MONTHYEARML0202203122002-01-22022 January 2002 Letter, Request for Withholding Information from Public Disclosure for the Safety Analysis Report and Extended Power Uprate (MB2700 and MB2701) Project stage: Withholding Request Acceptance ML0203903742002-01-24024 January 2002 Part 1 of 2, Brunswick Steam Electric Plant, Units 1 & 2, Response to Request for Additional Information Re Request for License Amendments - Extended Power Uprate (NRC Tac Nos. MB2700 & MB2701) Project stage: Response to RAI BSEP 01-0164, Part 2 of 2, Enclosure 3, Brunswick Steam Electric Plant, Units 1 & 2, Response to Request for Additional Information Re Request for License Amendments - Extended Power Uprate (NRC Tac Nos. MB2700 & MB2701)2002-01-24024 January 2002 Part 2 of 2, Enclosure 3, Brunswick Steam Electric Plant, Units 1 & 2, Response to Request for Additional Information Re Request for License Amendments - Extended Power Uprate (NRC Tac Nos. MB2700 & MB2701) Project stage: Response to RAI BSEP 02-0034, Response to Request for Additional Information Re Request for License Amendments - Extended Power Uprate2002-02-0101 February 2002 Response to Request for Additional Information Re Request for License Amendments - Extended Power Uprate Project stage: Response to RAI BSEP 02-0030, Response to Request for Additional Information Regarding Request for License Amendments - Extended Power Uprate2002-02-0404 February 2002 Response to Request for Additional Information Regarding Request for License Amendments - Extended Power Uprate Project stage: Response to RAI ML0203704172002-02-0606 February 2002 Notice of Consideration of Issuance of Amendment to Facility Operating License for Extended Power Uprate and Opportunity for Hearing Project stage: Other BSEP 02-0037, Response to NRC Request for Additional Information Re Request for License Amendments for Extended Power Uprate2002-02-13013 February 2002 Response to NRC Request for Additional Information Re Request for License Amendments for Extended Power Uprate Project stage: Response to RAI BSEP 02-0041, Response to Request for Additional Information, Request for License Amendments for Extended Power Uprate2002-02-14014 February 2002 Response to Request for Additional Information, Request for License Amendments for Extended Power Uprate Project stage: Response to RAI BSEP 02-0038, Response to Request for Additional Information Regarding Request for License Amendments - Extended Power Uprate2002-02-21021 February 2002 Response to Request for Additional Information Regarding Request for License Amendments - Extended Power Uprate Project stage: Response to RAI BSEP 02-0046, Response to Request for Additional Information Re Request for License Amendments - Extended Power Uprate2002-02-21021 February 2002 Response to Request for Additional Information Re Request for License Amendments - Extended Power Uprate Project stage: Response to RAI ML0205400052002-02-22022 February 2002 General Electric Company, Request for Withholding Information from Public Disclosure, RAI 5-13, 5-15, 5-17b and 5-25(a), TAC Nos. MB2700 and MB2701 Project stage: RAI BSEP 02-0042, Response to Request for Additional Information Regarding Request for License Amendments - Extended Power Uprate2002-02-25025 February 2002 Response to Request for Additional Information Regarding Request for License Amendments - Extended Power Uprate Project stage: Response to RAI BSEP 02-0049, Response to Request for Additional Information Regarding Request for License Amendments - Extended Power Uprate2002-02-25025 February 2002 Response to Request for Additional Information Regarding Request for License Amendments - Extended Power Uprate Project stage: Response to RAI BSEP 02-0048, Response to Request for Additional Information Regarding Request for License Amendments - Extended Power Uprate2002-02-25025 February 2002 Response to Request for Additional Information Regarding Request for License Amendments - Extended Power Uprate Project stage: Response to RAI BSEP 02-0054, Response to Request for Additional Information Re Request for License Amendments - Extended Power Uprate (NRC TAC Nos. MB2700 & MB2701)2002-03-0404 March 2002 Response to Request for Additional Information Re Request for License Amendments - Extended Power Uprate (NRC TAC Nos. MB2700 & MB2701) Project stage: Response to RAI BSEP 02-0060, Response to Request for Additional Information Regarding Request for License Amendments - Extended Power Uprate2002-03-0505 March 2002 Response to Request for Additional Information Regarding Request for License Amendments - Extended Power Uprate Project stage: Response to RAI BSEP 02-0061, Response to Request for Additional Information Regarding Request for License Amendments - Extended Power Uprate2002-03-0707 March 2002 Response to Request for Additional Information Regarding Request for License Amendments - Extended Power Uprate Project stage: Response to RAI ML0208007162002-03-12012 March 2002 Response to Request for Additional Information, Request for License Amendments to Extend Power Uprate Project stage: Response to RAI BSEP 02-0064, Revision to Plant Emergency Procedure, Revision 22 to OPEP-04.6, Radiological Emergency Kit Inventories2002-03-14014 March 2002 Revision to Plant Emergency Procedure, Revision 22 to OPEP-04.6, Radiological Emergency Kit Inventories Project stage: Request BSEP 02-0065, Response to Request for Additional Information Re Request for Amendments Re Extended Power Uprate2002-03-14014 March 2002 Response to Request for Additional Information Re Request for Amendments Re Extended Power Uprate Project stage: Response to RAI BSEP 02-0067, Response to Request for Additional Information Regarding Request for License Amendments - Extended Power Uprate2002-03-14014 March 2002 Response to Request for Additional Information Regarding Request for License Amendments - Extended Power Uprate Project stage: Response to RAI BSEP 02-0068, Response to Request for Additional Information Regarding Request for License Amendments - Extended Power Uprate2002-03-20020 March 2002 Response to Request for Additional Information Regarding Request for License Amendments - Extended Power Uprate Project stage: Response to RAI BSEP 02-0070, Additional Information on License Amendments Re Extended Power Uprate2002-03-22022 March 2002 Additional Information on License Amendments Re Extended Power Uprate Project stage: Other BSEP 02-0071, License Condition Support Request for License Amendments Re Extended Power Uprate for Brunswick Steam Electric Plant, Units 1 & 22002-03-25025 March 2002 License Condition Support Request for License Amendments Re Extended Power Uprate for Brunswick Steam Electric Plant, Units 1 & 2 Project stage: Request ML0211303552002-03-29029 March 2002 Draft Safety Evaluation Proposed Extended Power Uprate License Amendments, TAC Nos. MB2700 and MB2701 Project stage: Draft Approval ML0208805092002-03-29029 March 2002 Draft Environmental Assessment and Finding of No Significant Impact Project stage: Draft Other ML0210007332002-04-10010 April 2002 Request for Withholding Information from Public Disclosure Project stage: Withholding Request Acceptance ML0212303182002-04-22022 April 2002 Request for License Amendments, Extended Power Uprate. Includes Typed TS Pages in Support of Requested Amendments Project stage: Request ML0212105202002-04-26026 April 2002 General Electric Co., Request for Withholding Information from Public Disclosure (TACs MB2700 and MB2701) Project stage: Withholding Request Acceptance ML0212106942002-04-26026 April 2002 General Electric Co., Request for Withholding Information from Public Disclosure Letter Dated 03/12/02 Project stage: Withholding Request Acceptance BSEP 02-0091, Response to Request for Additional Information Re Request for License Amendments Re Extended Power Uprate2002-04-26026 April 2002 Response to Request for Additional Information Re Request for License Amendments Re Extended Power Uprate Project stage: Response to RAI BSEP 02-0092, License Condition Supporting 08/09/2001 Request for License Amendments to Extend Power Uprate2002-04-29029 April 2002 License Condition Supporting 08/09/2001 Request for License Amendments to Extend Power Uprate Project stage: Request ML0213506512002-05-14014 May 2002 Environmental Assessment and Finding of No Significant Impact, an Increase in the Maximum Power Level from 2558 Mwt to 2923 Mwt Project stage: Other ML0214901342002-05-31031 May 2002 General Notice - Brunswick Extended Power Uprate Project stage: Other ML0215504252002-05-31031 May 2002 Technical Specification Pages for Amendments 222 and 247 Extended Power Uprate Project stage: Other ML0214403462002-05-31031 May 2002 Non-proprietary Safety Evaluation for Extended Power Uprate Project stage: Approval ML0214305512002-05-31031 May 2002 Issuance of Amendments, Revising TS to Allow an Increase in the Maximum Power Level at Each Unit from 2558 Mwt Thermal to 2923 Mwt Project stage: Approval 2002-03-20
[Table View] |
Text
John S. Keenan SCP&L Vice President A Progress Energy Company Brunswick Nuclear Plant FEB 212tOM SERIAL: BSEP 02-003F TSC-2001-09 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 BRUNSWICK STEAM ELECTRIC PLANT, UNIT NOS. I AND 2 DOCKET NOS. 50-325 AND 50-324/LICENSE NOS. DPR-71 AND DPR-62 RESPONSE TO REQUEST FOR ADDITIONAL INFORMATION REGARDING REQUEST FOR LICENSE AMENDMENTS - EXTENDED POWER UPRATE (NRC TAC NOS. MB2700 AND MB2701)
Ladies and Gentlemen:
On August 9, 2001 (Serial: BSEP 01-0086), Carolina Power & Light (CP&L) Company requested a revision to the Operating Licenses (OLs) and the Technical Specifications for the Brunswick Steam Electric Plant (BSEP), Units 1 and 2. The proposed license amendments increase the maximum power level authorized by Section 2.C.(1) of OLs DPR-71 and DPR-62 from 2558 megawatts thermal (MWt) to 2923 MWt. Subsequently, on January 30, 2002, the NRC provided an electronic version of a Request for Additional Information (RAI) concerning the difference in turbine bypass valve capability of the two BSEP units and how this difference was addressed in the BSEP probabilistic safety analysis of the planned extended power uprate. The response to this RAI is enclosed.
Please refer any questions regarding this submittal to Mr. Leonard R. Belier, Manager - Regulatory Affairs, at (910) 457-2073.
Sincerely, nS. Keenan MAT/mat P. Buox 10429 Southport, NC 28461
> 910.457.2496
> 910.457.2803
Document Control Desk BSEP 02-0038 / Page 2
Enclosure:
Response to Request for Additional Information (RAI) 15 John S. Keenan, having been first duly sworn, did depose and say that the information contained herein is true and correct to the best of his information, knowledge and belief; and the sources of his information are officers, employees, and agents of Carolina Power & Light Company.
Notary (Seal)
My commission expires:
-04 cc:
U. S. Nuclear Regulatory Commission, Region II ATTN: Mr. Luis A. Reyes, Regional Administrator Sam Nunn Atlanta Federal Center 61 Forsyth Street, SW, Suite 23T85 Atlanta, GA 30303-8931 U. S. Nuclear Regulatory Commission ATTN: Mr. Theodore A. Easlick, NRC Senior Resident Inspector 8470 River Road Southport, NC 28461-8869 U. S. Nuclear Regulatory Commission (Electronic Copy Only)
ATTN: Mr. Allen G. Hansen (Mail Stop OWFN 8G9) 11555 Rockville Pike Rockville, MD 20852-2738 U. S. Nuclear Regulatory Commission ATTN: Mr. Mohammed Shuaibi (Mail Stop OWFN 8H4A) 11555 Rockville Pike Rockville, MD 20852-2738 Ms. Jo A. Sanford Chair - North Carolina Utilities Commission P.O. Box 29510 Raleigh, NC 27626-0510
.Mr. Mel Fry Director - Division of Radiation Protection North Carolina Department of Environment and Natural Resources 3825 Barrett Drive Raleigh, NC 27609-7221
BSEP 02-0038 Enclosure Page 1 of 2 ENCLOSURE BRUNSWICK STEAM ELECTRIC PLANT, UNIT NOS. 1 AND 2 DOCKET NOS. 50-325 AND 50-324/LICENSE NOS. DPR-71 AND DPR-62 RESPONSE TO REQUEST FOR ADDITIONAL INFORMATION REGARDING REQUEST FOR LICENSE AMENDMENTS - EXTENDED POWER UPRATE (NRC TAC NOS. MB2700 AND MB2701)
Response to Request for Additional Information (RAI) 15
Background
On August 9, 2001 (Serial: BSEP 01-0086), Carolina Power & Light (CP&L) Company requested a revision to the Operating Licenses (OLs) and the Technical Specifications for the Brunswick Steam Electric Plant (BSEP), Units 1 and 2. The proposed license amendments increase the maximum power level authorized by Section 2.C.(1) of OLs DPR-71 and DPR-62 from 2558 megawatts thermal (MWt) to 2923 MWt. Subsequently, on January 30, 2002, the NRC provided an electronic version of a Request for Additional Information (RAI) concerning the difference in turbine bypass valve capability of the two BSEP units and how this difference was addressed in the BSEP probabilistic safety analysis (PSA) of the planned extended power uprate (EPU). The response to this RAI follows.
NRC Ouestion 15-1 The EPU PRA evaluation was based on Unit 2, with the argument that the two units are essentially identical. However, one area in which the two units are not similar is in the turbine bypass valve (TBV) capacity. With the increased power level, the Unit 2 capability will clearly remain acceptable and its success criteria, even if it increased in the number of TBVs needed, would not appreciably affect the results due to the numerous TBVs (10). However, the Unit 1 TBV capability may become marginal or even inadequate at the EPU conditions since there are fewer TBVs (4), which are also smaller than the Unit 2 TBVs. Has the TBV capacity (i.e.,
success criteria) at Unit 1 been confirmed to remain acceptable at EPU conditions? If not, the licensee should evaluate the success criteria for the TBVs at Unit 1 to assure the staff that this difference in the units has been properly evaluated. One approach that may be acceptable would be to perform a sensitivity calculation in which the TBV condenser cooling (i.e., steam dumping) function is defeated in the EPU model and the change in risk (i.e., CDF and LERF) due to this change is presented to the staff and shown to be acceptable per RG 1.174. Finally, if there are any other major success criteria differences between Unit 1 and Unit 2, these differences need to be presented to the staff and shown to either be unaffected by the EPU or the evaluation reflecting these differences provided.
BSEP 02-0038 Enclosure Page 2 of 2 Response to Question 15-1 The impact of EPU conditions on Unit 1 turbine bypass valve (TBV) capability has been previously evaluated and it was concluded that, while a reduction of the relative steam bypass capacity for each unit would occur, the Pressure Control System (PCS) remains able to perform its design function under EPU conditions.
As a result of EPU, the turbine bypass capacity will be reduced from 23.79% to 20.6% for Unit 1 and from 80.26% to 69.6% for Unit 2. These relative changes are small and do not impact the success criteria in the BSEP Unit 1 PSA analysis, which requires the opening of all four turbine bypass valves. It should be noted that the PSA assumes the same bypass requirements for both units, however the success criteria for Unit 2 reflects the larger number of bypass valves available. Section 4.1.2.3 of Enclosure 2 to CP&L's response to RAI 6, (i.e., BSEP 01-0141, dated November 30, 2001) provides further discussion of the systemic success criteria.
Since the percent change in turbine bypass capacity is relatively small and does not impact the success criteria or accident sequences modeling in the PSA, no model sensitivity calculation is necessary.
There are no other significant success criteria in the BSEP PSA model that relate to differences between Unitl and Unit 2. While some minor differences exist between the units (e.g., an alternate pump may be powered by Division I AC power versus Division II AC power and slightly different location of equipment as in the Control Rod Drive pumps), these differences have a negligible impact on the risk profile.