Carolina Power & Light Presentation from 04/10/2002 NRC Public Meeting Re Brunswick Nuclear Plant
ML021230042
Person / Time
Site: Brunswick  Duke Energy icon.png
Issue date: 04/10/2002
From:
Carolina Power & Light Co
To:
Office of Nuclear Reactor Regulation
Shared Package
ML021230018 List:
References
IR-01-005
Download: ML021230042 (12)


Text

Brunswick Nuclear Plant April 10, 2002 AProgres Energy Company lb rQU0Y

Unit 1 Performance

  • 707 Day Breaker to Breaker Run o LWR Continuous Run World Record
  • Refueling Outage Completed in 29 days i Major Extended Power Uprate Modifications Installed Successfully o No Human Performance Events P No Reportable Events o Recordable Accidents and Occupational Dose Lowest Ever CP&L

Unit 2 Performance

  • Previous Refueling Outage - 32 days i Completed 157,000 Hours of Maintenance and Modifications P No Human Performance or NRC Reportable Events o Outage Standards Met o Improved Reliability P Increased Production by 4 MWe
  • 378 Day Run
  • Mid-cycle Safety/Reliability Outage - 04/18/02 i Scheduled 8 Day Duration Q C CP &L

Extended Power Uprate II* 15% Power Increase by2005

  • Two Phase Uprate Required I 1st Phase = 7 to 1 0% Increase
  • 2002 Unit 1, 2003 Unit 2 o 2nd Phase = 5 to 8% Increase
  • 2004 Unit 1, 2005 Unit 2 d 208 MWe Total Increase Expected CP&L

Extended Power Uprate Phase 1 - Modifications

  • Replace High Pressure Turbine
  • Replace Rx Feed Pump Turbines
  • Improve Grid Stability
  • Improve Generator Isophase Cooling

@, CP&L

Extended Power Uprate Phase 2 - Modifications 0I Replace Upgrade Upgrade Replace Upgrade Main Transformers Rx Feed Pumps Condensate Pump & Motor Feedwater Heaters (3)

Moisture Separator Reheaters CP&L

Extended Power Uprate Total Power Addition 2001-200 f.

5 0

I.

+65 MWe 208 MWe 2001 2002 2003 2004 2005 CP&L

License Renewal 0I Project Development License Renewal Submitted for NRC Staff Review 2004 Expiration of B2 Current License 2014 2001 2002 1t ------------

Initiate License Renewal Application Preparation SER Issued; License Approved CP&L

y~WC o' t Combined Capacity Factor 100-,

98-,

96 3 96.9 96-84 8 2-80 I. I II Il 1996 1997 1998 1999 2000 2001 C, CP&L

INPO Index 100-

, C 98 -"9.

96.

94 -

92 -"

939.

90 1

88 -"

86-84 82 80 -IIII 1996 1997 1998 1999 2000 2001 CW~ t&L

i. w
  • Ur, BNP Employee Opinion Survey Results

-#Ait"WWW II 80 75-70-65 60 55 50-X 76.0 V1 1997 1998 1999 2000 2001 CP&L

List of Documents Reviewed 3PP1 And 3PP2 Various Licensee Event Reports and Trending Reports Key and Lock Daily and Annual Inventory Logs for months July, 2001 and March, 2002 Semi-Annual Fitness for Duty Report, July - December, 2001 Brunswick Nuclear Plant/Carolina Power & Light Company:

Brunswick Physical Security Plan Plant Access and Radiation Worker Training, GET SSG Key and Lock Procedure, OSI-01-02 Maintenance and Testing of Security Systems, OSI-12 Vehicular Traffic And Material Access Control, OSI-10 Access Control, Personnel Identification and Badging Procedure, OSI-09 Progress Energy/Carolina Power & Light Company:

Continual Behavior Observation Program, SEC-NGGC-2130 Fitness For Duty Unscheduled Work Call Outs, SEC-NGGC-2141