Category:Drawing
MONTHYEARML24054A0562024-04-0202 April 2024 Figure 2 Controlled Area; Ape for Indirect Effects ML24054A0572024-04-0202 April 2024 Figure 3, Disturbed Area/Facility Footprint ML24054A0552024-04-0202 April 2024 Figure 1, Approximate Scale 1 in = Miles ML19029A0032018-07-18018 July 2018 Reference 1 - Duke Energy Crystal River Plant Descriptions (Survtech Solutions) ML12054A1992012-01-0505 January 2012 Drawing E-201-141, Rev. 11, (D-201-141), Electrical Main Control Board Integ. Cont. System Assy. ML12054A1962012-01-0505 January 2012 Drawing E-201-151, Rev. 20, (D-201-151), Electrical Main Control Board Primary Secondary Auxiliaries Assembly 3F0112-05, Drawing E-201-141, Rev. 8, (D-201-141), Electrical Main Control Board Integ. Cont. System Assy.2012-01-0505 January 2012 Drawing E-201-141, Rev. 8, (D-201-141), Electrical Main Control Board Integ. Cont. System Assy. ML11314A1372011-09-0101 September 2011 Drawing No. 522-041-018, EC70139, Rev. 0, Attachment Z93R0, Column Connections to Concrete Floor ML11314A1322011-09-0101 September 2011 Drawing No. 522-041-012, EC70139, Rev. 0, Attachment Z70R0, E-W Member Moment Connections at Floor, El. 162'-0 ML11314A1362011-09-0101 September 2011 Drawing No. 522-041-016, EC70139, Rev. 0, Attachment Z92R0, N-S Member Connections at El. 162'-0 ML11314A1352011-09-0101 September 2011 Drawing No. 522-041-015, EC70139, Rev. 0, Attachment Z91R0, N-S Member Connections at El. 162'-0 ML11314A1342011-09-0101 September 2011 Drawing No. 522-041-014, EC70139, Rev. 0, Attachment Z73R0, N-S Member Connections at El. 162'-0 ML11314A1332011-09-0101 September 2011 Drawing No. 522-041-013, EC70139, Rev. 0, Attachment Z72R0, E-W Member Moment Connections at Floor, El. 162'-0 ML11314A1312011-09-0101 September 2011 Drawing No. 522-041-011, EC70139, Rev. 0, Attachment Z52R0, Crane Girder Bracket Connections ML11314A1302011-09-0101 September 2011 Drawing No. 522-041-010, EC70139, Rev. 0, Attachment Z52R0, E-W Member Moment Connections at Floor El. 162'-0 ML11314A1292011-09-0101 September 2011 Drawing No. 522-041-009, EC70139, Rev. 0, Attachment Z51R0, Vertical Bracing Connections ML11314A1282011-09-0101 September 2011 Drawing No. 522-041-008, EC70139, Rev. 0, Attachment Z50R0, Vertical Bracing Connections ML11314A1272011-09-0101 September 2011 Drawing No. 522-041-007, EC70139, Rev. 0, Attachment Z49R0, Vertical Bracing Connections ML11314A1262011-09-0101 September 2011 Drawing No. 522-041-006, EC70139, Rev. 0, Attachment Z48R0, Vertical Bracing Connections ML11314A1252011-09-0101 September 2011 Drawing No. 522-041-005, EC70139, Rev. 0, Attachment Z47R0, Vertical Bracing Connections ML11314A1242011-09-0101 September 2011 Drawing No. 522-041-004, EC70139, Rev. 0, Attachment Z46R0, Vertical Bracing Connections ML11314A1232011-09-0101 September 2011 Drawing No. 522-041-003, EC70139, Rev. 0, Attachment Z45R0, Vertical Bracing Connections ML11314A1492011-09-0101 September 2011 Drawing No. 521-142-003, EC70139, Rev. 0, Attachment Z109R0, Column Connections to Concrete Floor ML11314A1542011-09-0101 September 2011 Drawing No. 422-057-001, EC70139, Rev. 0, Attachment Z119R0, Concrete Tie Beam Between 301-S, and 302A-S Concrete Column Pier ML11314A1552011-09-0101 September 2011 Drawing No. 522-041-022, EC70139, Rev. 0, Attachment Z120R0, Crane Girder Bracket Connections ML11314A1562011-09-0101 September 2011 Drawing No. 522-041-023, EC70139, Rev. 0, Attachment Z121R0, E-W Member Moment Connections at Floor El. 162'-0 3F0911-01, Drawing No. 522-041-024, EC70139, Rev. 0, Attachment Z122R0, Vertical Bracing Connections2011-09-0101 September 2011 Drawing No. 522-041-024, EC70139, Rev. 0, Attachment Z122R0, Vertical Bracing Connections ML11314A1382011-09-0101 September 2011 Drawing No. 522-041-019, Rev. 0, EC70139, Rev. 0, Attachment Z95R0, Column Connections to Concrete Floor ML11314A1532011-09-0101 September 2011 Drawing No. 521-142-006, EC70139, Rev. 0, Attachment Z118R0, Crane Girder Bracket Connections ML11314A1522011-09-0101 September 2011 Drawing No. 521-142-005, EC70139, Rev. 0, Attachment Z117R0, Crane Girder Bracket Connection ML11314A1512011-09-0101 September 2011 Drawing No. 522-041-021, EC70139, Rev. 0, Attachment Z111R0, Crane Girder Bracket Connections ML11314A1502011-09-0101 September 2011 Drawing No. 521-142-004, EC70139, Rev. 0, Attachment Z110R0,Column Connections to Concrete Floor ML11314A1482011-09-0101 September 2011 Drawing No. 522-041-002, EC70139, Rev. 0, Attachment Z108R0, Vertical Bracing Connections ML11314A1472011-09-0101 September 2011 Drawing No. 522-041 Sheet 001, EC 70139, Rev. 0, Attachment Z107R0, Vertical Bracing Member Replacement, Vertical Bracing Connections, N-S Member Connections at Roof El. 209'-1 (Between Column Line P1 & Q1), E-W Member.. ML11314A1462011-09-0101 September 2011 Drawing No. 522-041-020, EC70139, Rev. 0, Attachment Z106R0, Vertical Bracing Member Replacement and Vertical Bracing Connections ML11314A1452011-09-0101 September 2011 Drawing No. 521-142-002, EC70139, Rev. 0, Attachment Z105R0, Crane Girder Bracket Connections ML11314A1442011-09-0101 September 2011 Drawing No. 522-041-017, EC70139, Rev. 0, Attachment Z104R0, Miscellaneous N-S Member Connections and E-W Member Connections at El. 189'-9 (at Column Line S1) ML11314A1432011-09-0101 September 2011 Drawing No. S-522-006, EC70139, Rev. 0, Attachment Z103R0, Vertical Bracing Member Replacement and Vertical Bracing Connections ML11314A1422011-09-0101 September 2011 Drawing No. S-522-004 EC70139, Rev. 0, Attachment Z102R0, E-W Member Connections at Roof El. 209'- 1 (at Column Line S1), N-S Member Connections at Roof El. 209'-1 (Between Column Line P1 & Q1)., N-S Member Connections.. ML11314A1412011-09-0101 September 2011 Drawing No. S-522-003, EC70139, Rev. 0, Attachment Z101R0, E-W Member Moment Connections at Floor El. 162'-0, E-W Member Connections at El. 162'-0 (at Column Line L, at Column Line S1, and Between Column Line M1 and N1), N-S.. ML11314A1402011-09-0101 September 2011 Drawing No. S-521-102, EC70139, Rev. 0, Attachment Z96R0, N-S Member Connections (Purlin) at Roof El. 209'-1 ML11314A1392011-09-0101 September 2011 Drawing No. 521-142-001, EC70139, Rev. 0, Attachment Z100R0, Horizontal Bracing Connections at Roof El. 209'-1 (Between Column Line I1 & J1) ML11256A0822011-07-20020 July 2011 Drawing 521-142, Revision 0, Auxiliary Building - South Steel Framing Modifications Elevations. Sheet 001 3F0711-04, Drawing 522-041, Revision 0, Auxiliary Building South Steel Framing Modifications Details. Sheet 0222011-01-0606 January 2011 Drawing 522-041, Revision 0, Auxiliary Building South Steel Framing Modifications Details. Sheet 022 ML11256A0862011-01-0606 January 2011 Drawing 522-041, Revision 0, Auxiliary Building South Steel Framing Modifications Details. Sheet 021 ML11256A0872011-01-0606 January 2011 Drawing 521-142, Revision 0, Auxiliary Building North Steel Framing Modifications Details. Sheet 005 ML11256A0882011-01-0606 January 2011 Drawing 521-142, Revision 0, Auxiliary Building North Steel Framing Modifications Details. Sheet 006 ML11256A0842010-12-10010 December 2010 Drawing 521-142, Revision 0, Auxiliary Building North Steel Framing Base Plate Modifications. Sheet 003 ML1029200772010-09-20020 September 2010 Licensee Drawing SC-421-032, Title Illegible ML1029200762010-09-20020 September 2010 Licensee Drawing SC-421-036, Title Illegible 2024-04-02
[Table view] Category:Graphics incl Charts and Tables
MONTHYEARML16056A1392016-03-11011 March 2016 Correction to the U.S. Nuclear Regulatory Commission Analysis of Licensees' Decommissioning Funding Status Reports RA-13-012, Capability to Perform Multi-Unit Dose Assessment2013-06-26026 June 2013 Capability to Perform Multi-Unit Dose Assessment ML13037A2042013-01-31031 January 2013 Response to Second Request for Additional Information to Support NRC Reactor Systems Branch (Srxb) Technical Review of the CR-3 Extended Power Uprate LAR ML1214500142012-05-23023 May 2012 NFPA 805 LAR Status Matrix - May 2012 ML11112A1222011-06-10010 June 2011 Request for Additional Information and Schedule Revision for the Review of the Crystal River Unit 3 Nuclear Generating Plant License Renewal Application (TAC Nos. ME0274 and ME0278) ML1029107172010-10-20020 October 2010 Horizontal Tendons Pages 26-39 ML1013901262010-05-17017 May 2010 Table of Expiration Dates for Permits Associated with Crystal River Unit 3 for Draft Supplemental Environmental Impact Statement ML1029200902010-03-17017 March 2010 9.2 Seismic Events ML1029200892010-03-17017 March 2010 9.1 Hurricanes or Tornadoes ML1029200882010-03-17017 March 2010 8.4 Inadequate Concrete Structure ML1029200932010-03-17017 March 2010 9.3 Ground Movement ML1028703312010-01-30030 January 2010 5.7 Exhibit 7 Winter 2002-2010 ML1028703432010-01-29029 January 2010 Email - Subject: Detensioning Sequence Spreadsheets ML1027201562010-01-22022 January 2010 Email from Chou, Rich to Morrissey, Thomas, Dated Friday, January 22, 2010, 5:01 PM Cc Lake, Louis, Sykes, Marvin, Franke, Mark and Reyes, Rogerio; Subject: FW: Ctr Level II Schedule, Attachments: 01-25-10 Level 2 Rev E - 11x17.pdf ML1028706302010-01-22022 January 2010 Detensioning Sequence - Case 10 ML1028711742010-01-21021 January 2010 FW: Ctr Level II Schedule ML1028708112010-01-21021 January 2010 Email - from: Miller, Craig L (Craig.Miller@Pgnmail.Com) to Lake, Louis; Thomas, George; Carrion, Robert; 'Nausdj@Ornl.Gov'; Souther, Martin; 'Trowe@Wje.Com' Cc: Williams, Charles R. Dated Friday, January 22, 2010 8:53 Am Subject: FW: Failu ML1028711752010-01-21021 January 2010 5.3 Maintenance ML1028711762010-01-20020 January 2010 from: Williams, Charles R. (Charles.Williams@Pgnmail.Com) to: Lake, Louis; Thomas, George Dated Wednesday, January 20, 2010 5:16 PM Subject: FW: 01-21-10 Containment Repair Project Level 3 Schedule Attachments: 01 -21-10 Level 3 Rev D... At ML1028805012010-01-18018 January 2010 Email - from: Williams, Charles R., to: Lake, Louis; Thomas, George Dated Monday, January 18, 2010 4:18 PM, FW: 01-19-10 Containment Repair Project Level 3 Schedule, Attachments: 01-19-10 Level 3 Rev D - 11x17.pdf ML1028805092010-01-17017 January 2010 Email - from: Williams, Charles R. to: Lake, Louis, Thomas, George, Dated Sunday, January 17, 2010 9:28 Am, FW: 01-18-10 Containment Repair Prokect Level 3 Schedule, Attachments: 01-18-10 Level 3 Rev D - 11x17.pdf ML1028805132010-01-16016 January 2010 Email - from: Miller, Craig L (Craig.Miller@Pgnmail.Com) to: Lake, Louis; Thomas, George; Carrion, Robert; 'Trowe@Wje.Com'; Sealey, Mac Cc: Williams, Charles R. Dated Saturday, January 16, 2010 1:24 PM, Failure Mode 2.6 for Review .. ML1028805242010-01-16016 January 2010 Email - from: Miller, Craig L (Craig.Miller@Pgnmail.Com) to: Miller, Craig L; Lake, Louis; Thomas, George; Carrion, Robert; 'Trowe@Wje.Com' Cc: Williams, Charles R. Dated Saturday, January 16, 2010 1:15 PM Subject: Failure Mode 5.1 for Revi ML1028709172010-01-14014 January 2010 Email - from: Williams, Charles R. (Charles.Williams@Pgnmail.Com) to: Lake, Louis; Thomas, George Dated Thursday, January 14, 2010 7:16 Am Subject: FW: 01-14-10 Containment Repair Project Level 3 Schedule ML1028709162010-01-14014 January 2010 Email - from: Williams, Charles R. (Charles.Williams@Pgnmail.Com) to Lake, Louis; Thomas, George Dated Thursday, January 14, 2010 3:28 PM Subject: FW: 01-15-10 Containment Repair Project Level 3 Schedule ML1028709202010-01-13013 January 2010 5.1 Contamination During Construction ML1028709262010-01-13013 January 2010 Email - from: Williams, Charles R. to Lake, Louis; Thomas, George (Charles.Williams@Pgnmail.Com) Dated Wednesday, January 13, 2010 10:46 Am Subject: FW: 01-13-10 Containment Repair Project Level 3 Schedule ML1029105832009-12-28028 December 2009 Engg Repair Work Flow 12-28-09.pdf ML1029106132009-12-22022 December 2009 Email-From: Orf, Tracy to Lake, Louis Dated Tuesday, December 22, 2009 6:31 Am Subject:Fw CR3 Updated Root Cause Information Attachments: 2009 Dec 18 - Root Cause Update for Nrc. Pptx ML1027204462009-12-0808 December 2009 3.4 Exhibit 7, Petrographic Report ML1027204522009-12-0303 December 2009 2.2 Exhibit 3, Concrete Pour Data ML1027204452009-12-0303 December 2009 2.11 Concrete Pour Data ML1011708192009-12-0303 December 2009 Root Cause Analysis - PII Metrics as of Dec 3rd 2009 ML1028804872009-11-23023 November 2009 3.1 Inadequate Air Content ML1028711772009-11-23023 November 2009 8.1 and 8.5 ML1029106712009-10-30030 October 2009 2009 Oct 30 - Root Cause Analysis Metrics.Pptx ML1027300782009-01-25025 January 2009 2.5 Exhibit 1, Ambient and Concrete Temp in Buttresses 3-4 ML0728203072007-10-11011 October 2007 Electronic Distribtion Initiative Letter, Licensee List, Electronic Distribution Input Information, Division Plant Mailing Lists ML0529902932005-10-19019 October 2005 FAQ Log 10/19/2005 ML0613806832005-09-30030 September 2005 Operating Revenues Vs. Operating Expenses; Intergovernmental Transfers; Long-Term Debt; General Fuel Mix; Customer Class Composition; Total Retail Sales; Total Energy Sales 3F1104-05, 10CFR50.46 Loss-Of-Coolant Accident Evaluation Model Change and Peak Cladding Temperature Change Report2004-11-17017 November 2004 10CFR50.46 Loss-Of-Coolant Accident Evaluation Model Change and Peak Cladding Temperature Change Report ML0209405042002-04-0303 April 2002 Attachment to Letter Crystal River Unit 3 - Table for OTSG Post-Inspection Phone Call and Drawings 2016-03-11
[Table view] |