Scott A. Bauer Tel. 623-393-5978 Mail Station 7636 Palo Verde Nuclear Department Leader, Fax 623-393-5442 PO Box 52034 Generating Station Regulatory Affairs e-mail: sbauer@apsc.com Phoenix, Arizona 85072-2034 102-04684-SAB/TNW/DWG April 03, 2002 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Mail Station P1-37 Washington, DC 20555-0001

Dear Sirs:

Subject:

Palo Verde Nuclear Generating Station (PVNGS)

Units 1, 2, and 3 Docket Nos. STN 50-528/529/530 Technical Specifications Bases Revision 16 Update Pursuant to PVNGS Technical Specification (TS) 5.5.14, "Technical Specifications Bases Control Program," Arizona Public Service Company (APS) is submitting changes to the TS Bases incorporated into Revision 16, implemented on March 29, 2002. The Revision 16 insertion instructions and replacement pages are provided in the Enclosure.

No commitments are being made to the NRC by this letter.

Should you have any questions, please contact Thomas N. Weber at (623) 393-5764.

Sincerely, SAB/TNW/DWG/kg

Enclosure:

PVNGS Technical Specification Bases Revision 16 Insertion Instructions and Replacement Pages cc: E. W. Merschoff J. N. Donohew J. H. Moorman A member of the STARS (Strategic Teaming and Resource Sharing) Alliance Callaway

  • Comanche Peak e Diablo Canyon
  • Palo Verde
  • Wolf Creek ADO'0

ENCLOSURE PVNGS Technical Specification Bases Revision 16 Insertion Instructions and Replacement Pages

Remove Page: Insert New Page:

Cover page Cover page List of Effective Pages, List of Effective Pages, Pages 1/2 through Pages 1/2 through List of Effective Pages, List of Effective Pages, Page 7/blank Page 7/blank B 3.9.5-1/B 3.9.5-2 B 3.9.5-1/B 3.9.5-2 B 3.9.5-3/B 3.9.5-4 B 3.9.5-3/B 3.9.5-4 B 3.9.5-5/blank

PVNGS Palo Verde Nuclear GeneratingStation Units 1, 2, and 3 Technical Specification Bases Revision 16 March 29, 2002 I

0-

TECHNICAL SPECIFICATION BASES LIST OF EFFECTIVE PAGES Page Rev. Page Rev No. No. No. No.

B 2.1.1-1 0 B 3.1.4-5 0 B 2.1.1-2 0 B 3.1.5-1 0 B 2.1.1-3 10 B 3.1.5-2 12 B 2.1.1-4 0 B 3.1.5-3 0 B 2.1.1-5 0 B 3.1.5-4 0 B 2.1.2-1 0 B 3.1.5-5 7 B 2.1.2-2 0 B 3.1.5-6 0 B 2.1.2-3 0 B 3.1.5-7 1 B 2.1.2-4 0 B 3.1.5-8 1 B 2.1.2-5 0 B 3.1.5-9 0 B 3.0-1 0 B 3.1.5-10 5 B 3.0-2 0 B 3.1.5-11 12 B 3.0-3 0 B 3.1.6-1 0 B 3.0-4 0 B 3.1.6-2 0 B 3.0-5 0 B 3.1.6-3 0 B 3.0-6 1 B 3.1.6-4 0 B 3.0-7 0 B 3.1.7-1 0 B 3.0-8 0 B 3.1.7-2 0 B 3.0-9 0 B 3.1.7-3 0 B 3.0-10 14 B 3.1.7-4 0 B 3.0-11 14 B 3.1.7-5 0 B 3.0-12 14 B 3.1.7-6 0 B 3.0-13 0 B 3.1.7-7 0 B 3.0-14 0 B 3.1.7-8 0 B 3.0-15 0 B 3.1.7-9 0 B 3.0-16 0 B 3.1.8-1 0 B 3.0-17 0 B 3.1.8-2 0 B 3.0-18 0 B 3.1.8-3 0 B 3.0-19 0 B 3.1.8-4 0 B 3.1.1-1 0 B 3.1.8-5 0 B 3.1.1-2 0 B 3.1.9-1 0 B 3.1.1-3 12 B 3.1.9-2 0 B 3.1.1-4 12 B 3.1.9-3 0 B 3.1.1-5 12 B 3.1.9-4 0 B 3.1.1-6 0 B 3.1.9-5 7 B 3.1.2-1 0 B 3.1.9-6 1 B 3.1.2-2 0 B 3.1.10-1 0 B 3.1.2-3 5 B 3.1.10-2 0 B 3.1.2-4 12 B 3.1.10-3 0 B 3.1.2-5 0 B 3.1.10-4 0 B 3.1.2-6 0 B 3.1.10-5 0 B 3.1.2-7 12 B 3.1.10-6 0 B 3.1.2-8 0 B 3.1.11-1 0 B 3.1.2-9 0 B 3.1.11-2 0 B 3.1.3-1 0 B 3.1.11-3 0 "B 3.1.3-2 0 B 3.1.11-4 0 "B 3.1.3-3 0 B 3.1.11-5 0 "B 3.1.3-4 0 B 3.2.1-1 0 "B 3.1.3-5 0 B 3.2.1-2 10 "B3.1.3-6 0 B 3.2.1-3 0 "B 3.1.4-1 0 B 3.2.1-4 0 "B3.1.4-2 0 B 3.2.1-5 0 "B3.1.4-3 0 B 3.2.1-6 0 "B 3.1.4-4 0 B 3.2.1-7 0 PALO VERDE UNITS 1, 2, AND 3 1 Revision 16 March 29, 2002

TECHNICAL SPECIFICATION BASES LIST OF EFFECTIVE PAGES Page Rev. Page Rev No. No. No. No.

3.2.1-8 0 3.3.1-21 15 3.2.2-1 0 3.3.1-22 15 3.2.2-2 10 3.3.1-23 15 3.2.2-3 0 3.3.1-24 15 3.2.2-4 0 3.3.1-25 15 3.2.2-5 1 3.3.1-26 15 3.2.2-6 0 3.3.1-27 15 3.2.2-7 0 3.3.1-28 15 3.2.3-1 0 3.3.1-29 15 3.2.3-2 10 3.3.1-30 15 3.2.3-3 0 3.3.1-31 15 3.2.3-4 0 3 .3 .1-32 15 3.2.3-5 0 3 .3 .1-33 15 3.2.3-6 0 3 .3 .1-34 15 3.2.3-7 0 3.3.1-35 15 3.2.3-8 0 3.3.1-36 15 3.2.3-9 0 3 .3 .1-37 15 3.2.3-10 0 3.3.1-38 15 3.2.4-1 0 3.3.1-39 15 3.2.4-2 10 3 .3.1-40 15 3.2.4-3 0 3 .3.1-41 15 3.2.4-4 0 3 .3.1-42 15 3.2.4-5 0 3 .3.1-43 15 3.2.4-6 0 3.3.2-1 0 3.2.4-7 0 3.3.2-2 0 3.2.4-8 0 3.3.2-3 1 3.2.4-9 0 3.3.2-4 1 3.2.5-1 0 3.3.2-5 0 3.2.5-2 10 3.3.2-6 15 3.2.5-3 0 3.3.2-7 15 3.2.5-4 0 3.3.2-8 15 3.2.5-5 0 3.3.2-9 15 3.2.5-6 0 3.3.2-10 15 3.2.5-7 0 3.3.2-11 15 3.3.1-1 0 3.3.2-12 15 3.3.1-2 0 3.3.2-13 15 3.3.1-3 0 3.3.2-14 15 3.3.1-4 0 3.3.2-15 15 3.3.1-5 0 3.3.2-16 15 3.3.1-6 0 3.3.2-17 15 3.3.1-7 0 3.3.3-1 0 3.3.1-8 0 3.3.3-2 0 3 .3.1-9 15 3 .3.3-3 0 3.3.1-10 0 3.3.3-4 0 3.3.1-11 0 3.3.3-5 7 3.3.1-12 1 3.3.3-6 0 3 .3 .1-13 1 3.3.3-7 0 3 .3 .1-14 0 3.3.3-8 0 3 .3 .1-15 6 3.3.3-9 0 3.3.1-16 0 3.3.3-10 0 3.3.1-17 0 3.3.3-11 0 3.3.1-18. 0 3.3.4-1 0 3.3.1-19 15 3.3.4-2 0 3.3.1-20 15 3.3.4-3 0 PALO VERDE UNITS 1, 2, AND 3 2 Revision 16 March 29, 2002

TECHNICAL SPECIFICATION BASES LIST OF EFFECTIVE PAGES Page Rev. Page Rev No. No. No. No.

3 .3.4-4 0 3.3.6-14 0 3 .3.4-5 0 3.3.6-15 0 3 .3.4-6 0 3 .3.6-16 0 3.3.4-7 0 3 .3.6-17 0 3.3.4-8 0 3 .3.6-18 0 3.3.4-9 0 3 .3.6-19 0 3.3 .4-10 0 3.3.6-20 0 3.3 .4-11 0 3 .3.6-21 3.3 .4-12 0 3 .3.6-22 3.3.4-13 0 3.3.7-1 2 3.3 .4-14 0 3.3.7-2 2 3 .3 .4-15 0 3.3.7-3 0 3.3.5-1 0 3.3.7-4 0 3.3.5-2 0 3.3.7-5 0 3.3.5-3 0 3.3.7-6 0 3.3.5-4 0 3.3.7-7 0 3.3.5-5 0 3.3.7-8 0 3.3.5-6 0 3.3.7-9 2 3.3.5-7 0 3.3.8-1 0 3.3.5-8 0 3.3.8-2 0 3 .3.5-9 0 3.3.8-3 0 3 .3.5-10 0 3.3.8-4 0 3.3.5-11 0 3.3.8-5 0 3 .3 .5-12 1 3.3.8-6 1 3.3 .5-13 0 3.3.8-7 0 3.3 .5-14 0 3.3.8-8 0 3.3.5-15 0 3.3.9-1 0 3.3 .5-16 0 3.3.9-2 2 3.3.5-17 0 3.3.9-3 0 3.3 .5-18 0 3.3.9-4 10 3.3 .5-19 0 3.3.9-5 1 3.3.5-20 1 3.3.9-6 0 3.3.5-21 0 3.3.9-7 0 3.3.5-22 0 3.3.10-1 0 3.3.5-23 0 3.3 .10-2 0 3.3.5-24 0 3.3 .10-3 0 3 .3.5-25 0 3.3.10-4 0 3.3.5-26 0 3.3. 10-5 0 3 .3.5-27 10 3.3.10-6 0 3.3.5-28 10 3.3.10-7 0 3 .3.5-29 10 3.3.10-8 14 3 .3.6-1 0 3.3. 10-9 14 3.3.6-2 0 3.3. 0-10 14 3.3.6-3 0 3.3.10-11 14 3.3 .6-4 0 3.3.10-12 14 3.3 .6-5 0 3 .3 .10-13 14 3.3 .6-6 0 3.3.10-14 14 3.3.6-7 0 3.3.10-15 14 3.3 .6-8 0 3.3.10-16 14 3.3 .6-9 0 3.3.10-17 14 3.3.6-10 0 3.3.10-18 14 3.3 .6-11 0 3 .3.10-19 14 3.3 .6-12 0 3.3.10-20 14 3.3 .6-13 0 3.3.10-21 14 PALO VERDE UNITS 1, 2, AND 3 3 Revision 16 March 29, 2002

TECHNICAL SPECIFICATION BASES LIST OF EFFECTIVE PAGES Page Rev. Page Rev No. No. No. No.

3.3.11-1 0 B 3.4.9-3 1 3.3.11-2 2 B 3.4.9-4 0 3.3.11-3 2 B 3.4.9-5 0 3.3.11-4 2 B 3.4.9-6 0 3.3.11-5 2 B 3.4.10-1 0 3 .3 .11-6 2 B 3.4.10-2 7 33 .11-7 2 B 3.4.10-3 0 3.3.12-1 15 B 3.4.10-4 0 3.3.12-2 15 B 3.4.11-1 0 3.3.12-3 5 B 3.4.11-2 7 3.3.12-4 5 B 3.4.11-3 0 3.3.12-5 6 B 3.4.11-4 0 3.3.12-6 6 B 3.4.11-5 0 3.4.1-1 10 B 3.4.11-6 0 3.4.1-2 7 B 3.4.12-1 1 3.4.1-3 0 B 3.4.12-2 1 3.4.1-4 0 B 3.4.12-3 3.4.1-5 0 B 3.4.12-4 0 3.4.2-1 7 B 3.4.12-5 0 3.4.2-2 1 B 3.4.13-1 0 3.4.3-1 0 B 3.4.13-2 0 3.4.3-2 0 B 3.4.13-3 1 3.4.3-3 0 B 3.4.13-4 0 3.4.3-4 2 B 3.4.13-5 0 3.4.3-5 2 B 3.4.13-6 0 3.4.3-6 0 B 3.4.13-7 2 3.4.3-7 0 B 3.4.13-8 2 3.4.3-8 2 B 3.4.13-9 0 3.4.4-1 0 B 3.4.13-10 2 3.4.4-2 7 B 3.4.14-1 0 3.4.4-3 7 B 3.4.14-2 2 3.4.4-4 0 B 3.4.14-3 2 3.4.5-1 0 B 3.4.14-4 7 3.4.5-2 6 B 3.4.14-5 2 3.4.5-3 6 B 3.4.14-6 2 3.4.5-4 0 B 3.4.14-7 2 3.4.5-5 6 B 3.4.15-1 0 3.4.6-1 0 B 3.4.15-2 0 3.4.6-2 6 B 3.4.15-3 0 3.4.6-3 6 B 3.4.15-4 0 3.4.6-4 6 B 3.4.15-5 0 3.4.6-5 6 B 3.4.15-6 0 3.4.7-1 0 B 3.4.15-7 0 3.4.7-2 6 B 3.4.16-1 2 3.4.7-3 6 B 3.4.16-2 10 3.4.7-4 2 B 3.4.16-3 0 3.4.7-5 0 B 3.4.16-4 0 3.4.7-6 0 B 3.4.16-5 0 3.4.7-7 6 B 3.4.16-6 0 3.4.8-1 0 B 3.4.17-1 0 3.4.8-2 6 B 3.4.17-2 0 3.4.8-3 6 B 3.4.17-3 0 3.4.9-1 0 B 3.4.17-4 0 3.4.9-2 0 B 3.4.17-5 0 PALO VERDE UNITS 1, 2, AND 3 4 Revision 16 March 29, 2002

TECHNICAL SPECIFICATION BASES LIST OF EFFECTIVE PAGES Page Rev. Page Rev No. No. No. No.

B 3.4.17-6 0 B 3.6.2-4 0 B 3.5.1-1 0 B 3.6.2-5 0 B 3.5.1-2 0 B 3.6.2-6 0 B 3.5.1-3 7 B 3.6.2-7 0 B 3.5.1-4 0 B 3.6.2-8 0 B 3.5.1-5 0 B 3.6.3-1 0 B 3.5.1-6 0 B 3.6.3-2 0 B 3.5.1-7 1 B 3.6.3-3 0 B 3.5.1-8 1 B 3.6.3-4 1 B 3.5.1-9 0 B 3.6.3-5 1 B 3.5.1-10 1 B 3.6.3-6 1 B 3.5.2-1 0 B 3.6.3-7 1 0 B 3.6.3-8 11 B 3.5.2-2 B 3.5.2-3 0 B 3.6.3-9 1 B 3.5.2-4 0 B 3.6.3-10 11 B 3.6.3-11 11 B 3.5.2-5 0 0 B 3.6.3-12 11 B 3.5.2-6 B 3.5.2-7 1 B 3.6.3-13 1 B 3.5.2-8 1 B 3.6.3-14 1 B 3.5.2-9 1 B 3.6.3-15 1 B 3.5.2-10 1 B 3.6.3-16 1 B 3.5.3-1 0 B 3.6.3-17 1 B 3.5.3-2 B 3.6.4-1 0 B 3.5.3-3 B 3.6.4-2 1 B 3.5.3-4 0 B 3.6.4-3 1 B 3.5.3-5 0 B 3.6.5-1 0 B 3.5.3-6 B 3.6.5-2 1 B 3.5.3-7 2 B 3.6.5-3 0 0 0 B 3.5.3-8 1 B 3.6.5-4 B 3.5.3-9 0 B 3.6.6-1 0 B 3.5.3-10 2 B 3.6.6-2 0 2 1 B 3.5.4-1 B 3.6.6-3 B 3.5.4-2 "B3.6.6-4 7 B 3.5.4-3 "B 3.6.6-5 1 B 3.5.5-1 0 "B 3.6.6-6 0 B 3.5.5-2 7 B 3.6.6-7 1 B 3.5.5-3 4015 B 3.6.6-8 1 B 3.5.5-4 40 B 3.6.6-9 0 B 3.5.5-5 0 B 3.6.7-1 0 B 3.5.5-6 0 B 3.6.7-2 0 B 3.5.5-7 0 B 3.6.7-3 0 B 3.5.6-1 0 B 3.6.7-4 0 B 3.5.6-2 1 B 3.6.7-5 0 0 B 3.7.1-1 7 B 3.5.6-3 B 3.5.6-4 1 B 3.7.1-2 7 B 3.5.6-5 0 B 3.7.1-3 0 B 3.6.1-1 0 B 3.7.1-4 0 B 3.6.1-2 0 B 3.7.1-5 1 B 3.6.1-3 0 B 3.7.1-6 7 B 3.6.1-4 0 B 3.7.2-1 0 B 3.6.1-5 0 B 3.7.2-2 0 B 3.6.2-1 0 B 3.7.2-3 0 B 3.6.2-2 6 B 3.7.2-4 0 B 3.6.2-3 0 B 3.7.2-5 0 PALO VERDE UNITS 1, 2, AND 3 5 Revision 16 March 29, 2002

TECHNICAL SPECIFICATION BASES LIST OF EFFECTIVE PAGES Page Rev. Page Rev No. No. No. No.

"B 3.7.2-6 0 3.7.13-4 0 "B 3.7.3-1 1 3 .7 .13-5 0 "B 3.7.3-2 1 3 .7 .14-1 0 "B 3.7.3-3 1 3 .7 .14-2 0 "B 3.7.3-4 0 3 .7 .14-3 0 "B 3.7.3-5 0 3 .7 .15-1 3 "B 3.7.4-1 0 3 .7.15-2 3 "B 3.7.4-2 0 3 .7 .16-1 7 "B 3.7.4-3 0 3 .7 .16-2 0 "B 3.7.4-4 0 3 .7.16-3 0 "B 3.7.5-1 0 3 .7 .16-4 0 "B 3.7.5-2 3 .7 .17-1 3 "B 3.7.5-3 3 .7 .17-2 3 "B 3.7.5-4 9 3 .7 .17-3 3 "B 3.7.5-5 0 9 3 .7.17-4 3 "B 3.7.5-6 9 3 .7 .17-5 3 B 3.7.5-7 9 3 .7.17-6 3 "B 3.7.5-8 9 3.8.1-1 0 "B 3.7.5-9 9 3.8.1-2 2 "B 3.7.5-10 3.8.1-3 13 B.3 .7.5-11 3.8.1-4 2 B 3.7.6-1 0 3.8.1-5 2 B 3.7.6-2 0 3.8.1-6 2 B 3.7.6-3 5 3.8.1-7 2 B 3.7.6-4 0 3.8.1-8 2 B 3.7.7-1 0 3.8.1-9 2 B 3.7.7-2 1 3 .8 .1-10 2 B 3.7.7-3 1 3 .8. 1-11 2 B 3.7.7-4 1 3 .8 .1-12 2

3.8 .1-13 B 3.7.7-5 1 2 B 3.7.8-1 1 3 .8 .1-14 2 B 3.7.8-2 1 3 .8 .1-15 2 B 3.7.8-3 1 3 .8 .1-16 2 B 3.7.8-4 1 3 .8 .1-17 2 B 3.7.9-1 0 3 .8.1-18 2 B 3.7.9-2 1 3 .8.1-19 13 B 3.7.9-3 0 3.8.1-20 13 B 3.7.10-1 10 3 .8.1-21 13 B 3.7.10-2 1 3 .8.1-22 13 B 3.7.10-3 1 3 .8.1-23 6 B 3.7.10-4 1 3 .8.1-24 6 B 3.7.11-1 0 3.8.1-25 6 B 3.7.11-2 0 3.8.1-26 6 B 3.7.11-3 1 3.8.1-27 6 B 3.7.11-4 10 3.8.1-28 6 B 3.7.11-5 10 3.8.1-29 6 B 3.7.11-6 10 3.8.1-30 6 B 3.7.12-1 1 3.8.1-31 6 B 3.7.12-2 1 3.8.1-32 6 B 3.7.12-3 10 3.8.1-33 6 B 3.7.12-4 10 3.8.1-34 6 B 3.7.13-1 0 3 .8.1-35 6 B 3 .7.13-2 0 3.8.1-36 6 B 3 .7.13-3 0 3.8.1-37 6 PALO VERDE UNITS 1, 2, AND 3 6 Revision 16 March 29, 2002

TECHNICAL SPECIFICATION BASES LIST OF EFFECTIVE PAGES Page Rev. Page Rev No. NO. No. No.

3 .8.1-38 3.8.9-3 0 3 .8.1-39 3.8.9-4 0 3.8.1-40 3.8.9-5 0 3 .8.1-41 3.8.9-6 0 3.8.2-1 3.8.9-7 0 3.8.2-2 3.8.9-8 0 3.8.2-3 3.8.9-9 0 3.8.2-4 3.8.9-10 0 3.8.2-5 3.8.9-11 0 3.8.2-6 3.8 .10-1 0 3.8.3-1 3.8 .10-2 0 3.8.3-2 3.8 .10-3 0 3.8.3-3 3.8.10-4 0 3.8.3-4 3.9 .1-1 0 3.8.3-5 3.9.1-2 0 3.8.3-6 3.9 .1-3 0 3.8.3-7 3.9 .1-4 0 3.8.3-8 3.9.2-1 15 3.8.3-9 3.9.2-2 15 3.8.4-1 3.9.2-3 15 3.8.4-2 3.9.2-4 15 3 .8.4-3 3.9.3-1 0 3.8.4-4 3.9.3-2 0 3.8.4-5 3.9.3-3 0 3.8.4-6 3.9.3-4 0 3.8.4-7 3.9.3-5 1 3.8.4-8 3.9.4-1 0 3.8.4-9 3.9.4-2 1 3.8.4-10 3.9.4-3 0 3.8.4-11 3.9.4-4 0 3 .8.5-1 3.9.5-1 0 3.8.5-2 3.9.5-2 16 3 .8.5-3 3.9.5-3 16 3 .8.5-4 3.9.5-4 16 3.8.5-5 3.9.5-5 16 3.8.5-6 3.9.6-1 0 3.8.6-1 3.9.6-2 0 3.8.6-2 3.9.6-3 0 3.8.6-3 3.9.7-1 0 3.8.6-4 3.9.7-2 0 3.8. 6-5 3.9.7-3 0 3.8. 6-6 3.8 .6-7 3.8.7-1 3.8.7-2 3.8.7-3 3.8.7-4 3.8.8-1 3.8 .8-2 3.8.8-3 3.8.8-4 3.8.8-5 3.8.9-1 3.8 .9-2 PALO VERDE UNITS 1, 2, AND 3 7 Revision 16 March 29, 2002

SDC and Coolant Circulation - Low Water Level B 3.9.5 B 3.9 REFUELING OPERATIONS B 3.9.5 Shutdown Cooling (SDC) and Coolant Circulation - Low Water Level BASES BACKGROUND The purposes of the SDC System in MODE 6 are to remove decay heat and sensible heat from the Reactor Coolant System (RCS), as required by GDC 34, to provide mixing of borated coolant, to provide sufficient coolant circulation to minimize the effects of a boron dilution accident, and to prevent boron stratification (Ref. 1). Heat is removed from the RCS by circulating reactor coolant through the SDC heat exchanger(s), where the heat is transferred to the Essential Cooling Water System via the SDC heat exchanger(s). The coolant is then returned to the RCS via the RCS cold leg(s).

Operation of the SDC System for normal cooldown or decay heat removal is manually accomplished from the control room.

The heat removal rate is adjusted by controlling the flow of reactor coolant through the SDC heat exchanger(s) and bypassing the heat exchanger(s). Mixing of the reactor coolant is maintained by this continuous circulation of reactor coolant through the SDC System.

APPLICABLE If the reactor coolant temperature is not maintained below SAFETY ANALYSES 200 0 F, boiling of the reactor coolant could result. This could lead to inadequate cooling of the reactor fuel due to the resulting loss of coolant in the reactor vessel.

Additionally, boiling of the reactor coolant could lead to a reduction in boron concentration in the coolant due to the boron plating out on components near the areas of the boiling activity, and because of the possible addition of water to the reactor vessel with a lower boron concentration than is required to keep the reactor subcritical. The loss of reactor coolant and the reduction of boron concentration in the reactor coolant would eventually challenge the integrity of the fuel cladding, which is a fission product barrier. Two trains of the SDC System are required to be OPERABLE, and one train is required to be in operation in MODE 6, with the water level < 23 ft above the top of the reactor vessel flange, to prevent this challenge.

SDC and Coolant Circulation - Low Water Level satisfies Criterion 2 of 10 CFR 50.36 (c)(2)(ii).

(continued)

PALO VERDE UNITS 1,2,3 B 3.9.5-1 REVISION 0

SDC and Coolant Circulation - Low Water Level B 3.9.5 BASES LCO In MODE 6, with the water level < 23 ft above the top of the reactor vessel flange, both SDC loops must be OPERABLE.

Additionally, one loop of the SDC System must be in operation in order to provide:

a. Removal of decay heat;
b. Mixing of borated coolant to minimize the possibility of a criticality; and
c. Indication of reactor coolant temperature.

An OPERABLE SDC train is composed of an OPERABLE SDC pump (LPSI or CS) capable of providing flow to the SDC heat exchanger for heat removal. SDC pumps are OPERABLE if they are capable of being powered and are able to provide flow (current Section XI), if required.

Both SDC pumps may be aligned to the Refueling Water Tank (RWT) to support filling the refueling cavity or for performance of required testing.

The LCO is modified by a Note that allows a required operating SDC loop to be removed from service for up to 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> in each 8 hour9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> period, provided no operations are permitted that would cause a reduction of the RCS boron concentration. Boron concentration reduction is prohibited because uniform concentration distribution cannot be ensured without forced circulation. This permits operations such as core mapping or alterations in the vicinity of the reactor vessel hot leg nozzles, surveillance testing of ECCS pumps, and RCS to SDC isolation valve testing. During this 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> period, decay heat is removed by natural convection to the large mass of water in the refueling cavity.

This LCO is modified by a Note that allows one SDC loop to be inoperable for a period of 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> provided the other loop is OPERABLE and in operation. Prior to declaring the loop inoperable, consideration should be given to the existing plant configuration. This consideration should include that the core time to boil is not short, there is no draining operation to further reduce RCS water level and that the capacity exists to inject borated water into the reactor vessel. This permits surveillance tests to be performed on the non-operating loop during a time when these tests are safe and possible.

(continued)

PALO VERDE UNITS 1,2,3 B 3.9.5-2 REVISION 16

SDC and Coolant Circulation - Low Water Level B 3.9.5 BASES APPLICABILITY Two SDC loops are required to be OPERABLE, and one SDC loop must be in operation in MODE 6, with the water level < 23 ft above the top of the reactor vessel flange, to provide decay heat removal. Requirements for the SDC System in other MODES are covered by LCOs in Section 3.4, Reactor Coolant System. MODE 6 requirements, with a water level Ž 23 ft above the reactor vessel flange, are covered in LCO 3.9.4, "Shutdown Cooling and Coolant Circulation - High Water Level."

ACTIONS A.1 and A.2 If one SDC loop is inoperable, action shall be immediately initiated and continued until the SDC loop is restored to OPERABLE status and to operation, or until Ž 23 ft of water level is established above the reactor vessel flange. When the water level is established at Ž 23 ft above the reactor vessel flange, the Applicability will change to that of LCO 3.9.4, "Shutdown Cooling and Coolant Circulation - High Water Level," and only one SDC loop is required to be OPERABLE and in operation. An immediate Completion Time is necessary for an operator to initiate corrective actions.

B.1 If no SDC loop is in operation or no SDC loops are OPERABLE, there will be noforced circulation to provide mixing to establish uniform boron concentrations. Reduced boron concentrations can occur by the addition of water with lower boron concentration than that contained in the RCS.

Therefore, actions that reduce boron concentration shall be suspended immediately.

B.2 If no SDC loop is in operation or no SDC loops are OPERABLE, action shall be initiated immediately and continued without interruption to restore one SDC loop to OPERABLE status and operation. Since the unit is in Conditions A and B concurrently, the restoration of two OPERABLE SDC loops and one operating SDC loop should be accomplished expeditiously.

(continued)

PALO VERDE UNITS 1,2,3 B 3.9.5-3 REVISION 16

SDC and Coolant Circulation - Low Water Level B 3.9.5 BASES ACTIONS B.3 (Continued)

If no SDC loop is in operation or no SDC loops are OPERABLE, all containment penetrations providing direct access from the containment atmosphere to the outside atmosphere must be closed within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />. With the SDC loop requirements not met, the potential exists for the coolant to boil and release radioactive gas to the containment atmosphere.

Closing containment penetrations that are open to the outside atmosphere ensures that dose limits are not exceeded.

The Completion Time of 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> is reasonable, based on the low probability of the coolant boiling in that time.

SURVEILLANCE SR 3.9.5.1 REQUIREMENTS This Surveillance demonstrates that one SDC loop is operating and circulating reactor coolant at a flowrate of greater than or equal to 3780 gpm. The flow rate is determined by the flow rate necessary to provide sufficient decay heat removal capability and to prevent thermal and boron stratification in the core. In addition, this Surveillance demonstrates that the other SDC loop is OPERABLE.

In addition, during operation of the SDC loop with the water level in the vicinity of the reactor vessel nozzles, the SDC loop flow rate determination must also consider the SDC pump suction requirements. The Frequency of 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> is sufficient, considering the flow, temperature, pump control, and alarm indications available to the operator to monitor the SDC System in the control room.

Verification that the required loops are OPERABLE and in operation ensures that loops can be placed in operation as needed, to maintain decay heat and retain forced circulation. The Frequency of 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> is considered reasonable, since other administrative controls are available and have proven to be acceptable by operating experience.

(continued)

PALO VERDE UNITS 1,2,3 B 3.9.5-4 REVISION 16

SDC and Coolant Circulation - Low Water Level B 3.9.5 BASES SURVEILLANCE SR 3.9.5.2 REQUIREMENETS (continued)

Verification that the required pump that is not in operation is OPERABLE ensures that an additional SDC pump can be placed in operation, if needed, to maintain decay heat removal and reactor coolant circulation. Verification is performed by verifying proper breaker alignment and power available to the required pump. The Frequency of 7 days is considered reasonable in view of other administrative controls available and has been shown to be acceptable by operating experience.

REFERENCES 1. UFSAR, Section 5.4.7.

PALO VERDE UNITS 1,2,3 B 3.9.5-5 REVISION 16

This page intentionally blank