ADMINISTRATIVE TOPICS Facility:

HOPE CREEK Date of Examination:

3/11/02 Examination Level:

-- RO

[

SRO Operating Test Number:

TOPIC:

A.1-1 QUESTION:

1 Subject

Description:

Plant Parameter Verification K/A:

2.1.25 Ability to obtain and interpret station reference materials such as graphs/monographs/and tables which contain data. (3.1)

DESCRIPTION:

Question-Given plant conditions, determine the required Circulation Water System requirements for extreme cold weather.

QUESTION:

Given the following:

Three (3) Circulating Water Pumps are in operation HV-2174, A&B CLG TWR DE-ICING VALVES are open

  • Average Basin water temperature Computer Point A2769 is 55F Outside ambient air temperature is 25F Cooling Tower Blowdown return temperature (daily average) is 75F Thermal release rate to the river is 576 MBtu's/hr A small amount of ice has formed on the Fill support Columns and Beams of the Cooling Tower
  • There is a very small ice formation on the Fill Sheets between the supports
  • Minimal ice has formed on the Support Columns Determine if any actions are required for continued operation of the Circulating Water System.

ANSWER:

Reference HC.OP-SO.DA-0001 Per 5.3.4.A.1, Four Circulating Water Pumps should be in operation.

The current operating region is in CENTRAL SHUT-OFF VALVES CLOSED (Att.1)

Operation of HV-2174 A&B is not required because ice formation is within the recommendations of Note 5.3.7, but continuous monitoring is required.

SROQuestionAl-1-1.doc EXAMINER COPY Page 1 of 1

ADMINISTRATIVE TOPICS Given the following:

"* Three (3) Circulating Water Pumps are in operation

"* HV-2174, A&B CLG TWR DE-ICING VALVES are open

"* Average Basin water temperature Computer Point A2769 is 55F

"* Outside ambient air temperature is 25F

"* Cooling Tower Blowdown return temperature (daily average) is 75F

"* Thermal release rate to the river is 576 MBtu's/hr

"* A small amount of ice has formed on the Fill support Columns and Beams of the Cooling Tower

"* There is a very small ice formation on the Fill Sheets between the supports

"* Minimal ice has formed on the Support Columns Determine if any actions are required for continued operation of the Circulating Water System.

CANDIDATE COPY Page 1 of 1

ADMINISTRATIVE TOPICS Facility:

HOPE CREEK Date of Examination:

3/11/02 Examination Level:

E] RO Z

SRO Operating Test Number:

TOPIC:

A.1-1 QUESTION:

2 Subject

Description:

Plant Parameter Verification K/A:

2.1.25 Ability to obtain and interpret station reference materials such as graphs/mongraphs/and tables which contain data. (4.4)

DESCRIPTION:

Question-Calculate time to Secondary Containment is required following a loss of Shutdown Cooling.

QUESTION:

Given the following:

"* The Reactor scrammed 110 hours0.00127 days <br />0.0306 hours <br />1.818783e-4 weeks <br />4.1855e-5 months <br /> ago from extended operation.

"* B RHR is in shutdown cooling

"* RCS temperature is 140F

"* Secondary Containment has been relaxed.

How long until Secondary Containment integrity is required if all normal and alternate means of decay heat removal were lost?

ANSWER:

Reference HC.OP-AB.ZZ-0142 Secondary containment is required when RCS temperature is >200F.

Per Figure 1, 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> and 15 minutes (+5 minutes)

SROQuestionAl-1-2.doc EXAMINER COPY Page 1 of 1

ADMINISTRATIVE TOPICS Given the following:

"* The Reactor scrammed 110 hours0.00127 days <br />0.0306 hours <br />1.818783e-4 weeks <br />4.1855e-5 months <br /> ago from extended operation.

"* B RHR is in shutdown cooling

"* RCS temperature is 140F

"* Secondary Containment has been relaxed.

How long until Secondary Containment integrity is required if all normal and alternate means of decay heat removal were lost?

CANDIDATE COPY Page 1 of 1

OPERATOR TRAINING PROGRAM JOB PERFORMANCE MEASURE STATION:

SYSTEM:

TASK:

TASK NUMBER:

JPM NUMBER:

HOPE CREEK Administrative Perform A Shift Turnover As On-Coming CRS Complete key verification required during CRS shift turnover.

2990130302

[SRO A.1.2]

ALTERNATE PATH:

APPLICABILITY:

EO =

K/A NUMBER:

IMPORTANCE FACTOR:

RO =

STA =

SRO LIII EVALUATION SETTINGIMETHOD:

Main Control Room/Perform

REFERENCES:

SH.OP-AP.ZZ-0107(Q), Revision 2 SH.OP-DD.ZZ-0065(Z), Revision 4 TOOLS AND EQUIPMENT:

None VALIDATED JPM COMPLETION TIME:

(3) Minutes TIME PERIOD IDENTIFIED FOR TIME CRITICAL STEPS:

N/A CAUTION:

No plant equipment shall be operated during the performance of a JPM without the following:

1. Permission from the OS or Unit CRS;
2. Direct oversight by a qualified individual (determined by the individual granting permission based on plant conditions).
3. Verification of the "as left" condition by a qualified individual.

Page 1 of 7 2.1.3 RO 3.4 SRO ACTUAL JPM COMPLETION TIME:

Minutes ACTUAL TIME CRITICAL COMPLETION:

N/A JPM PERFORMED BY:

GRADE: D SAT FD1 UNSAT REASON, IF UNSATISFACTORY:

EVALUATOR'S SIGNATURE:

DATE:

OPERATOR TRAINING PROGRAM JOB PERFORMANCE MEASURE NAME:

DATE:

SYSTEM:

TASK:

Administrative Perform A Shift Turnover As On-Coming CRS Complete key verification required during CRS shift turnover.

TASK NUMBER:

2990130302 INITIAL CONDITIONS:

1.

You are the on-coming day shift Control Room Supervisor.

2.

SH.OP-AP.ZZ-0107(Q), ATTACHMENT 2a, Hope Creek - Control Room Supervisor/Shift Technial Advisor Relief Checklist, is in progress.

INITIATING CUE:

Turnover the CRS Key Ring and ENSURE you have received all the required CRS keys.

Page 2 of 7 Successful Completion Criteria:

1. All critical steps completed.
2. All sequential steps completed in order.
3. All time-critical steps completed within allotted time.
4. JPM completed within validated time. Completion time may exceed the validated time if satisfactory progress is being made.

OPERATOR TRAINING PROGRAM JOB PERFORMANCE MEASURE Administrative Perform A Shift Turnover As On-Comina CRS/Comolete key verification reauired durina CRS shift turnover.

STEP STEP COMMENTS NO.

(*Denotes a Critical Step)

STANDARD EVAL (Required for UNSAT

(#Denotes a Sequential Step)

S/U evaluation)

Operator obtains and locates Operator obtains the correct procedure.

procedure SH.OP-AP.ZZ-0107(Q).

5.3.2 Control Board Walk-Downs Operator obtains a copy of Attachment

3.

All oncoming licensed operators (except the OS as described below)

Examiner Cue: Provide the operator should WALK-DOWN the control with Attachment 3.

boards under their cognizance with the off-going operator verifying checklist items. Discussions should include, but are not limited to:

"* Status of safety-related systems

[CD-787D]

"* Running equipment and train alignments

"* Inoperable equipment and Limiting Conditions for Operations, including surveillance requirements

"* Reasons for annunciator alarms

"* Tagged equipment including any surveillance or equipment work in progress at time of shift relief

"* Unusual occurrences during the last 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> Operator obtains and locates Operator obtains the correct procedure.

procedure SH.OP-DD.ZZ-0065(Z).

Page 3 of 7 SYSTEM:

TASK:

NAME:

DATE:

SYSTEM:

TASK:

OPERATOR TRAINING PROGRAM JOB PERFORMANCE MEASURE Administrative Perform A Shift Turnover As On-Cominq CRS/Complete key verification required during NAME:

DATE:

CRS shift turnover.

STEP STEP COMMENTS NO.

(*Denotes a Critical Step)

STANDARD EVAL (Required for UNSAT

(#Denotes a Sequential Step)

S/U evaluation)

Operator determines beginning step Operator determines correct beginning of the procedure.

step of procedure to be 5.3.3.

Examiner Note: Initialling and dating START TIME: is NOT critical.

Key rings are turned over from shift to Operator locates the CRS key ring and 5.3.3 shift lAW SH.OP-AP.ZZ-0107(Q),

verifies that all keys listed in Shift Turnover Responsibilities., Hope Creek Key Inventory - Key Rings, of SH.OP A. The oncoming operator must DD.ZZ-0065(Z) are present.

ensure the relieving operator receives the duty keys.

Once satisfied that all keys are accounted for, the operator initials B. Lost rings or keys must be a, Hope Creek - Control reported to the WCCS Room Supervisor/Shift Technial Advisor immediately and to the Key Relief Checklist Control Coordinator on the next working day.

Examiner Note: Initialling and dating a is NOT critical.

STOP TIME:

Terminating Cue: Repeat back message from the operator on the status of the JPM, and then state "This JPM is complete" Page 4 of 7

JOB PERFORMANCE MEASURE INITIAL CONDITIONS:

1. You are the on-coming day shift Control Room Supervisor.
2. SH.OP-AP.ZZ-0107(Q), ATTACHMENT 2a, Hope Creek - Control Room Supervisor/Shift Technial Advisor Relief Checklist, is in progress.

INITIATING CUE:

Turnover the CRS Key Ring and ENSURE you have received all the required CRS keys.

Page 5 of 7

EXAMINER'S COPY TRAINING ONLY SH.OP-AP.ZZ-0107(Q)

ATTACHMENT 2a HOPE CREEK - CONTROL ROOM SUPERVISOR/SHIFT TECHNIAL ADVISOR RELIEF CHECKLIST (Page 1 of 1)

Date:

DATE Oncoming Check Off (Review the Following Prior to Relief):

DA

1.

CRS Narrative Log

2.

Night Orders - Read and Initialed

3.

Main Control Boards (10C650, 10C651)

4.

Action Statement Log (AP-1 08)

5.

Review P1 (IF not STA, N/A)

6.

INOP Instrument/Alarm Log (DL-10)

7.

Turnover CRS Keys Init

8.

Review STA - 6 hour6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> Checklist (IF not STA, N/A)

After Relief Check Off (Review/Perform As Soon As Practical):

1.

Shift Chemistry Summary

2.

RO/PO Narrative and Console Logs, and Equipment Status Checklist, Temporary Readings Logs (DL-27)

3.

Verification by the STA that GETARS is in the "Sentinel Mode". (If not the STA, N/A)

4.

Review Shift Manning (Attachment 5) and review 12 hour1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> shift book for manning requirements.

5.

Review Installed T - Mod Status

6.

Review CROD Book YS NIGHTS als DAYS NIGHTS Oncoming CRS/STA (Days)

Oncoming CRS/STA (Nights)

Review information back to last time on shift or 72 hrs.

If > 5 days, review previous 5 days after relief.

Review unexpired Night Orders since last time on shift.

Salem/Hope Creek CD-421Y CD-421Y CD-421Y CD-975E CD-421Y CD-421Y CD-740A NOTE:

m m

Rev. 2 Page 11 of 56

EXAMINER'S COPY TRAI NIN G ONLY SH.OP-DD.ZZ-0065(Z)

ATTACHMENT 2 (Page 2of 2)

HOPE CREEK KEY INVENTORY - KEY RINGS I

DESCRIPTION KEY ID INITIALS DATE A Master I

AM I

Initials u are D Master DM Initials Date Maint Master FAM Initials Date G Master GM Initials Date KIRK EMG TAKEOVER RE1095 Initials Date R Master RM Initials Date Duress HC DURESS Initials Date Duress Reset DURESS Initials Date RESET Iias t

14M59 Initials Date G2 Initials Date Elevator EVEL Initials Date Unit 2 Access L22 Initials Date Elevator ELEV Initials Date 92238 Initials Date C026 Initials Date 1092H Initials Date R06 Initials Date SM733 Initials Date Master Pad Lock 2179 Initials Date HV F026B HVF026B Initials Date A Master AM Blue Core Master BCM SC Master CM S:,*D Master DM Maint. Master FAM Maint. Master FM SG Master GM Rad Pro Door Master HRGM I&C Master IM Unit 2 Access L22 MR Master MRM Security Supply cabinet L256 CAT1Q05 CORBIN 1092H 429 Duress Reset DURESS RESET RP ElevtorEVEL A96 L5 14M59 Master Pad Lock 2179 A798 TukkyFORD-H-2 Breaking Glass Key Box Y1 1 Ub0Iranstormer Cubicle 2123 Doors Salem / Hope Creek Page 12 of 28 Rev. 4

OPERATOR TRAINING PROGRAM JOB PERFORMANCE MEASURE STATION:

SYSTEM:

TASK:

TASK NUMBER:

JPM NUMBER:

ALTERNATE PATH:

APPLICABILITY:

EO =

HOPE CREEK Administrative Review All Operations Logs In Use During A Shift Perform Drywell Air Temperature Operability Check 2992320302 SRO A2 RO =

K/A NUMBER:

IMPORTANCE FACTOR:

STA =

SRO LFl 2.2.12 RO EVALUATION SETTING/METHOD:

Simulator/Perform

REFERENCES:

HC.OP-DL.ZZ-0026(Q), Rev.: 80 TOOLS AND EQUIPMENT:

None VALIDATED JPM COMPLETION TIME:

(2) Minutes TIME PERIOD IDENTIFIED FOR TIME CRITICAL STEPS:

CAUTION:

No plant equipment shall be operated during the performance of a JPM without the following:

1. Permission from the OS or Unit CRS;
2. Direct oversight by a qualified individual (determined by the individual granting permission based on plant conditions).
3. Verification of the "as left" condition by a qualified individual.

Page 1 of 6 3.4 SRO N/A ACTUAL JPM COMPLETION TIME:

Minutes ACTUAL TIME CRITICAL COMPLETION:

N/A JPM PERFORMED BY:

GRADE:

ISAT DUNSAT REASON, IF UNSATISFACTORY:

EVALUATOR'S SIGNATURE:

DATE:

OPERATOR TRAINING PROGRAM JOB PERFORMANCE MEASURE NAME:

DATE:

Administrative Review All Operations Logs In Use During A Shift Perform Drywell Air Temperature Operability Check TASK NUMBER:

2992320302 INITIAL CONDITIONS:

1. SPDS is out of service.

INITIATING CUE:

Complete the Attachment 1 a, Item 31, of HC.OP-DL.ZZ-0026(Q), CRS/OS Verification of Drywell Air Temperature. (Provided)

Page 2 of 6 SYSTEM:

TASK:

Successful Completion Criteria:

1. All critical steps completed.
2. All sequential steps completed in order.
3. All time-critical steps completed within allotted time.
4. JPM completed within validated time. Completion time may exceed the validated time if satisfactory progress is being made.

OPERATOR TRAINING PROGRAM JOB PERFORMANCE MEASURE NAME:

DATE:

Administrative Review All Operations Logs In Use During A Shift/Perform Drywell Air Temperature Operability Check STEP COMMENTS

(*Denotes a Critical Step)

STANDARD EVAL (Required for UNSAT

(#Denotes a Sequential Step)

S/U evaluation)

Operator manipulates CRIDS to view the required inputs.

START TIME:

Examiner Note: See Attached.

Operator determines that there is at least one operable input for each zone, circles SAT, and initials in the CRS/OS area.

Examiner Note: See Attached.

STOP TIME:

Terminating Cue: Repeat back message from the operator on the status of the JPM, and then state "This JPM is complete" Page 3 of 6 SYSTEM:

TASK:

JOB PERFORMANCE MEASURE INITIAL CONDITIONS:

1. SPDS is out of service.

INITIATING CUE:

Complete the Attachment la, Item 31, of HC.OP-DL.ZZ-0026(Q), CRSIOS Verification of Drywell Air Temperature. (Provided)

Page 4 of 6

JOB PERFORMANCE MEASURE SIMULATOR INSTRUCTIONS Reset to IC-1.

Insert Malfunction CC-03, SPDS Failure.

Remove the following CRIDS points from scan using the instructor station CRIDS terminal.

A2265 A2273 A2275 A2280 A2281 A2286 RETURN COMPUTER POINTS TO NORMAL FOLLOWING JPM COMPLETION.

Page 5 of 6

PSEG Internal Use Only HC.OP-DL.ZZ-0026(Q)

Page 6 of 17 ATTACHMENT la Surveillance Log - Control Room HCGS Operational Condition Date NOTES:

I. DURING NORMAL OPERATION, DRYWELL AIR TEMPERATURE HAS BEEN 90-I 107F. ANY VALUE OUTSIDE THIS RANGE SHOULD BE INVESTIGATED. IF COMPUTER POINT B5070 IS INOP, DRYWELL TEMPERATURE MAY BE OBTAINED BY COMPLETING ATT 3Q.

2. (*) - WHEN HANDLING IRRADIATED FUEL IN THE SECONDARY CONTAINMENT AND DURING CORE ALTERATIONS AND OPERATIONS WITH A POTENTIAL FOR DRAINING THE REACTOR VESSEL.

Page 23 of 99 ITEM SURVEILLANCE OPER ACCEPTABLE LIMITS INSTRUMENT (PANEL)

DAY EVE MID COMMENTS COND MIN NORM MAX I

DRYWELL AIR TEMPERATURE 1,2,3 90-110 135 B5070 (SPDS OR CRIDS) OR N/A N/A (NOTE 1)

I ATT7ACHMENT 3q LINE F

a. HAVE CRS/OS VERIFY AT LEAST ONE OPERABLE INPUT FOR EACH ZONE.

CIRCLE ONE:

Zone e

d c

b a

A2264 A2266 A2276 A2282 A2280 UNSAT A2265 A2267 A2277 A2283 A2281 Inputs A2268 A2272 A2278 A2284 A2286 A2269 A2273 A2279 A2285 A2287 INITIALS A2270 A2274 A2271 A2275 CRS/OS INITIALS

2.

CHANNEL CHECK:

1,2,3 5.00E-03 DRYWELL GASEOUS ISK-RI4991 (10C604)

NO INST TRIPPED

3.

CHANNEL CHECK:

1,2,3,*

1E-3 ISP-RI4857A (10C604)

(NOTE 2)

REACTOR BLDG EXHAUST 1---

IE-3 ISP-RI4857B (10C604)

RADIATION MONITOR 1E 3 ISP-RI4857C (10C604)

NO INST TRIPPED

--.NOTE INST DEVIATION 28 (SAT/UNSAT)

Hope Creek Rev. 80

OPERATOR TRAINING PROGRAM JOB PERFORMANCE MEASURE STATION:

SYSTEM:

TASK:

TASK NUMBER:

JPM NUMBER:

HOPE CREEK Administrative Respond To An Abnormal Release Of Gaseous Radioactivity Calculate Iodine Release Rates 4000270401 SROA.3 ALTERNATE PATH:

APPLICABILITY:

EO =

RO =

K/A NUMBER:

IMPORTANCE FACTOR:

STA

=

SRO F--

2.3.11 3.2 SRO RO EVALUATION SETTING/METHOD:

Simulator/Perform

REFERENCES:

HC.OP-AB.ZZ-0126(Q), Rev.: 8 TOOLS AND EQUIPMENT:

Calculator VALIDATED JPM COMPLETION TIME:

(5) Minutes TIME PERIOD IDENTIFIED FOR TIME CRITICAL STEPS:

CAUTION:

No plant equipment shall be operated during the performance of a JPM without the following:

1. Permission from the OS or Unit CRS;
2. Direct oversight by a qualified individual (determined by the individual granting permission based on plant conditions).
3. Verification of the "as left" condition by a qualified individual.

Page 1 of 7 N/A ACTUAL JPM COMPLETION TIME:

Minutes ACTUAL TIME CRITICAL COMPLETION:

N/A JPM PERFORMED BY:

GRADE: DSAT DUNSAT REASON, IF UNSATISFACTORY:

EVALUATOR'S SIGNATURE:

DATE:

OPERATOR TRAINING PROGRAM JOB PERFORMANCE MEASURE NAME:

DATE:

Administrative Respond To An Abnormal Release Of Gaseous Radioactivity Calculate Iodine Release Rates TASK NUMBER:

4000270401 INITIAL CONDITIONS:

1. North Plant Vent (NPV) Stack radiation monitoring activity is rising on RM-1 1 point 9RX590.
2. SPDS is unavailable.
3. Abnormals AB-126 and AB-127 are being executed to determine and stop the release of activity.
4. NPV Exh Flow instrumentation is inoperable. Flow is being estimated in accordance with HC.OP-DL.ZZ-0026(Q), Attachment 3u (Provided).

INITIATING CUE:

Using the RM-1 1, determine the Iodine Release rate from the NPV.

Page 2 of 7 SYSTEM:

TASK:

Successful Completion Criteria:

1. All critical steps completed.
2. All sequential steps completed in order.
3. All time-critical steps completed within allotted time.
4. JPM completed within validated time. Completion time may exceed the validated time if satisfactory progress is being made.

OPERATOR TRAINING PROGRAM JOB PERFORMANCE MEASURE NAME:

DATE:

SYSTEM:

TASK:

STEP STEP COMMENTS NO.(*Denotes a Critical Step)

STANDARD EVAL (Required for UNSAT

(#Denotes a Sequential Step)

SIU evaluation)

Operator obtains/locates procedures Operator obtains the correct HC.OP-AB.ZZ-0126 and HC.OP-procedures.

AB.ZZ-0127.

Operator determines beginning step Operator determines correct beginning of the procedure.

step to be 4.8.

START TIME:

4.8 USE the SPDS Noble Gas Total OR Operator determines that the correct PERFORM the following calculations step to calculate the Iodine release to determine the total release rates for from the NPV is 4.8.2 Noble Gas or Iodine.

4.8.1 CALCULATE the total Noble Gas release rate from Hope Creek Generating Station by adding all gaseous effluent channels SPV (9RX580), NPV (9RX590),

FRVS (9RX680), HTV(9RX518):

N/A N/A

=+

+

+

pCi/sec pCi/sec pCi/sec pCi/sec pCi/sec Total SPV NPV FRVS HTV Page 3 of 7

OPERATOR TRAINING PROGRAM JOB PERFORMANCE MEASURE NAME:

DATE:

SYSTEM:

TASK:

STEP STEP COMMENTS

(*Denotes a Critical Step)

EVAL (Required for UNSAT

(#Denotes a Sequential Step)

S/U evaluation) 4.8.2 IF the effluent (pCi/sec) channel on Operator manipulates the RM-1 1 the RM-1 1 is NOT operating for a terminal to obtain the value of Iodine specific plant vent, THEN release from the 9RX601 detector and CALCULATE the Noble Gas release enters the value into the formula; then rate for that vent using the following:

the operator transfers the Plant Vent Exh Flow value from Attachment 3u of HC.OP-DL.ZZ-0026 (provided); then calulates the Iodine release rate.

Calculated Value =

32.02 uCi/sec = 1.38E-7pCi/cc*49155.4*472 S*

472 pCi/sec pCi/cc (n.g.)

Plant Vent Exh (n.g.)

Flow in cfm where:

pCi/sec (n.g.) -

the calculated release rate from the specified plant vent (Noble Gas) pCi/cc (n.g.) -

The concentration of Noble Gas obtained from the RM-1 1 (the operable channel will be highlighted in GREEN) OR from an actual sample of the plant vent 472 The conversion factor in units of cc/sec/cfm STOP TIME:

Terminating Cue: Repeat back message from the operator on the status of the JPM, and then state "This JPM is complete" Page 4 of 7

JOB PERFORMANCE MEASURE INITIAL CONDITIONS:

1. North Plant Vent (NPV) Stack radiation monitoring activity is rising on RM-11 point 9RX590.
2. SPDS is unavailable.
3. Abnormals AB-126 and AB-127 are being executed to determine and stop the release of activity.
4. NPV Exh Flow instrumentation is inoperable. Flow is being estimated in accordance with HC.OP-DL.ZZ-0026(Q), Attachment 3u (Provided).

INITIATING CUE:

Using the RM-11, determine the Iodine Release rate from the NPV.

Page 5 of 7

JOB PERFORMANCE MEASURE SIMULATOR INSTRUCTIONS Reset to IC-1 Insert Malfunctions:

RM9590 @ 1600 RM9601 @ 1.38 E-7 Page 6 of 7

PSEG Internal Use Only TRAINING ONLY HC.OP-DL.ZZ-0026(Q)

Page 1 of 1 ATTACHMENT 3u Radioactive Gaseous Effluent Monitoring (North Plant Vent)

T/S 6.8.4.g ODCM TABLE 3.3.7.11-1 ACTION 122 HCGS DATE:

Today's Date Location Aux/Turb/Radwaste ENTER TIME OF EACH READING BELOW PARAMETER NORM NOW COMMENTS SOLID RADWASTE EXH FAN A318 17,000 16863 SOLID RADWASTE EXH FAN B318 17,000 17245 CHEM LAB EXH A307 7,500 7496 CHEM LAB EXH B307 7,500 7519 OFFGAS DISCHARGE HA-XR-10022 OR 32.4 HA FI5665 TOTAL FLOW 49155.4 ESTIMATED TOTAL FLOW REPORTED TO RAD PRO - (YES)

Yes Page 81 of 99 If the North Plant Vent Flow Rate Monitor is Inoperable, then Effluent Releases via this pathway may continue for up to 30 days provided flow rate is estimated at least once per 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />.

Readings are taken every 3 hours3.472222e-5 days <br />8.333333e-4 hours <br />4.960317e-6 weeks <br />1.1415e-6 months <br /> to ensure that the 4 hour4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> Tech Spec Action limit is not exceeded per administrative requirements and after a change in the ventilation line-up.

If flow indication(s) become unavailable, then the "NORM" flow value may be logged for the specific fan alignment.

Hope Creek Rev. 80

OPERATOR TRAINING PROGRAM JOB PERFORMANCE MEASURE HOPE CREEK Emergency Plan Implementation r'.locifxi nn Imarn nanr,\\ I:w\\anf *n nri imn~ra thin Inifinl r.ntnfrtf Maq_*nna STATION:

SYSTEM:

TASK:

Form TASK NUMBER:

2000500302 JPM NUMBER:

[SRO A.4]

ALTERNATE PATH: L K/A NUMBER:

2.4.:

IMPORTANCE FACTOR:

APPLICABILITY:

RO EO =

RO

SRO L-f EVALUATION SETTING/METHOD:

Control Room Simulate/Simulator Simulate

REFERENCES:

HECG-HECG-TOC, Rev.: 30 TOOLS AND EQUIPMENT:

None VALIDATED JPM COMPLETION TIME:

20 Minutes TIME PERIOD IDENTIFIED FOR TIME CRITICAL STEPS:

15/13 Minutes 38 4.0 SRO Page 1 of 11 CAUTION:

No plant equipment shall be operated during the performance of a JPM without the following:

1. Permission from the OS or Unit CRS;
2. Direct oversight by a qualified individual (determined by the individual granting permission based on plant conditions).
3. Verification of the "as left" condition by a qualified individual.

ACTUAL JPM COMPLETION TIME:

Minutes ACTUAL TIME CRITICAL COMPLETION:

Minutes JPM PERFORMED BY:

GRADE: D SAT D

UNSAT REASON, IF UNSATISFACTORY:

EVALUATOR'S SIGNATURE:

DATE:

OPERATOR TRAINING PROGRAM JOB PERFORMANCE MEASURE NAME:

DATE:

SYSTEM:

Emergency Plan Implementation TASK:

Classify an Emergency Event and prepare the Initial Contact Message Form TASK NUMBER:

2000500302 INITIAL CONDITIONS:

1. With the plant operating at 100% power, Hope Creek experiences an earthquake which indicates a magnitude of > 0.1g.
2. Control Room Annunciator C6-C4 is in.
3. ON Panel 10C673:
a. The SMA-3 Event Indictor is White
b. The Strong Motion Accelerograph Tape Machines have advanced but are not currently running
c. The AMBER alarm light on the Seismic Switch Power Supply Drawer is lit
4. Numerous amber lights and 3 red lights are lit on the response spectrum analyzer.
5. A LOCA results. The Reactor is successfully scrammed, with RPV level dropping rapidly to -250"; then stabilizing between -225" and -205", being maintained using all available ECCS.
6. Drywell Pressure peaked at 44 psig, then dropped to < 2 psig over the next 90 seconds, and continues to slowly drop.
7. The current 33 ft. elevation wind direction is from 2750 at 7 mph.
8. A Radiological Release is NOT in progress.

INITIATING CUE:

Based on this information, classify this event and make the initial notifications. This is a time critical task, and has two time critical elements.

Page 2 of 11 Successful Completion Criteria:

1. All critical steps completed.
2. All sequential steps completed in order.
3. All time-critical steps completed within allotted time.
4. JPM completed within validated time. Completion time may exceed the validated time if satisfactory progress is being made.

OPERATOR TRAINING PROGRAM JOB PERFORMANCE MEASURE Emergency Plan Implementation Classify an Emergency Event and prepare the Initial Contact Message Form Page 3 of 11 SYSTEM:

TASK:

NAME:

DATE:

STEP STEP COMMENTS NO.

(*Denotes a Critical Step)

STANDARD EVAL (Required for UNSAT

(#Denotes a Sequential Step)

S/U evaluation)

Start time should be logged after the Start Time:

operator has reviewed the initial conditions and repeated the task back.

Operator obtains the correct procedure ECG Assess the event and/or plant Operator assesses the initial conditions, Section conditions and DETERMINE which and determines that Table 3, Fission i.IV.C.1 ECG section(s) is most appropriate.

Product Barriers, and 9.0, Hazards Internal/External, are the appropriate ECG sections.

ECG REFER to Section EAL/RAL Operator refers to Table 3.0 and Section Flowchart diagram(s), and identify Flowchart Diagrams and identifies that i.IV.C.2 the Initiating Conditions that are the Initial Conditions for Table 3.0 and related to the event/condition that EAL 9.5.2 are related to the event that has occurred or is ongoing.

has occurred.

OPERATOR TRAINING PROGRAM JOB PERFORMANCE MEASURE Emergency Plan Implementation Classify an Emergency Event and prepare the Initial Contact Message Form Page 4 of 11 SYSTEM:

TASK:

NAME:

DATE:

STEP STEP COMMENTS NO.

(*Denotes a Critical Step)

STANDARD EVAL (Required for UNSAT

(#Denotes a Sequential Step)

S/U evaluation)

ECG REVIEW the associated EALs or Operator reviews the EALs in section Section RALs as compared to the event and 9.5, and determines that EAL #9.5.2 is i.IV.C.3 SELECT the highest appropriate the highest emergency action level met emergency or reportable action level, or exceeded (ALERT).

If identification of an EAL is questionable, refer to paragraph IV.A above.

If there is any doubt with regard to assessment of a particular EAL or RAL, the ECG Technical Basis Document should be reviewed.

Words in an EAL or RAL that are bold face are either threshold values associated with that action level or are words that are defined for that specific EAL/RAL.

Table In the table review the Emergency Operator reviews the EALs of all 3.0 Action Levels of all columns and columns, and determines that all

1.

identify which need further review, columns need further review.

SYSTEM:

TASK:

OPERATOR TRAINING PROGRAM JOB PERFORMANCE MEASURE Emergency Plan Implementation Classify an Emergency Event and prepare the Initial Contact Message Form NAME:

DATE:

STEP STEP COMMENTS

(*Denotes a Critical Step)

EVAL (Required for UNSAT

(#Denotes a Sequential Step)

S/U evaluation)

Table For each of the three barriers, Operator determines that the following 3.0 determine the EAL with the highest EALs have been exceeded and

2.

point value, and circle the EAL # and represent the highest value met or point value. No more than one EAL exceeded for the respective column:

should be selected for each barrier.

3.1.1.b; 3.2.2.b or 3.2.1.b; 3.3.2.b or 3.3.2.d.

Operator circles the EAL numbers and point values for the EALs listed above.

Examiners Note: Circling is not critical.

Table Add the point values circled for the Operator adds the values (should be 3.0 three barriers and enter the total circled), and enters the value 10 in the

3.

below:

appropriate space.

Examiners Note: Obtaining this value for future use is critical; marking it on Table 3.0 is not.

Table Classify based on the point value Operator determines that this 3.0 sum as follows:

classification is higher that the

4.

It C

Mclassification on EAL 9.5.2 and sumi:

CIasifyas:

Referi:

classifies the event as a General 12 UNUSUAL EVENT ATT. 1 Emergency based on Table 3.0 3,4 ALERT ATT. 2 5,6,7,8 SITE AREA AIT. 3 9,10 GENERAL ATT. 4 Page 5 of 11

SYSTEM:

TASK:

OPERATOR TRAINING PROGRAM JOB PERFORMANCE MEASURE Emergency Plan Implementation Classify an Emergency Event and prepare the Initial Contact Message Form NAME:

DATE:

STEP COMMENTS STEP

(*Denotes a Critical Step)

EVAL (Required for UNSAT TaNO.

(#Denotes a Sequential Step)

STANDARD S/U evaluation)

Table Implement the appropriate EGG Operator implements Attachment 4.

3.0 Attachment per the above chart.

5.

ECG I. EMERGENCY Operator declares a General Att. 4 COORDINATOR(EC) LOG Emergency, places the EAL # s 3.1.1.b, L.A SHEET 3.2.2.b or 3.2.1.b, 3.3.2.b or 3.3.2.d, A. DECLARE A GENERAL time and date in the appropriate spots EMERGENCY AT HOPE in attachment 4, and initials the step as CREEK the EC.

EAL #(s)

Examiners Note: Copy the declaration time that the operator entered on Att. 4; Declared at hrs on the difference between the START time time date and the Declared time is the first critical time (15 min.) Initialing the step is not critical.

ECG B. NOTIFICATIONS Operator calls the communicator using Att. 4thplnpae I.B.1

1. CALL the Communicators to the plant page.

the Control Room Examiners Role-play: After 2 minutes, report as the communicators and give your name as CM1 and CM2.

Page 6 of 11

OPERATOR TRAINING PROGRAM JOB PERFORMANCE MEASURE Emergency Plan Implementation Classify an Emergency Event and prepare the Initial Contact Message Form Page 7 of 11 SYSTEM:

TASK:

NAME:

DATE:

STEP COMMENTS STEP

(*Denotes a Critical Step)

EVAL (Required for UNSAT

  • __NO._

(#Denotes a Sequential Step)

STANDARD S/U evaluation)

EGG

2. MAKE A PAR by the following Operator Refers to pg. 3 and 4, Aft. 4 steps; determines that a GE Based 10 Points I.B.2
a. REFER to Predetermined PAR is appropriate [EVACUATE ALL PAR Flowchart on Pg. 3 SECTORS 0-5 MILES, EVACUATE and DETERMINE the DOWNWIND +1 SECTOR 5-10 appropriate PAR.

MILES(ENE-E-ESE), SHELTER ALL REMAINING SECTORS, 5-10 MILES].

b. IF a Radiologically Based Examiners Cue: If asked, a PAR is IMMEDIATELY Radiologically Based PAR is not available, THEN COMPARE available.

the two PARs and choose the most appropriate for inclusion on the ICMF.

OPERATOR TRAINING PROGRAM JOB PERFORMANCE MEASURE Emergency Plan Implementation Classify an Emergency Event and prepare the Initial Contact Message Form Page 8 of 11 SYSTEM:

TASK:

NAME:

DATE:

STEP STEP COMMENTS NO.

(*Denotes a Critical Step)

STANDARD EVAL (Required for UNSAT

(#Denotes a Sequential Step)

S/U evaluation)

ECG

3. COMPLETE the INITIAL Operator Completes the ICMF.

Aft. 4 CONTACT MESSAGE FORM Examiners Note: If asked if there isa I.B.3 (ICMF) (last page of this EaiesNt:I se fteei atCt(ashmnt) pradiological release in progress, reply, attachment).

"No release is in progress".

Examiners Note: See the attached ICMF for an example of what the form should look like when filled out properly. Note that the exact words do not have to be in the "DESCRIPTION OF EVENT", but the description must convey the sense of the Initiating Condition for EALs 3.1.1.b, 3.2.2.bl3.2.1.b, 3.3.2.b13.3.2.d.

The operator may place the Examiner's name as the Communicator or tell the Examiner to place his/her name as the Communicator.

SYSTEM:

TASK:

OPERATOR TRAINING PROGRAM JOB PERFORMANCE MEASURE Emergency Plan Implementation Classify an Emergency Event and prepare the Initial Contact Message Form NAME:

DATE:

STEP STEP COMMENTS NO.

(*Denotes a Critical Step)

STANDARD EVAL (Required for UNSAT

(#Denotes a Sequential Step)

S/U evaluation)

ECG PROVIDE the ICMF to the Operator provides the ICMF to CM1 Aft. 4 Communicator (CM1) and DIRECT and directs implementation of Att.7.

I.B.4 the CM1 to implement ECG Examiners Note: Role-play as CMI.

and repeat back the direction as given.

Examiners Note: The difference LOG TIME:

between the declaration and this LOG TIME is the second critical time (13 min.)

ECG DIRECT the Secondary Operator directs CM2 to implement At. 4 Communicator (CM2) to implement Att.8 for a General Emergency.

I.B.5 ECG Attachment 8 for a GENERAL Examiners Note: Role-play as CM2 EMERGENCY.

and repeat back the direction as STOP TIME:

given, provide Terminating Cue.

Terminating Cue: Repeat back message from the operator on the status of the JPM, and then state "This JPM is complete" Page 9 of 11

JOB PERFORMANCE MEASURE INITIAL CONDITIONS:

1. With the plant operating at 100% power, Hope Creek experiences an earthquake which indicates a magnitude of > 0.1g.
2. Control Room Annunciator C6-C4 is in.
3. ON Panel 10C673:
a. The SMA-3 Event Indictor is White
b. The Strong Motion Accelerograph Tape Machines have advanced but are not currently running
c. The AMBER alarm light on the Seismic Switch Power Supply Drawer is lit
4. Numerous amber lights and 3 red lights are lit on the response spectrum analyzer.
5. A LOCA results. The Reactor is successfully scrammed, with RPV level dropping rapidly to -250"; then stabilizing between -225" and -205", being maintained using all available ECCS.
6. Drywell Pressure peaked at 44 psig, then dropped to < 2 psig over the next 90 seconds, and continues to slowly drop.
7. The current 33 ft. elevation wind direction is from 2750 at 7 mph.
8. A Radiological Release is NOT in progress.

INITIATING CUE:

Based on this information, classify this event and make the initial notifications. This is a time critical task, and has two time critical elements.

Page 10 of 11

TRAINING ONLY Examiner's Copy ECG ATT 4 Pg. 5 of 5 INITIAL CONTACT MESSAGE FORM I.

THIS IS Inserts CMI's name

, COMMUNICATOR IN THE 10 CONTROL ROOM (NAME)

AT THE HOPE CREEK NUCLEAR GENERATING STATION.

Ila.

0 THIS IS NOTIFICATION OF A GENERAL EMERGENCY WHICH WAS DECLARED AT EAL #(s)

Today's Time (TIME - 24 HOUR CLOCK) 3.1.1.b ON Today's Date (DATE) 3.2.2.b or 3.2.1.b 3.3.2.b or 3.3.2.d DESCRIPTION OF EVENT:

LOSS OF FUEL CLAD, REACTOR COOLANT BOUNDARY, AND CONTAINMENT BARRIERS El THIS IS NOTIFICATION OF A PROTECTIVE ACTION RECOMMENDATION UPGRADE WHICH WAS MADE AT HRS ON (24 HOUR CLOCK)

(DATE)

Reason for PAR Upgrade:

III.

[]

NO RADIOLOGICAL RELEASE IS IN PROGRESS.

1osee NOTE for release El THERE IS A RADIOLOGICAL RELEASE IN PROGRESS.

definition IV.

33 FT. LEVEL WIND DIRECTION (From):

275 WIND SPEED 7

(From MET Computer)

(DEGREES)

(MPH)

V.

WE RECOMMEND EVACUATION AS FOLLOWS Sectors All ENE-E-ESE M]

WE RECOMMEND SHELTERING AS FOLLOWS All Remaining Dist.- Miles 0-5

  • _4 t' 5-10 Performer's Initials EC Initials (Approval to Transmit ICMF)

NOTE:

Radiological Release is defined as: Plant Effluent > Tech Spec Limit of 1.20E+04 [tCi/sec Noble Gas or 1.70E+01 jLCi/sec 1-131.

El TSC QEOF lib.

HCGS Rev. 03

ADMINISTRATIVE TOPICS Facility:

HOPE CREEK Date of Examination:

3/11/02 Examination Level:

[

RO

[-] SRO Operating Test Number:

TOPIC:

A.1-1 QUESTION:

1 Subject

Description:

Plant Parameter Verification K/A:

2.1.25 Ability to obtain and interpret station reference materials such as graphs/monographs/and tables which contain data. (2.8)

DESCRIPTION:

Question-Given plant conditions, determine the required Circulation Water System requirements for extreme cold weather.

QUESTION:

Given the following:

"* Three (3) Circulating Water Pumps are in operation

"* HV-2174, A&B CLG TWR DE-ICING VALVES are open

"* Average Basin water temperature Computer Point A2769 is 55F

"* Outside ambient air temperature is 25F

"* Cooling Tower Blowdown return temperature (daily average) is 75F

"* Thermal release rate to the river is 576 MBtu's/hr

"* A small amount of ice has formed on the Fill support Columns and Beams of the Cooling Tower

"* There is a very small ice formation on the Fill Sheets between the supports

"* Minimal ice has formed on the Support Columns Determine if any actions are required for continued operation of the Circulating Water System.

ANSWER:

Reference HC.OP-SO.DA-0001 Per 5.3.4.A.1, Four Circulating Water Pumps should be in operation.

The current operating region is in CENTRAL SHUT-OFF VALVES CLOSED (Att. 1)

Operation of HV-2174 A&B is not required because ice formation is within the recommendations of Note 5.3.7, but continuous monitoring is required.

ROQuestionAl-l-l.doc EXAMINER COPY Page 1 of 1

ADMINISTRATIVE TOPICS Given the following:

"* Three (3) Circulating Water Pumps are in operation

"* HV-2174, A&B CLG TWR DE-ICING VALVES are open

"* Average Basin water temperature Computer Point A2769 is 55F

"* Outside ambient air temperature is 25F

"* Cooling Tower Blowdown return temperature (daily average) is 75F

"* Thermal release rate to the river is 576 MBtu's/hr

"* A small amount of ice has formed on the Fill support Columns and Beams of the Cooling Tower

"* There is a very small ice formation on the Fill Sheets between the supports

"* Minimal ice has formed on the Support Columns Determine if any actions are required for continued operation of the Circulating Water System.

CANDIDATE COPY Page 1 of 1

ADMINISTRATIVE TOPICS Facility:

HOPE CREEK Date of Examination:

2/4/02 Examination Level:

E RO E] SRO Operating Test Number:

TOPIC:

A.1-1 QUESTION:

2 Subject

Description:

Plant Parameter Verification K/A:

2.1.25 Ability to obtain and interpret station reference materials such as graphs/mongraphs/and tables which contain data. (2.8)

DESCRIPTION:

Question-Obtain maximum RWCU return to Feedwater Temperature.

QUESTION:

Given the following:

"* RWCU is being placed in service

"* Both RWCU pumps are running

"* HV-F044, FLTR DEMIN BYPASS is throttled such that Computer Point A2856 RWCU OUTLET FLOW indicates 315 gpm

"* RWCU F/D flow inlet temperature is 120F The first Filter/Demin Bed is in service What is the maximum RWCU RETURN TO FEEDWATER FLOW TEMP (A215) that would ensure that the total RWCU F/D flow through the F/D beds is < 300 gpm when placing the second RWCU Filter/Demin in-service?

ANSWER:

252F +2F Using Attachment 1 of HC.OP-SO.BG-0001.

ROQuestionAl-1-2.doc EXAMINER COPY Page 1 of 1

ADMINISTRATIVE TOPICS Given the following:

"* RWCU is being placed in service

"* Both RWCU pumps are running

"* HV-F044, FLTR DEMIN BYPASS is throttled such that Computer Point A2856 RWCU OUTLET FLOW indicates 315 gpm

"* RWCU FID flow inlet temperature is 120F

"* The first Filter/Demin Bed is in service What is the maximum RWCU RETURN TO FEEDWATER FLOW TEMP (A215) that would ensure that the total RWCU FID flow through the FJD beds is < 300 gpm when placing the second RWCU FilterlDemin in-service?

CANDIDATE COPY Page 1 of 1

OPERATOR TRAINING PROGRAM JOB PERFORMANCE MEASURE STATION:

HOPE CREEK SYSTEM:

Administrative TASK:

Perform A Shift Turnover As On-Coming/O TASK NUMBER:

2990630301 JPM NUMBER:

RO A1-2 ALTERNATE PATH: [i K/A NUMBER:

IMPORTANCE FACTOR:

APPLICABILITY:

EO

=

RO --

STA X

SRO EVALUATION SETTING/METHOD:

Simulator/Perform

REFERENCES:

SH.OP-AP.ZZ-0107(Q), Rev.: 2 TOOLS AND EQUIPMENT:

None VALIDATED JPM COMPLETION TIME:

(16) Minutes TIME PERIOD IDENTIFIED FOR TIME CRITICAL STEPS:

if-Going NCO 2.1.3 3.0 RO SRO N/A Page 1 of 11 CAUTION:

No plant equipment shall be operated during the performance of a JPM without the following:

1. Permission from the OS or Unit CRS;
2. Direct oversight by a qualified individual (determined by the individual granting permission based on plant conditions).
3. Verification of the "as left" condition by a qualified individual.

ACTUAL JPM COMPLETION TIME:

Minutes ACTUAL TIME CRITICAL COMPLETION:

N/A JPM PERFORMED BY:

GRADE: D SAT D

UNSAT REASON, IF UNSATISFACTORY:

EVALUATOR'S SIGNATURE:

DATE:

OPERATOR TRAINING PROGRAM JOB PERFORMANCE MEASURE NAME:

DATE:

SYSTEM:

TASK:

Administrative Perform A Shift Turnover As On-Coming/Off-Going NCO TASK NUMBER:

2990630301 INITIAL CONDITIONS:

1. You are the Off-going Day Shift Reactor Operator.
2. Preparations for shift relief are in progress.
3. Salem 1 and 2 are on line.
4. 1 OF1 04 Air Dryer is in service, 0OF1 04 is in standby.
5. All Auxilliary Boilers are available.

INITIATING CUE:

Complete the Equipment Status Checklist (Attachment 6), except for the Control Room Key Audit, in accordance with SH.OP-AP.ZZ-0107.

Page 2 of 11 Successful Completion Criteria:

1. All critical steps completed.
2. All sequential steps completed in order.
3. All time-critical steps completed within allotted time.
4. JPM completed within validated time. Completion time may exceed the validated time if satisfactory progress is being made.

OPERATOR TRAINING PROGRAM JOB PERFORMANCE MEASURE Administrative Perform A Shift Turnover As On-Coming/Off-Going NCO Page 3 of 11 SYSTEM:

TASK:

NAME:

DATE:

STEP STEP COMMENTS NO.

(*Denotes a Critical Step)

STANDARD EVAL (Required for UNSAT

(#Denotes a Sequential Step)

SIU evaluation)

Operator obtains/locates procedure Operator obtains the correct procedure.

SH.OP-AP.ZZ-0107.

Operator determines beginning step Operator determines correct beginning of the procedure.

step to be 5.2.3.

START TIME:

Operator obtains a copy of Attachment 6, and commences to complete while walking-down the control room boards.

5.2.2 Each off-going operator should prepare a listing highlighting planned Examiner Note: See attached for the evolutions, comments, equipment completed attachment. Comments in abnormalities, and other items the REMARKS section are not critical.

affecmalitin pant opheraitio s

tCritical aspect of this step is that the in affecting plant operations to aid in these vc eq i m n a dth O

turnover. The appropriate attachment ervice eq ntad the 00 p

should be used to document this equipment be noted properly. Except information.

that:

The RWM may not be circled as operable, since power is above the LPAP.

OPERATOR TRAINING PROGRAM JOB PERFORMANCE MEASURE Administrative Perform A Shift Turnover As On-Coming/Off-Going NCO STEP STEP COMMENTS NO.

(*Denotes a Critical Step)

STANDARD EVAL (Required for UNSAT

(#Denotes a Sequential Step)

S/U evaluation)

Operator observes that the RCIC HV F012 is closed and is required to be open.

Examiner Cue: If asked, provide cue to open HV-F012. (Operator may wait until completion of attachment before informing CRS.)

Operator opens HV-F012.

Operator reports the status of the STOP TIME:

checklist.

Terminating Cue: Repeat back message from the operator on the status of the JPM, and then state "This JPM is complete" Page 4 of 11 SYSTEM:

TASK:

NAME:

DATE:

JOB PERFORMANCE MEASURE INITIAL CONDITIONS:

1. You are the Off-going Day Shift Reactor Operator.
2. Preparations for shift relief are in progress.
3. Salem I and 2 are on line.
4. 10F104 Air Dryer is in service, 00F104 is in standby.
5. All Auxilliary Boilers are available.

INITIATING CUE:

Complete the Equipment Status Checklist (Attachment 6), except for the Control Room Key Audit, in accordance with SH.OP-AP.ZZ-0107.

Page 5 of 11

JOB PERFORMANCE MEASURE SIMULATOR INSTRUCTIONS Reset to IC-05 Bypass "C" APRM, insert Malfunction NM21 C @100.

Insert:

Malfunction CW05B 10 Override 5A21F, OVLO BP502 SW PUMP STOP to OFF DEPRESS:

OVLD/PWR FAILURE push button on the B SSW pump Bezel STA SVC WTR PMPS & SCREEN SPRAY, CHANNEL B, MAN BYP push button on 10C651D Acknowledge overhead alarms Place RED Bezel cover over the B SSW Pump Controls.

Close the RCIC HV-F012, Pump Disch IsIn.

Page 6 of 11

ATTACHMENT 6 EQUIPMENT STATUS CHECKLIST (Page 1 of 5)

Current Shift X

Days Nights Da SH.OP-AP.ZZ-0107(Q)

[CD-421Y]

ite Today's Date To be completed by the off-going RO/PO for turnover to the oncoming RO/PO.

Circle designator for equipment in service, X over designator for INOP/Bypassed equipment.

Cooling Water SSWS:

SACS:

TACS Loop:

RACS:

Condenser/Condensate CW:

SJAE:

Offgas Train:

PCP:

SCP:

HWCI:

Reactor Feedwater A RFP:

B RFP:

C RFP:

Startup Valves Reactor RWCU Pump:

RWCU Filter-Demin:

Reactor Recirc Pumps:

Recirc Control:

CRD Pumps:

CRD Stabilizer:

CRD Flow Control:

Nuclear Instrumentation APRM:

IRM:

SRM:

FLOW UNITS:

RBM:

RWM:

A

© C8 B

Remarks B Pump taqqed for maintenance B

(D

© rUnit1 RUN D

Common C

AT ANUAL AUTO4ýý AUTO/MANUAL AUTO/MANUALCOE 0

A A

B A

AUTOOQý B

B Operable B

AUT*oýý C APRM INOP B

B I

D B

B §D B

I operable Salem/Hope Creek Page 22 of 56 Rev. 2

SH.OP-AP.ZZ-0107(Q)

ATTACHMENT 6 EQUIPMENT STATUS CHECKLIST (Page 2 of 5)

Turbine:

T/G Oil Pump OPi 11 Motor Suction Pump OP108 Emergency Bearing Oil Pump OP112 EHC Pumps:

(Z Lift Pumps:

A B

Seals:

Main Generator:

Voltage Regulator:

Auto Track:

Stabilizer:

Stator Cooling:

SALEM Units On-line:

Diesel Generator:

B C

D E F AUX ON ONAT 1

©)

MANUAL OFF OFF B

3 A

B C

D Chilled Water:

Turbine Bldg (K111):

TB CW Pumps:

TSC Chiller (K403):

Control Area Chiller (K400):

Ventilation:

CREF:

FRVS Recirc:

FRVS Vent:

Fans In Lockout:

H2/02 Analyzers:

Fuel Pool Cooling Pumps:

BOP System Bypass:

Feedwater Heaters:

Air Systems:

Instrument Air Dryers:

Service Air:

Emergency Instrument Air:

PCIG:

Aux Boiler:

A A

a A

A A

B

© B© B

B B

C B

B A

D D

F B

B No 1OK100 (Consistent With Plant Condition) SSW CIT 00F104 1AF104 00K107 AUTOýj YAULD 0

B C

Salem/Hope Creek Remarks G

H J

None Page 23 of 56 Rev. 2

SH.OP-AP.ZZ-0107(Q)

ATTACHMENT 6 EQUIPMENT STATUS CHECKLIST (Page 3 of 5)

Core Spray Component I/D Req A

B C

D Remarks Supp Pool Suct HV-FOO1 0

0 0

0 0

Pump Min Flow HV-F031 0

0 0

N/A N/A Full Flow Test HV-F015 X

X X

N/A N/A Outbrd Inj.

HV-F004 0

0 0

N/A N/A Inbrd Inj.

HV-F005 X

X X

N/A N/A Inbrd Inj.

HV-F006 X

X X

N/A N/A Inbrd Isol.

HV-F007 0

0 0

N/A N/A Pump P206 STBY STBY STBY STBY STBY HPCI Component I/D Req Act Inbrd Stm Isln HV-F002 0

0 Stm Warmup HV-F100 X

X Outbrd Stm IsIn HV-F003 0

0 Stm admission HV-FOO1 X

X Turb Exhaust HV-F071 0

0 CST Suct HV-F004 0

0 Supp Pool Suct HV-F042 X

X Pump Min Flow HV-F012 X

X Cooling Wtr Isln HV-F059 X

X Pump Disch Isln HV-F007 0

0 Disch to F.W.

HV-8278 X

X Disch to C.S.

HV-F006 X

X Full Flow Test HV-F008 X

X Common Test to CST HV-FO1 1 X

X Flow Controller FIC-R600 AUTO AUTO 5600 5600 Aux Oil Pump AUTO AUTO Salem/Hope Creek Remarks Page 24 of 56 Rev. 2

ATTACHMENT 6 EQUIPMENT STATUS CHECKLIST (Page 4 of 5)

I/D Rea Act Inbrd Stm IsIn HV-F007 0

0 Stm Warmup HV-F076 X

X Outbrd Stm IsIn HV-F008 0

0 Stm admission HV-F045 X

X Turb Exhaust HV-F059 0

0 CST Suct HV-F010 0

0 Supp Pool Suct HV-F031 X

X Pump Min Flow SV-F019/SV-X X

4405 Cooling Wtr IsIn HV-F046 X

X Pump Disch IsIn HV-F012 0

0 Disch to F.W.

HV-F013 X

X Full Flow Test HV-F022 X

X Flow Controller FIC-R600 AUTO 600 AUTO 600 Trip and throttle (valve)

HV-F4282 0

0 Trip and Thrtl (actuator)

HV-F4282 ACTUATOR ACTUATOR OPEN OPEN Salem/Hope Creek RCIC Component SH.OP-AP.ZZ-0107(Q)

Remarks Found closed, opened SFa*i Page 25 of 56 Rev. 2

SH.OP-AP.ZZ-01 07(Q)

ATTACHMENT 6 EQUIPMENT STATUS CHECKLIST (Page 5 of 5)

RHR I/D Req A

C B

D Remarks Disc & Operator Supp Pool Suct HV-F004 0

0 0

0 0

S/D CIng Suction HV-F006 X

X N/A X

N/A Pump Min Flow HV-F007 0

0 0

0 0

RHR Hx Inlet HV-F047 0

0 N/A 0

N/A RHR Hx Bypass HV-F048 0

0 N/A 0

N/A RHR Hx Outlet HV-F003 0

0 N/A 0

N/A Full Flow Test HV-F024 X

X N/A X

N/A Full Flow Test HV-FO10 X

N/A X

N/A X

Outbrd Injection HV-F017 X

X X

X X

Inbrd Injection HV-F041 X

X X

X X

Inbrd Isolation HV-F065 0

0 0

0 0

Outbrd DW Spray HV-F016 X

X N/A X

N/A Inbrd DW Spray HV-F021 X

X N/A X

N/A Pool Spray HV-F027 X

X N/A X

N/A Inbrd Head Spray HV-F022 X

N/A N/A X

N/A Outbrd Head Spray HV-F023 X

N/A N/A X

N/A S/D CIg Suct HV-F008 X

X N/A N/A N/A S/D CIg Suct HV-F009 X

N/A N/A X

N/A S/D CIg Return HV-F015 X

X N/A X

N/A S/D CIg Return HV-F050 X

X N/A X

N/A Inbrd Isln HV-F060 0

0 N/A 0

N/A Pump P202 STBY STBY STBY STBY STBY Performed the Control Room Key Audit N/A Initial Checklist Performed By Salem/Hope Creek Component Disc & Actuator INITIALS Page 26 of 56 Rev. 2

OPERATOR TRAINING PROGRAM JOB PERFORMANCE MEASURE STATION:

HOPE CREEK SYSTEM:

Administrative TASK:

Complete A Control Console Log For Cond Perform alternate determination of Drywell TASK NUMBER:

4010360301 JPM NUMBER:

ROA2 ALTERNATE PATH:

X K/A NUMBER:

IMPORTANCE FACTOR:

APPLICABILITY:

EO =

RO *j STA I SRO II EVALUATION SETTINGIMETHOD:

Simulator/Perform

REFERENCES:

HC.OP-DL.ZZ-0026(Q), Rev.: 80 TOOLS AND EQUIPMENT:

Calculator VALIDATED JPM COMPLETION TIME:

(8) Minutes TIME PERIOD IDENTIFIED FOR TIME CRITICAL STEPS:

itions 1, 2 & 3 Air Temperature 2.2.12 3.0 RO SRO N/A Page I of 7 CAUTION:

No plant equipment shall be operated during the performance of a JPM without the following:

1. Permission from the OS or Unit CRS;
2. Direct oversight by a qualified individual (determined by the individual granting permission based on plant conditions).
3. Verification of the "as left" condition by a qualified individual.

ACTUAL JPM COMPLETION TIME:

Minutes ACTUAL TIME CRITICAL COMPLETION:

N/A JPM PERFORMED BY:

GRADE: DSAT D

UNSAT REASON, IF UNSATISFACTORY:

EVALUATOR'S SIGNATURE:

DATE:

OPERATOR TRAINING PROGRAM JOB PERFORMANCE MEASURE NAME:

DATE:

Administrative Complete A Control Console Log For Conditions 1, 2 & 3 Perform alternate determination of Drywell Air Temperature TASK NUMBER:

4010360301 INITIAL CONDITIONS:

1. SPDS is out of service.

INITIATING CUE:

Complete HC.OP-DL.ZZ-0026(Q), Attachment la, Item 31, Drywell Air Temperature log entry.

Page 2 of 7 SYSTEM:

TASK:

Successful Completion Criteria:

1. All critical steps completed.
2. All sequential steps completed in order.
3. All time-critical steps completed within allotted time.
4. JPM completed within validated time. Completion time may exceed the validated time if satisfactory progress is being made.

OPERATOR TRAINING PROGRAM JOB PERFORMANCE MEASURE SYSTEM:

TASK:

NAME:

DATE:

Administrative Complete A Control Console Log For Conditions 1, 2 & 3 / Perform alternate determination of Drywell Air Temperature STEP STEP COMMENTS

(*Denotes a Critical Step)

EVAL (Required for UNSAT

(#Denotes a Sequential Step)

S/U evaluation)

Operator obtains/locates procedure Operator obtains the correct procedure.

HC.OP-DL.ZZ-0026(Q).

START TIME:

ITEM SURVEILLANCE OPER ACCEPTABLE LIMITS INSTRUMENT (PANEL)

DAY EVE MID COMMENTS COND MIN NORM MAX

31.

DRYWELL AIR TEMPERATURE 1,2,3 90-110 135 B5070 (SPDS OR CRIDS) OR N/A N/A (NOTE 26) 1I ATTACHMENT 3q LINE F

26. DURING NORMAL OPERATION, DRYWELL AIR TEMPERATURE HAS BEEN 90-11 0F. ANY VALUE OUTSIDE THIS RANGE SHOULD BE INVESTIGATED. IF COMPUTER POINT B5070 IS INOP, DRYWELL TEMPERATURE MAY BE OBTAINED BY COMPLETING AlT 3Q.

Operator manipulates CRIDS to display B5070.

Operator observes the BAD indication for point B5070.

Operator determines that Note 26 applies and moves to Attachment 3q page 1 of 6 to calculate Drywell Air Temperature.

1.

RECORD computer point values from Operator manipulates CRIDS to obtain CRIDS or SPDS in Column A.

the required input values and records (Computer points have the same them in Column A.

numbers for both CRIDS and SPDS.)

Examiner Note: See Attached.

2.

In Column B, RECORD sum of Operator records in Column B, the sum Column A for each elevation zone.

of Column A for each elevation zone.

Page 3 of 7

OPERATOR TRAINING PROGRAM JOB PERFORMANCE MEASURE SYSTEM:

TASK:

NAME:

DATE:

Administrative Complete A Control Console Log For Conditions 1, 2 & 3 / Perform alternate determination of Drywell Air Temperature.

STEP STEP COMMENTS NO.

(*Denotes a Critical Step)

STANDARD EVAL (Required for UNSAT

(#Denotes a Sequential Step)

SIU evaluation)

3.

DIVIDE value obtained in Column B Operator divides the values obtained in by number of operable computer Column B by number of operable inputs in Column A, AND RECORD computer inputs in Column A, AND result in Column C. (T/S require at records the results in Column C.

least one operable input for each group.)

4.

MULTIPLY value obtained in Column Operator multiplies the values obtained C by value given in Column D AND in Column C by values given in Column RECORD result in Column E.

D AND records the result in Column E.

5.

ADD values obtained in Column E Operator adds the values obtained in AND RECORD answer on Line F.

Column E AND records the answers on Line F.

EXAMINER NOTE: To be considered Satisfactory the calculated value of Drywell Air Temperature shall be 107

+1 F.

6.

RECORD value from Line F onto Examiner's Note: Typographical error.

Attachment la Item 35.

Should be line 31.

Operator records the values from line F STOP TIME:

onto Attachment 1 a iterm 31.

Terminating Cue: Repeat back message from the operator on the status of the JPM, and then state "This JPM is complete" Page 4 of 7

JOB PERFORMANCE MEASURE INITIAL CONDITIONS:

1. SPDS is out of service.

INITIATING CUE:

Complete HC.OP-DL.ZZ-0026(Q), Attachment la, Item 31, Drywell Air Temperature log entry.

Page 5 of 7

JOB PERFORMANCE MEASURE SIMULATOR INSTRUCTIONS Reset to IC-1.

Remove CRIDS B5070 from scan using the instructor station CRIDS terminal.

Insert Malfunction CC-03, SPDS Failure.

RESTORE B5070 TO SCAN AT THE COMPLETION OF THE JPM.

Page 6 of 7

PSEG Internal Use Only Traini HC.OP-DL.ZZ-0026(Q) kxaminersv

p ATTACHMENT 3q Drywell Volumetric Average Temperature Calculation Sheet Using SPDS/CRIDS Computer Point Values Page 1 of 6 HCGS DATE

Today's Date

1.

RECORD computer point values from CRIDS or SPDS in Column A. (Computer points have the same numbers for both CRIDS and SPDS.)

2.

In Column B, RECORD sum of Column A for each elevation zone.

3.

DIVIDE value obtained in Column B by number of operable computer inputs in Column A, AND RECORD result in Column C.

(T/S require at least one operable input for each group.)

4.

MULTIPLY value obtained in Column C by value given in Column D AND RECORD result in Column E.

5.

ADD values obtained in Column E AND RECORD answer on Line F.

6.

RECORD value from Line F onto Attachment la Item 35.

INITIALS INITIALS INITIALS INITIALS INITIALS INITIALS ELEV COLUMN A COLUMN B COLUMN C COLUMN D COLUMN E ZONE TEMP. VALUES GROUP GROUP AVG.

FRACTION OF VOLUMETRIC TOTAL TEMP D.W. VOLUME TEMP.

A2264 120.07 e

A2265 120.52 A2268 119.96 724.89 120.815

.082 9.91 A2269 123.69 A2270 119.96 A2271 120.69 A2266 126.63 A2267 126.63 d

A2272 126.63 719.92 119.99

.123 14.76 A2273 126.63 A2274 105.69 A2275 107.71 A2276 108.44 c

A2277 105.42 427.26 106.815

.361 38.56 A2278 107.71 A2279 105.69 A2282 105.42 b

A2283 105.69 402.046 100.5115

.385 38.70 A2284 92.985 A2285 97.951 A2280 114.83 a

A2281 114.83 426.118 106.5295

.049 5.22 A2286 98.229 A2287 98.229 1

1 1

LINE F - DRYWELL VOLUMETRIC AVERAGE AIR TEMPERATURE..............

107 OF Page 7 of 99 Hope Creek Rev. 80

STATION:

SYSTEM:

TASK:

TASK NUMBER:

JPM NUMBER:

OPERATOR TRAINING PROGRAM JOB PERFORMANCE MEASURE HOPE CREEK Administrative Respond To An Abnormal Release Of Gaseous Radioactivity Calculate Iodine Release Rates 4000270401 ROA.3 ALTERNATE PATH: L K/A NUMBER:

IMPORTANCE FACTOR:

APPLICABILITY:

EO =Z RO L--

STA L SRO EVALUATION SETTING/METHOD:

Simulator/Perform

REFERENCES:

HC.OP-AB.ZZ-0126(Q), Rev.: 8 TOOLS AND EQUIPMENT:

Calculator VALIDATED JPM COMPLETION TIME:

(5) Minutes TIME PERIOD IDENTIFIED FOR TIME CRITICAL STEPS:

2.3.11 2.7 RO SRO N/A Page 1 of 7 CAUTION:

No plant equipment shall be operated during the performance of a JPM without the following:

1. Permission from the OS or Unit CRS;
2. Direct oversight by a qualified individual (determined by the individual granting permission based on plant conditions).
3. Verification of the "as left" condition by a qualified individual.

ACTUAL JPM COMPLETION TIME:

Minutes ACTUAL TIME CRITICAL COMPLETION:

N/A JPM PERFORMED BY:

GRADE:

-DSAT DUNSAT REASON, IF UNSATISFACTORY:

EVALUATOR'S SIGNATURE:

DATE:

OPERATOR TRAINING PROGRAM JOB PERFORMANCE MEASURE NAME:

DATE:

SYSTEM:

TASK:

Administrative Respond To An Abnormal Release Of Gaseous Radioactivity Calculate Iodine Release Rates TASK NUMBER:

4000270401 INITIAL CONDITIONS:

1. North Plant Vent (NPV) Stack radiation monitoring activity is rising on RM-1 1 point 9RX590.
2. SPDS is unavailable.
3. Abnormals AB-126 and AB-127 are being executed to determine and stop the release of activity.
4. NPV Exh Flow instrumentation is inoperable. Flow is being estimated in accordance with HC.OP-DL.ZZ-0026(Q), Attachment 3u (Provided).

INITIATING CUE:

Using the RM-1 1, determine the Iodine Release rate from the NPV.

Page 2 of 7 Successful Completion Criteria:

1. All critical steps completed.
2. All sequential steps completed in order.
3. All time-critical steps completed within allotted time.
4. JPM completed within validated time. Completion time may exceed the validated time if satisfactory progress is being made.

OPERATOR TRAINING PROGRAM JOB PERFORMANCE MEASURE NAME:

DATE:

SYSTEM:

TASK:

STEP STEP COMMENTS NO.

(*Denotes a Critical Step)

STANDARD EVAL (Required for UNSAT

(#Denotes a Sequential Step)

S/U evaluation)

Operator obtains/locates procedures Operator obtains the correct HC.OP-AB.ZZ-0126 and HC.OP-procedures.

AB.ZZ-0127.

Operator determines beginning step Operator determines correct beginning of the procedure.

step to be 4.8.

START TIME:

4.8 USE the SPDS Noble Gas Total OR Operator determines that the correct PERFORM the following calculations step to calculate the Iodine release to determine the total release rates for from the NPV is 4.8.2 Noble Gas or Iodine.

4.8.1 CALCULATE the total Noble Gas release rate from Hope Creek Generating Station by adding all gaseous effluent channels SPV (9RX580), NPV (9RX590),

FRVS (9RX680), HTV(9RX518):

N/A N/A

=+

+

+

pCi/sec pCi/sec pCi/sec pCi/sec pCi/sec Total SPV NPV FRVS HTV Page 3 of 7

OPERATOR TRAINING PROGRAM JOB PERFORMANCE MEASURE NAME:

DATE:

SYSTEM:

TASK:

STEP STEP COMMENTS NO.

(*Denotes a Critical Step)

STANDARD EVAL (Required for UNSAT

(#Denotes a Sequential Step)

S/U evaluation) 4.8.2 IF the effluent (pCi/sec) channel on Operator manipulates the RM-1 1 the RM-11 is NOT operating for a terminal to obtain the value of Iodine specific plant vent, THEN release from the 9RX601 detector and CALCULATE the Noble Gas release enters the value into the formula; then rate for that vent using the following:

the operator transfers the Plant Vent Exh Flow value from Attachment 3u of HC.OP-DL.ZZ-0026 (provided); then calulates the Iodine release rate.

Calculated Value =

32.02uCilsec = 1.38E-7 pCi/cc

  • 472

=*

472 pCi/sec pCi/cc (n.g.)

Plant Vent Exh (n.g.)

Flow in cfm where:

pCi/sec (n.g.) -

the calculated release rate from the specified plant vent (Noble Gas) pCi/cc (n.g.)

The concentration of Noble Gas obtained from the RM-1 I (the operable channel will be highlighted in GREEN) OR from an actual sample of the plant vent 472 The conversion factor in units of cc/sec/cfm STOP TIME:

Terminating Cue: Repeat back message from the operator on the status of the JPM, and then state "This JPM is complete" Page 4 of 7

JOB PERFORMANCE MEASURE INITIAL CONDITIONS:

1. North Plant Vent (NPV) Stack radiation monitoring activity is rising on RM-1 I point 9RX590.
2. SPDS is unavailable.
3. Abnormals AB-126 and AB-127 are being executed to determine and stop the release of activity.
4. NPV Exh Flow instrumentation is inoperable. Flow is being estimated in accordance with HC.OP-DL.ZZ-0026(Q), Attachment 3u (Provided).

INITIATING CUE:

Using the RM-11, determine the Iodine Release rate from the NPV.

Page 5 of 7

JOB PERFORMANCE MEASURE SIMULATOR INSTRUCTIONS Reset to IC-1 Insert Malfunctions:

RM9590 @ 1600 RM9601 @ 1.38 E-7 Page 6 of 7

PSEG Internal Use Only TRAINING ONLY ATTACHMENT 3u Radioactive Gaseous Effluent Monitoring (North Plant Vent)

T/S 6.8.4.g ODCM TABLE 3.3.7.11-1 ACTION 122 HC.OP-DL.ZZ-0026(Q)

Page 1 of 1 HCGS DATE:

Today's Date Location Aux/Turb/Radwaste ENTER TIME OF EACH READING BELOW PARAMETER NORM NOWI

[

I COMMENTS SOLID RADWASTE EXH FAN A318 17,000 16863 SOLID RADWASTE EXH FAN B318 17,000 17245 CHEM LAB EXH A307 7,500 7496 CHEM LAB EXH B307 7,500 7519 OFFGAS DISCHARGE HA-XR 10022 OR HA-32.4 F15665 TOTAL FLOW 49155.4 ESTIMATED TOTAL FLOW REPORTED TO RAD PRO - (YES)

Yes Page 81 of 99 If the North Plant Vent Flow Rate Monitor is Inoperable, then Effluent Releases via this pathway may continue for up to 30 days provided flow rate is estimated at least once per 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />.

Readings are taken every 3 hours3.472222e-5 days <br />8.333333e-4 hours <br />4.960317e-6 weeks <br />1.1415e-6 months <br /> to ensure that the 4 hour4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> Tech Spec Action limit is not exceeded per administrative requirements and after a change in the ventilation line-up.

If flow indication(s) become unavailable, then the "NORM" flow value may be logged for the specific fan alignment.

Hope Creek Rev. 80

OPERATOR TRAINING PROGRAM JOB PERFORMANCE MEASURE STATION:

HOPE qfREEK

/

SYSTEM:

Emergency/ECG/E-Plan/Fire & Medical TASK:

Perform the Licensed Operator Review of the Operational Board-Hope Creek TASK NUMBER:

JPM NUMBER:

RO-A.4 ALTERNATE PATH:

KIA NUMBER:

2.4.

IMPORTANCE FACTOR:

3.3 APPLICABILITY

RO EO =

RO EFl STA Z

SRO L=

EVALUATION SETTING/METHOD:

Simulator/Perform

REFERENCES:

Hope Creek Event Classification Guide, Attachment 8, Rev.: 7 TOOLS AND EQUIPMENT:

None VALIDATED JPM COMPLETION TIME:

(10) Minutes TIME PERIOD IDENTIFIED FOR TIME CRITICAL STEPS:

N/A Status 39 SRO Page 1 of 8 CAUTION:

No plant equipment shall be operated during the performance of a JPM without the following:

1. Permission from the OS or Unit CRS;
2. Direct oversight by a qualified individual (determined by the individual granting permission based on plant conditions).
3. Verification of the "as left" condition by a qualified individual.

ACTUAL JPM COMPLETION TIME:

Minutes ACTUAL TIME CRITICAL COMPLETION:

N/A JPM PERFORMED BY:

GRADE: D SAT n UNSAT REASON, IF UNSATISFACTORY:

EVALUATOR'S SIGNATURE:

DATE:

OPERATOR TRAINING PROGRAM JOB PERFORMANCE MEASURE NAME:

DATE:

SYSTEM:

TASK:

Emergency/ECG/E-Plan/Fire & Medical Perform the Licensed Operator Review of the Operational Status Board Hope Creek TASK NUMBER:

INITIAL CONDITIONS:

1. CRIDS is out of service.
2. A small LOCA has occurred.
3. The plant was scrammed approximately 20 minutes ago.
4. Operator actions were taken lAW the Emergency Operating Procedures, HC.OP EO.ZZ-0101, RPV Control, and HC.OP-EO.ZZ-0102, Primary Containment Control
5. An alert was declared approximately 10 minutes ago.

INITIATING CUE:

Perform the Licensed Operator Review of the Operational Status Board-Hope Creek.

Page 2 of 8 Successful Completion Criteria:

1. All critical steps completed.
2. All sequential steps completed in order.
3. All time-critical steps completed within allotted time.
4. JPM completed within validated time. Completion time may exceed the validated time if satisfactory progress is being made.

,!*27

SYSTEM:

TASK:

OPERATOR TRAINING PROGRAM JOB PERFORMANCE MEASURE Emergency/ECG/E-Plan/Fire & Medical Perform the Licensed Operator Review of the Operational Status Board-Hope Creek NAME:

DATE:

STEP STEP COMMENTS NO.

(*Denotes a Critical Step)

STANDARD EVAL (Required for UNSAT

(#Denotes a Sequential Step)

SIU evaluation)

Examiner Note: All values are checked by designated Recorder START TIME:

_indications, since, CRIDS is OOS.

2.

IF requested by the TSC, Examiner Note: Some values that are THEN COMPLETE the Operational recorded are obtainable from more than Status Board (OSB) Form every 15 one indicator. Due to differences in minutes; (TSS may modify the indicators, it is not critical to get an frequency or data list as appropriate) exact value. Values, however, should

( )a. OBTAIN Licensed Operator be approximately as noted.

review.

Operator reviews the OSB and STOP TIME:

compares it to the plant conditions.

Operator identifies that II.A, RHR/LPCI FLOW A and RHR/LPCI FLOW C should be circled, since, they are not in the LPCI mode (see **). Operator corrects the OSB, AND intials.

Terminating Cue: Repeat back message from the operator on the status of the JPM, and then state "This JPM is complete" Page 3 of 8

JOB PERFORMANCE MEASURE INITIAL CONDITIONS:

1. CRIDS is out of service.
2. A small LOCA has occurred.
3. The plant was scrammed approximately 20 minutes ago.
4. Operator actions were taken lAW the Emergency Operating Procedures, HC.OP EO.ZZ-0101, RPV Control, and HC.OP-EO.ZZ-01 02, Primary Containment Control
5. An alert was declared approximately 10 minutes ago.

INITIATING CUE:

Perform the Licensed Operator Review of the Operational Status Board-Hope Creek.

Page 4 of 8

Job Performance Measure Simulator Setup Optional Reset Simulator to a low power IC Insert RR31A2 @ 10%

Take scram actions Restore level to 12.5-54 inches Close MSIVs @ approx. 550 psig Line up A RHR in SPC/SPS Line up B RHR in Drywell Spray Secure A-D Core Spray Pumps & C-D RHR pumps Freeze simulator when stable and level is 12.5-54 inches Darken the lower CRIDS screens to simulate CRIDS OOS.

Page 5 of 8

TRAINING ONLY Examiner's Copy OSB OPERATIONAL STATUS BOARD -

HOPE CREEK NOTE:

1) IF REQUESTED, TRANSMIT THIS FORM TO GROUP C
2)

PROVIDE A COPY TO THE OSC COORDINATOR.

3)

SEE CRIDS PAGE 232 FOR DATA.

ITSC AND EOF) EVERY 15 MINUTES.

DATE: Today TIMES (24-HOUR CLOCK)

Now BALANCE OF PLANT A. CST LEVEL B, CONDENSER PRESSURE C, RCIC FLOW D. FEED FLOW II.

ECCS A. RHR/LPCI FLOW-A**

RHR/LPCI FLOW-C RHR1LPCI FLOW-B**

RHR/LPCI FLOW-D B. HPCI PUMP FLOW C. CORE SPRAY FLOW-A CORE SPRAY FLOW-B D. SRV (OPEN) STATUS III.

RX COOLANT SYSTEM A. POWER B. WATER LEVEL (17 C. PRESSURE D. TEMPERATURE E. RECIRC FLOW - A LOOP RECIRC FLOW - B LOOP F. JET PUMP FLOW (TOTAL)

IV.

CONTAINMENT A, DRYWELL PRESSURE TEMPERATURE H2 CONC.

02 CONC.

B. SUPP. CHAMBER PRESS.

AIR TEMPERATURE WATER LEVEL WATER TEMPERATURE C. RX BLDG. DELTA P INST UNITS x io4 GAL IN. HGa GPM MLB/HR GPM GPM GPM GPM GPM GPM GPM

  1. OPEN E PLAN (1)

(2)

(3)

(4)

(5)

(5)

(6)

(6)

(7)

(8)

(9)

(10) 11-16)

% or CPS

,21,22)

IN.

(18,19)

PSlG (23)

DEGREES F

(24)

X 103 GPM (24)

X 103 GPM (25)

MLB/HR

,20, (26,27)

PSIG (28,29)

DEGREES F

(30,31)

(30,31)

(26,27)

PSIG (28,29)

DEGREES F

(32)

IN.

(33,34)

DEGREES F

(35,36)

IN. H20 V.

SSCL A. OFFSITE POWER AVALABLE?

B. 3 OR MORE DG'S AVAILABLE?

C. DID ANY ECCS ACTUATE?

D, IS THE CONTAINMENT BARRIER FAILED?

LICENSED OPERATOR REVIEW OTHER SIGNIFICANT ITEMS YES/NO Yes YES/NO Yes YES/NO Yes YES/NO No INITALS: INITIALS

  • IF NOT IN LPCI MODE FLOW RATE IS CIRCLED (I.e. S/D COOLING, CONT. SPRAY, ETC.)

HCGS Rev. 07 Page 6 of 8

'-.1 yr t

ECG ATT 8 Pg. 6 of 9 38.7 8

0 01 0

0960-')

0 0

0 0

3.3 E3 cps 325 430 8.1 0.1 11.7 8

202 0

0 8

100 79.4 105

-0.56

TRAINING ONLY Examinee'q CoM SSCL STATION STATUS CHECKLIST EG (Pg. 1 of 2)

ATT 8 Pg. 7 of 9 Operational Information HOPE CREEK GENERATING STATION Message Date Today Time Transmitted By: Name John Smith Position CM1 Today (COSC/EOF)

1. Date and Time Event Declared: Date Today Time

-_2_

4 hr clock)

2. Event Classification:

0 Unusual Event 03 Site Area Emergency IS Alert 0 General Emergency

3. Cause of Event: Primary Initiating Condition used for declaration EAL #(s) 3.2.2.b Description of the event Loss of Reactor Coolant System Boundary
4. Status of Reactor:

0l Scrammed/Time

[0 At Power 03 Startup 0 Hot Shutdown 01 Cold Shutdown 0 Refuel

5. Rx Pressure 332 psig Rx Temp 430 0F Rx Water Level _

3 in.

6. Is offsite power available?

El YES 0 NO

7. Are three or more diesel generators available?

IN YES O NO

8. Did any Emergency Core Cooling Systems actuate?

0R YES 03 NO

9. Is the Containment barrier failed? (Loss per EAL section 3.3) 0 YES 0M NO
10. Other pertinent information APPROVED:

P]

HCGS EC, r TSS or SSM Rev. 07 Page 7 of 8

TRAINING ONLY Examinee's Copy OSB OPERATIONAL STATUS BOARD -

HOPE CREEK NOTE:

1) IF REQUESTED, TRANSMIT THIS FORM TO GROUP C (TSC AND EOF]

EVERY 15 MINUTES.

2)

PROVIDE A COPY TO THE OSC COORDINATOR.

3) SEE CRIDS PAGE 232 FOR DATA.

TIMES (24-HOUR CLOCK)

IBALANCE OF PLANT A. CST LEVEL B. CONDENSER PRESSURE C. RCIC FLOW D. FEED FLOW II.

ECCS A. RHR/LPCI FLOW-A**

RHR/LPCI FLOW-C RHR/LPCI FLOW-B**

RHR/LPCI FLOW-D B. HPCI PUMP FLOW C. CORE SPRAY FLOW-A CORE SPRAY FLOW-B D. SRV (OPEN) STATUS II.

RX COOLANT SYSTEM A. POWER B. WATER LEVEL (17 C. PRESSURE D. TEMPERATURE E. RECIRC FLOW - A LOOP RECIRC FLOW - B LOOP F. JET PUMP FLOW (TOTAL)

INST UNITS E PLAN (1)

(2)

(3)

(4)

(5)

(5)

(6)

(6)

(7)

(8)

(9)

(10)

(

,20,

(

IV.

CONTAINMENT A. DRYWELL PRESSURE TEMPERATURE X 104 GAL IN. HGa GPM MLB/HR GPM GPM GPM GPM GPM GPM GPM

  1. OPEN 11-16)

%or CPS 21,22)

IN.

18,19)

PSIG (23)

DEGREES F

(24)

X 103 GPM (24)

X io3 GPM (25)

MLBIHR (26,27)

(28,29)

H2 CONC.

(30,31) 02 CONC.

(30,31)

B. SUPP. CHAMBER PRESS.

(26,27)

AIR TEMPERATURE (28,29)

WATER LEVEL (32)

WATER TEMPERATURE (33,34)

C. RX BLDG. DELTA P (35,36)

V.

SSCL A. OFFSITE POWER AVALABLE?

B. 3 OR MORE DG'S AVAILABLE?

C. DID ANY ECCS ACTUATE?

D. IS THE CONTAINMENT BARRIER FAILED?

PSIG DEGREES F

DEGREES F

IN.

DEGREES F

IN. 1120 DATE: Today Now 38.7 8

0 0,1 10498 9960 0

0 0 0 3.3 E3 cps 325 430 8.1 0.1 11.7 8

202 0

TO 0 100 79.4 105

-0.56 YES/NO Yes YES/NO Yes YES/NO Yes YES/NO No LICENSED OPERATOR REVIEW INITALS:

OTHER SIGNIFICANT ITEMS

    • IF NOT IN LPCI MODE FLOW RATE IS CIRCLED (I.e. S/D COOLING, CONT. SPRAY, ETC.)

HCGS Rev. 07 Page 8 of 8 ECG ATT 8 Pg. 6 of 9 HCGS Rev. 07