 2002 Unit 1, 2003 Unit 2 o 2nd Phase = 5 to 8% Increase
- 2004 Unit 1, 2005 Unit 2 d 208 MWe Total Increase Expected CP&L
Extended Power Uprate Phase 1 - Modifications
- Replace High Pressure Turbine
- Modify Electro-Hydraulic Controls (EHC)
- Replace Rx Feed Pump Turbines
- Replace Feedwater Heaters (2)
- Improve Grid Stability
- Improve Generator Isophase Cooling
@, CP&L
Extended Power Uprate Phase 2 - Modifications 0I Replace Upgrade Upgrade Replace Upgrade Main Transformers Rx Feed Pumps Condensate Pump & Motor Feedwater Heaters (3)
Moisture Separator Reheaters CP&L
Extended Power Uprate Total Power Addition 2001-200 f.
5 0
I.
+65 MWe 208 MWe 2001 2002 2003 2004 2005 CP&L
License Renewal 0I Project Development License Renewal Submitted for NRC Staff Review 2004 Expiration of B2 Current License 2014 2001 2002 1t ------------
Initiate License Renewal Application Preparation SER Issued; License Approved CP&L
y~WC o' t Combined Capacity Factor 100-,
98-,
96 3 96.9 96-84 8 2-80 I. I II Il 1996 1997 1998 1999 2000 2001 C, CP&L
INPO Index 100-
, C 98 -"9.
96.
94 -
92 -"
939.
90 1
88 -"
86-84 82 80 -IIII 1996 1997 1998 1999 2000 2001 CW~ t&L
- i. w
- Ur, BNP Employee Opinion Survey Results
-#Ait"WWW II 80 75-70-65 60 55 50-X 76.0 V1 1997 1998 1999 2000 2001 CP&L
List of Documents Reviewed 3PP1 And 3PP2 Various Licensee Event Reports and Trending Reports Key and Lock Daily and Annual Inventory Logs for months July, 2001 and March, 2002 Semi-Annual Fitness for Duty Report, July - December, 2001 Brunswick Nuclear Plant/Carolina Power & Light Company:
Brunswick Physical Security Plan Plant Access and Radiation Worker Training, GET SSG Key and Lock Procedure, OSI-01-02 Maintenance and Testing of Security Systems, OSI-12 Vehicular Traffic And Material Access Control, OSI-10 Access Control, Personnel Identification and Badging Procedure, OSI-09 Progress Energy/Carolina Power & Light Company:
Continual Behavior Observation Program, SEC-NGGC-2130 Fitness For Duty Unscheduled Work Call Outs, SEC-NGGC-2141