MONTHYEARML0209801632002-04-15015 April 2002 DC Cook, Unit 1 - Telephone Conversation with Indiana Michigan Power Company the Upcoming Inspection of the Reactor Vessel Head Project stage: Other ML0230901802002-11-19019 November 2002 DC Cook, Units 1 and 2, RAI, Bulletin 2002-01, Reactor Pressure Vessel Head Degradation and Reactor Coolant Pressure Boundary Integrity. Project stage: RAI ML0316310322003-06-13013 June 2003 Bulletin 2002-01, Reactor Pressure Vessel Head Degradation and Reactor Coolant Pressure Boundary Integrity, 15-Day Response Project stage: Other 2002-04-15
[Table View] |
Similar Documents at Cook |
---|
Category:Memoranda
MONTHYEARML23044A3662023-02-15015 February 2023 Calendar Year 2022 Reactor Oversight Process Baseline Inspection Program Completion - Region III ML21062A2552021-04-0707 April 2021 Federal Register Notice for Environmental Assessments and Findings of No Significant Impact of Independent Spent Fuel Storage Facilities Decommissioning Funding Plans Related to Donald C. Cook Nuclear Plant; Memo to File ML20280A1812020-10-16016 October 2020 Insights Obtained from Review of D.C. Cook Seismic Probabilistic Risk Assessment ML20209A6032020-07-27027 July 2020 Summary of the July 21, 2020, Public Webinar to Discuss the NRC 2019 End-of-Cycle Plant Performance Assessment of the Donald C. Cook Nuclear Plant, Units 1 and 2 IR 05000315/20140052019-02-0505 February 2019 NRR Position on NCV 05000315/2014005-03; 05000316/2014005-03; Radiological Impact of the Removal of the Auxiliary Shield Blocks on the Containment Accident Shield Post Large-Break Loss-of-Coolant Accident ML17080A1192017-06-23023 June 2017 NRR Position on NCV 05000315/2014005-03; 05000316/2014005-003 Radiological Impact of the Removal of the Auxiliary Shield Blocks on the Containment Accident Shield Post LBLOCA ML15237A3362015-09-0202 September 2015 Summary of August 24, 2015, Telephone Call to Provide Verbal Authorization of Relief Request ISIR-4-06, Alternate Repair of Socket Weld ML15150A0352015-07-0808 July 2015 Memorandum Documenting Withdrawal and Planned Denial of Emergency License Amendment Request to Extend the Allowed Outage Time for an Emergency Diesel Generator ML15127A5692015-05-0707 May 2015 Final Task Interface Agreement-Regulatory Position on Design Life of Safety-Related Structures, Systems, & Components Related to Unresolved Items at D. C. Cook, Monticello, & Palisades (TIA 2014-01) ML14023A3872014-01-30030 January 2014 Summary of Joint Steering Committee Meeting to Discuss Activities Related to Lessons-Learned from the Fukushima Dai-Ichi Nuclear Power Plant Event ML13161A3802013-06-12012 June 2013 Meeting Notice with Indiana Michigan Power Company (I&M) Concerning Donald C. Cook Nuclear Plant, Unit 1 ML13085A1842013-04-22022 April 2013 Review and Conclusion of Indiana Michigan Power Company'S Resolution of Facts and Observations in Support of DC Cook'S Transition to NFPA 805 ML13011A3822012-12-0707 December 2012 Task Interface Agreement - Licensing Basis for Steam Generator Tube Rupture Event Coincident with Loss of Offsite Power (TIA 2012-11) ML12215A1562012-08-0303 August 2012 Memo Indian Michigan Power Company- Donald C. Cook Nuclear Plant, Unit 1 and 2 Revised Safety Evaluation Input - Cyber Security Program ML12144A3552012-05-24024 May 2012 DC Cook Physical Security Plan Review Memo for the Independent Spent Fuel Storage Installations Security and Verification of ASM Incorporation ML1211504272012-04-20020 April 2012 Memo to S. Wastler Technical Assistance Request - Review of Physical Security Plan of Donald C. Cook Nuclear Plant (TAC L24638) ML11115A0012011-04-26026 April 2011 Notice of Forthcoming Meeting with Indiana Michigan Power Company to Discuss Pre-Application Issues Related to the Future Amendment to Transition to NFPA 805, Performance-Based Fire Protection ML1016202942010-06-11011 June 2010 Project Manager Assignment ML0815606912008-07-11011 July 2008 Transmittal of Final Accident Sequence Precursor (ASP) Analyses of Operational Events That Occurred at D.C. Cook, Unit 2 on November 8, 2005 and at Brunswick, Unit 2 on November 1, 2006 ML0812802272008-05-0202 May 2008 Memorandum from Hubert T. Bell to Chairman Dale E. Klein, NRC Staff Review of License Renewal Applications ML0809200582008-04-18018 April 2008 Summary of Phone Call with Licensees Concerning Sump Strainer Head Loss Testing ML0807400842008-03-14014 March 2008 Draft Regulatory Guide for Comment ML0732410262007-11-21021 November 2007 Notice of Meeting with D. C. Cook to Discuss Issues Concerning Ice Fusion in Ice Condenser Baskets ML0710603252007-04-17017 April 2007 Notice of Meeting with D. C. Cook Regarding Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design-Basis Accidents at Pressurized-Water Reactors ML0623705122006-09-19019 September 2006 Memo: Summary of NFPA 805 Workshop at DC Cook ML0615202802006-06-0101 June 2006 DC Cook, RAI, Shifting the Reactor Trip on Turbine Trip Interlock from P-7 to P-8 ML0611504292006-04-25025 April 2006 Forthcoming Meeting with D. C. Cook Nuclear Plant, Units 1 and 2, Regarding Implementation of Degraded Voltage Protection Backfit ML0608301672006-03-23023 March 2006 D.C. Cook DRS Input to Integrated Report 05-315/2006-003; 50-316/2006-003 ML0625401692005-09-30030 September 2005 Memo T. Boyce, NRR, to C. Carpenter, NRR, Fiscal Year 2005 Audit/Self Assessment & Evaluation of Quality of Plant Conversions ML0526305372005-09-22022 September 2005 Unit 2 - Closeout Letter for Bulletin 2003-01, Potential Impact of Debris Blockage on Emergency Sump Recirculation at Pressurized-water Reactors. ML0513200192005-05-17017 May 2005 Information Provided in E-Mail Dated April 20, 2005, for Donald C. Cook Nuclear Plant for the ITS Conversion Amendments ML0513201652005-05-12012 May 2005 5-12-05 - Results of the Severe Accident Mitigation Alternative (SAMA) Review for Donald C. Cook Nuclear Plant, Units 1 and 2 ML0510901352005-04-15015 April 2005 E-mail Form T. Steingass to C. Lyon Donald C. Cook Unit 1, Request for Additional Information ML0434803502005-02-28028 February 2005 Response to Task Interface Agreement (TIA 2004-02), Request for Protection ML0504901422005-02-17017 February 2005 Summary of January 13, 2005, Meeting Between the U.S. Nuclear Regulatory Commission (NRC) and Nuclear Energy Institute (NEI) on Updating the License Renewal Guidance Documents ML0433403052004-11-30030 November 2004 Notice of Meeting with Indiana Michigan Power Company to Discuss the Degraded Voltage Protection Design at the Donald C. Cook Nuclear Plant ML0432105772004-11-15015 November 2004 Audit and Review Report for Plant Aging Management Reviews and Programs at the Donald C. Cook Nuclear Power Plant, Units 1 and 2 ML0427904842004-09-23023 September 2004 Summary of Telephone Conference Held on September 7, 2004, Between the Us NRC and Indiana Michigan Power Company, Concerning Unresolved Items Pertaining to the Donald C. Cook Nuclear Plant, Units 1 & 2, LRA ML0427902732004-09-22022 September 2004 Summary of Telephone Conference Held Between the U.S. Nuclear Regulatory Commission and Indiana Michigan Power Company, Concerning Follow-Up Items to Request for Additional Information Pertaining to DC Cook, Units 1 & 2, LRA ML0424406712004-08-31031 August 2004 Summary of Telephone Conference Held on August 10, 2004 Between the U.S. Nuclear Regulatory Commission (NRC) and Indiana Michigan Power Company (I&M) Representatives Concerning Requests for Additional Information on Donald C. Cook Nuclear P ML0417400862004-06-21021 June 2004 All Region III Facility Training Managers Revised NRC Form 398 - Personal Qualification Statement Licensee ML0415902732004-06-0707 June 2004 TIA 04-02 Request for Technical Assistance Re Degraded Voltage Protection at D. C. Cook ML0510300282004-02-0909 February 2004 Receipt of Proposed Differing Professional View ML0335800462003-12-23023 December 2003 Transmittal of Final ASP Analysis of August 2001 Operational Condition at D.C. Cook 1 & 2 ML0324005922003-05-24024 May 2003 May 10-11, 2000, Summary of NRC Senior Management Meeting to Review Performance of Operating Nuclear Power Plants and Materials Facilities Licensed by Nrc. Partially Withheld ML0312105392003-05-0101 May 2003 Meeting with TVA and American Electric Power Staff'S Draft Evaluation for Ice Condenser Topical Report McGuire, Catawba, Sequoyah, Watts Bar, and D.C.Cook ML0510300512003-01-13013 January 2003 Response to Task Interface Agreement (TIA 2001 -15) Regarding Evaluation of Containment Structure Conformance to Design-basis Requirements ML0232903772003-01-13013 January 2003 Task Interface Agreement (TIA 2001-15) Evaluation of Containment Structure Conformance to Design-Basis Requirement IR 05000315/20020092003-01-10010 January 2003 Memo 1/10/03, D.C. Cook, DRS Input to DRP IR 05000315-02-009 and 05000316-02-009 ML0300802552003-01-0808 January 2003 Report on Status of Open TIAs Assigned to NRR 2023-02-15
[Table view] |
Text
April 15, 2002 MEMORANDUM TO: File FROM: John F. Stang, Sr. Project Manager, Section 1 /RA/
Project Directorate III
SUBJECT:
TELEPHONE CONVERSATION WITH INDIANA MICHIGAN POWER COMPANY REGARDING THE UPCOMING INSPECTION OF THE REACTOR VESSEL HEAD OF DONALD C. COOK NUCLEAR PLANT, UNIT 1 (TAC NO. MB4540)
On March 28, 2002, and March 29, 2002, the U.S. Nuclear Regulatory Commission (NRC) staff held a telephone conference call with the staff of Indiana Michigan Power Company (the licensee) to discuss the upcoming reactor vessel head inspection at Donald C. Cook Nuclear Plant, (D.C. Cook) Unit 1.
The conversation is summarized below:
The NRC staff asked the licensee to describe the upcoming reactor vessel head inspection for D.C. Cook, Unit 1. The licensee indicated that it will perform a 100 percent bare metal visual inspection of the Unit 1 head under the insulation during the upcoming Unit 1 Cycle 18 refueling outage. Certified personnel will perform the inspections.
The licensee also indicated that it will perform one of the following inspections for each of the control rod drive mechanism (CRDM) and thermocouple penetrations during the Unit 1, Cycle 18 refueling outage:
Surface examination, eddy current test or liquid penetrant, of the wetted surfaces on and near the J-groove weld on the outside and inside diameter, supplemented by ultrasonic testing as necessary for weld locations that are not accessible by eddy current probes.
Ultrasonic testing from the inside diameter of the penetration capable of detecting circumferential cracks on the outside diameter above and in the vicinity of the J-groove weld.
The licensee stated that the basis for the 100 percent bare metal visual inspection and the non-destructive examinations is to confirm that the vessel head has no indications of degradation, and that the CRDM and thermocouple penetrations have no unacceptable flaws.
The NRC staff asked the licensee the history of boric acid leaking on the Unit 1 reactor vessel head, and if a bare metal inspection of the Unit 1 reactor vessel head had been performed previously.
The licensee indicated that a 100 percent bare metal inspection of the reactor vessel head has not been performed. However, in 1994, using a remote camera, a bare metal inspection of the 34 outermost penetrations was performed to detect evidence of reactor coolant system reactor coolant system leakage. No leakage from the vessel head was detected during this examination. During the same outage, three canopy seal weld leaks that had been identified were repaired. Three panels of insulation were moved or removed for boric acid cleaning. The majority of the boric acid was cleaned, but minor amounts of dried boric acid crystals were allowed to remain on the head. Upon completion of cleaning, a bare metal VT-1 examination of these areas was performed using both direct visual and a remote camera system. The VT-1 examination was found to be acceptable. The three leaking canopy seal welds were repaired prior to returning Unit 1 to power. Since 1994, there have been no leaks from above the reactor vessel head that have reached the insulation.
In addition, the licensee stated that penetration cracking is not expected to exist in Unit 1 due to its low susceptibility ranking. The plant-specific input data used in developing the susceptibility ranking were the average operating temperature of the reactor vessel head over the life of the plant and the number of effective full power years (EFPY) of operation. The susceptibility evaluation showed that it will take 30.3 EFPY of additional operation for D.C. Cook, Unit 1 (from March 2001), to reach the same time-at-temperature as Oconee-3 at the time the leaking nozzles were discovered. This is based on the assumption that the average head temperatures remain the same for future years. In addition, the most recent boric acid walkdowns following a forced outage in September 2001, revealed no leakage from sources above the head.
ML020980163 OFFICE PM:PD3-1 LA:PD3-1 SC:PD3-1 NAME JStang THarris LRaghavan DATE 02/11/02 04/11/02 04/15/02