Letter Sequence Approval |
---|
|
|
MONTHYEARML0206700042002-03-0101 March 2002 TS Page for Palo Verde, Units 1, 2, & 3-Issuance of Amds. 139 (Tacs. MB2955, 56, 57) on Shutdown Cooling and Coolant Circulation Project stage: Approval ML0202202242002-03-0101 March 2002 Issuance of Amendments on Shutdown Cooling and Coolant Circulation (Tac Nos. MB2955, MB2956, and MB2957) Project stage: Approval 2002-03-01
[Table View] |
|
---|
Category:Letter
MONTHYEARML24295A0362024-10-23023 October 2024 Regulatory Audit Plan in Support of Relief Request No. 71; Resubmittal of Relief Request-30 IR 05000528/20244022024-10-22022 October 2024 Security Baseline Inspection Report 05000528/2024402 and 05000529/2024402 and 05000530/2024402 ML24296B2142024-10-22022 October 2024 Transmittal of Valve Relief Request (VRR) - 02: Alternative Request Allowing Normally Closed Valves with a Safety Function to Close to Be Exercise Tested Once Per Refueling Cycle ML24296B2152024-10-22022 October 2024 Transmittal of Valve Relief Request (VRR) - 03: Alternative Request Allowing Removal of the Lower Acceptance Criteria Threshold from Solenoid-Operated Valves ML24296B2172024-10-18018 October 2024 Submittal of Unit 1 Core Operating Limits Report, Revision 34, Unit 2 Core Operating Limits Report, Revision 26, and Unit 3 Core Operating Limits Report, Revision 3 ML24292A2192024-10-18018 October 2024 Core Operating Limits Report Revision 34, 26 and 33 ML24292A0322024-10-17017 October 2024 Th Refueling Outage Steam Generator Tube Inspection Report ML24285A2562024-10-11011 October 2024 License Renewal - Alloy 600 Management Program Plan Response to Request for Additional Information IR 07200044/20244012024-10-0808 October 2024 Independent Spent Fuel Storage Installation Security Inspection Report 07200044/2024401 ML24269A1542024-09-27027 September 2024 Summary of Presubmittal Meeting with Arizona Public Service Company to Discuss Proposed Life-of-Plant Alternatives for a Pressurizer Thermowell Nozzle Repair at Palo Verde Nuclear Generating Station, Unit 1 ML24262A0972024-09-23023 September 2024 Notification of Post-Approval Site Inspection for License Renewal and Request for Information Inspection (05000529/2024011) ML24241A2542024-08-28028 August 2024 Inservice Inspection Request for Information ML24241A2782024-08-28028 August 2024 License Amendment Request to Revise the Technical Specifications 3.5.1 and 3.5.2 Safety Injection Tank Pressure Bands, and to Use GOTHIC Code ML24240A2682024-08-27027 August 2024 Transmittal of Technical Specification Bases Revision 79 IR 05000528/20240052024-08-22022 August 2024 Updated Inspection Plan for Palo Verde Nuclear Generating Station - Units 1, 2, and 3 (Report 05000528/2024005, 05000529/2024005, 05000530/2024005) 05000530/LER-2024-001-01, Inoperable Boron Dilution Alarm System(Bdas) with Technical Specification Violation2024-08-21021 August 2024 Inoperable Boron Dilution Alarm System(Bdas) with Technical Specification Violation ML24208A0612024-08-20020 August 2024 Issuance of Amendment Nos. 224, 224, and 224 Regarding Revision to Technical Specifications 3.5.1, 3.5.2 and 3.6.5 IR 05000528/20244042024-08-0808 August 2024 Cybersecurity Inspection Report 05000528/2024404, 05000529/2024404 and 05000530/2024404 ML24213A3232024-07-31031 July 2024 Transmittal of Relief Request (RR) No. 71: Re-Submittal of RR-30 ML24213A3292024-07-31031 July 2024 Transmittal of Relief Request (RR) No. 72: Re-Submittal of RR-39 IR 05000528/20240022024-07-29029 July 2024 Integrated Inspection Report 05000528/2024002 and 05000529/2024002 and 05000530/2024002 ML24173A3302024-07-24024 July 2024 Pressurizer Surge Line Inspection Program ML24159A4702024-07-17017 July 2024 Issuance of Amendment Nos. 223, 223, and 223 Revision to Technical Specifications 3.5.1 and 3.5.2 Using Risk Informed Process for Evaluations ML24198A0662024-07-16016 July 2024 Program Review - Simulator Testing Methodology ML24193A3442024-07-11011 July 2024 Fourth 10-Year Interval, Second Period Owner’S Activity Report Number 3R24 ML24129A0522024-07-0303 July 2024 Review of the Spring 2023 Steam Generator Tube Inspection Report IR 05000528/20240042024-06-25025 June 2024 Notification of Inspection (NRC Inspection Report 05000528/2024004, 05000529/2024004, 05000530/2024004) 05000530/LER-2024-002, Invalid Specified System Actuation of Train B Emergency Diesel Generator2024-06-25025 June 2024 Invalid Specified System Actuation of Train B Emergency Diesel Generator ML24177A3212024-06-25025 June 2024 Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Transportable Storage Canisters Identification Numbers AMZDFX180, AMZDFX181, AMZDFX182 Vertical Concrete Cask Identification Nu ML24177A3222024-06-25025 June 2024 Invalid Specified System Actuation of Train B Emergency Diesel Generator ML24170A9962024-06-18018 June 2024 Response to Second Request for Additional Information to Revise Technical Specifications (TS) 3.5.1, Safety Injection Tanks (Sits) – Operating, TS 3.5.2, Safety Injection Tanks (Sits) – Shutdown a ML24129A2062024-06-14014 June 2024 Issuance of Amendment Nos. 222, 222, and 222 Revision to Technical Specifications to Adopt TSTF-266-A 05000530/LER-2024-001, Inoperable Boron Dilution Alarm System(Bdas) with Technical Specification Violation2024-06-0505 June 2024 Inoperable Boron Dilution Alarm System(Bdas) with Technical Specification Violation ML24159A0262024-06-0303 June 2024 Annual Report of Guarantee of Payment of Deferred Premium 05000529/LER-2024-001, Valid Specified System Actuations of Unit 2 Train B Emergency Diesel Generator and Train B Auxiliary Feedwater2024-05-23023 May 2024 Valid Specified System Actuations of Unit 2 Train B Emergency Diesel Generator and Train B Auxiliary Feedwater ML24135A2482024-05-14014 May 2024 Response to Second Request for Additional Information to Proposed Method to Manage Environmentally Assisted Fatigue for the Pressurizer Surge Line ML24164A2582024-05-0909 May 2024 10-PV-2024-04 Post-Exam Comments ML24129A1482024-05-0707 May 2024 And Independent Spent Fuel Storage Installation Registration of Dry Spent Fuel Storage Casks with Applied Changes ML24128A2702024-05-0707 May 2024 Docket Nos. Stn 50-528/529/530 - Response to NRC Regulatory Issue Summary (RIS) 2024-01, Preparation and Scheduling of Operator Licensing Examinations IR 05000528/20240012024-05-0202 May 2024 Independent Spent Fuel Storage Installation, Integrated Inspection Report 05000528/2024001, 05000529/2024001, 05000530/2024001, 07200044/2024001, and Exercise of Enforcement Discretion ML24119A0022024-04-26026 April 2024 2023 Annual Environmental Operating Report ML24116A2082024-04-24024 April 2024 Independent Spent Fuel Storage Installation, Annual Radioactive Effluent Release Report 2023 ML24109A0712024-04-22022 April 2024 NRC Initial Operator Licensing Examination Approval 05000528/2024301, 05000529/2024301, and 05000530/2024301 IR 05000528/20244012024-04-22022 April 2024 Security Baseline Inspection Report 05000528/2024401 and 05000529/2024401 and 05000530/2024401 (Cover Letter) ML24112A0012024-04-19019 April 2024 Core Operating Limits Report, Revision 32 ML24108A1982024-04-16016 April 2024 Independent Spent Fuel Storage Installation - Registration of Dry Spent Fuel Storage Casks with Applied Changes Authorized by an Amended Certificate of Compliance ML24103A2482024-04-12012 April 2024 Emergency Core Cooling System Performance Evaluation Models, 10 CFR 50.46(a)(3)(ii) Annual Report for 2023 ML24131A0972024-04-10010 April 2024 Annual Radiological Environmental Operating Report 2023 ML24096A2202024-04-0505 April 2024 Transmittal of Technical Specification Bases Revision 78 ML24032A1542024-04-0303 April 2024 Exemption from Select Requirements of 10 CFR Part 73 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting) 2024-09-27
[Table view] Category:License-Operating (New/Renewal/Amendments) DKT 50
MONTHYEARML24208A0612024-08-20020 August 2024 Issuance of Amendment Nos. 224, 224, and 224 Regarding Revision to Technical Specifications 3.5.1, 3.5.2 and 3.6.5 ML24159A4702024-07-17017 July 2024 Issuance of Amendment Nos. 223, 223, and 223 Revision to Technical Specifications 3.5.1 and 3.5.2 Using Risk Informed Process for Evaluations ML23258A1402023-09-27027 September 2023 Summary of August 31, 2023, Presubmittal Meeting with Arizona Public Service Company to Discuss Planned Submittal of License Renewal Commitment Regarding Alloy 600 Management Program Plan at Palo Verde Station, Units 1, 2, & 3 ML23199A2942023-08-0909 August 2023 Issuance of Amendment Nos. 221, 221, and 221, to Revise Technical Specifications to Adopt TSTF-107, Separate Control Rods That Are Untrippable Versus Inoperable ML22334A0702022-12-15015 December 2022 Issuance of Amendment Nos. 220, 220, and 220, to Revise Technical Specifications to Adopt TSTF-487, Relocate DNB Parameters to the COLR ML22178A0042022-08-11011 August 2022 Issuance of Amendment Nos. 219, 219, and 219, to Revise Technical Specifications to Adopt TSTF-567, Add Containment Sump Ts to Address GSI-191 Issues ML21347A0032021-12-22022 December 2021 Issuance of Amendment Nos. 217, 217, and 217 Regarding Permanent Extension of Type a and Type C Leak Rate Test Frequencies ML21347A9522021-12-14014 December 2021 Summary of December 9, 2021, Public Meeting with Arizona Public Service Company to Discuss Upcoming LAR to Adopt TSTF-567, Add Containment TS to Address GSI-191 Issues for Palo Verde Nuclear Generating Station, Units 1, 2, and 3 ML21225A0932021-08-17017 August 2021 Ng Station, Units 1, 2,& 3 - Issuance of Amendment Nos. 216, 216, and 216 Regarding Revision to Technical Specifications to Adopt TSTF-501, Rev.1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control ML21105A3402021-04-21021 April 2021 Issuance of Amendment Nos. 215, 215, and 215 Revision to Technical Specifications to Adopt TSTF-563, Revision 0 ML20350B8032021-02-0808 February 2021 Issuance of Amendment Nos. 214, 214, and 214 to Make Administrative Changes to the Technical Specifications ML20163A0372020-07-31031 July 2020 the Independent Spent Fuel Storage Installation - Issuance of Amendment Nos. 213, 213, and 213 to Revise Emergency Plan Staff Augmentation Times ML20031C9472020-03-0404 March 2020 Nonproprietary, Issuance of Amendment Nos. 212, 212, and 212 to Revise Technical Specifications to Support the Implementation of Framatome High Thermal Performance Fuel ML20016A4582020-02-10010 February 2020 Issuance of Amendment Nos. 211, 211, 211, to Extend Implementation Date for Amendment Nos. 209, 209, and 209 Associated W/Initiative 4b That Permit the Use of Risk-Informed Completion Times on the TS ML19309F3042019-12-18018 December 2019 Issuance of Amendment Nos. 210, 210, and 210, to Revise Technical Specifications to Adopt Traveler TSTF-529, Revision 4,Clarify Use and Application ML19235A2562019-09-0909 September 2019 Regulatory Audit Summary for the June 17-20, 2019, Audit for the License Amendment and Exemption Requests Associated with Framatome High Thermal Performance Fuel ML19085A5252019-05-29029 May 2019 Issuance of Amendments Nos. 209, 209, and 209 - Regarding Adoption of Risk Informed Completion Times in Technical Specifications (CAC Nos. MF6576, MF6577, and MF6578; EPID L-2015-LLA-0001) ML19070A2182019-04-0303 April 2019 Issuance of Amendment Nos. 208, 208, and 208 - Regarding Response Time Testing of Pressure Transmitters ML18243A2802018-10-10010 October 2018 Issuance of Amendment Nos. 207, 207, and 207 to Adopt 10 CFR 50.69 (CAC Nos. MF9971, MF9972, and MF9973; EPID L-2017-LLA-0276) ML17254A4992017-09-27027 September 2017 Issuance of Amendment Nos. 204, 204, and 204 to Modify the Completion Date for Implementation of Milestone 8 of the Cyber Security Plan ML17188A4122017-07-28028 July 2017 Palo Verde Nuclear Generating Station, Units 1, 2, and 3 - Issuance of Amendment Nos. 203, 203, and 203 to Revise Technical Specifications to Incorporate Updated Criticality Safety Analysis (CAC Nos. MF7138, MF7139, and MF7140) ML17123A4352017-05-16016 May 2017 Issuance of Amendment Nos. 202, 202, and 202 to Revise Technical Specifications to Adopt TSTF-523, Generic Letter 2008-01, Managing Gas Accumulation ML17090A1642017-04-27027 April 2017 Issuance of Amendment No. 201, 201, and 201 to Revise Technical Specifications Related to Degraded and Loss of Voltage Relay Modifications ML17004A0202017-01-0404 January 2017 Issuance of Amendment No. 200, Revise Technical Specification 3.8.1, AC Sources - Operating, for One-Time Extension of the Diesel Generator Completion Time, Risk-Informed (Emergency Circumstances) ML16358A6762016-12-23023 December 2016 Issuance of Amendment No. 199, Request for One-Time Extension of the Diesel Generator Completion Time (Emergency Circumstances) ML16180A1092016-09-0808 September 2016 Issuance of Amendment Nos. 198, 198, and 198, Adopt Emergency Action Level Scheme Pursuant to Nuclear Energy Institute 99-01, Revision 6, Development of Emergency Action Levels for Non-Passive Reactors. ML16004A0132016-02-19019 February 2016 Issuance of Amendment No. 197, 197, and 197, Adopt Technical Specification Task Force Traveler TSTF-439-A, Revision 2, Eliminate Second Completion Times Limiting Time from Discovery of Failure to Meet an LCO ML15266A0052015-09-25025 September 2015 Issuance of Amendment No. 196, Revise Technical Specification Surveillance Requirement 3.1.5.3 for Control Element Assembly 88 for the Remainder of Cycle 19 (Exigent Circumstances) ML15070A1242015-03-30030 March 2015 Issuance of Amendment Nos. 195, 195, and 195, Adopt TSTF-486, Revision 2, Revise Mtc Surveillance for Startup Test Activity Reduction (STAR) Program (WCAP-16011) and TSTF-406, Revision 2 ML14202A3782014-09-0909 September 2014 Issuance of Amendment Nos. 194, 194, and 194, Request to Revise TS 3.3.3, Control Element Assembly Calculators and TS 3.3.6, Engineered Safety Features Actuation System (ESFAS) Logic and Manual Trip (TAC Nos. MF2879-81) ML14115A0452014-06-25025 June 2014 Issuance of Amendment Nos. 193, 193, and 193, Adopt Technical Specification Task Force (TSTF)-500, Revision 2, DC Electrical Rewrite - Update to TSTF-360 ML13294A5762013-11-25025 November 2013 Issuance of Amendment Nos. 192, 192, and 192, Adopt TSTF-490, Revision 0, Deletion of E-Bar Definition and Revision to RCS Specific Activity Technical Specifications ML13080A3312013-04-11011 April 2013 Issuance of Amendment Nos. 191, 191, and 191, Revise Technical Specification 3.7.4, Atmospheric Dump Valves (Advs) ML12312A1902012-12-13013 December 2012 Redacted Version, Issuance of Amendment No. 190, 190, and 190, Revise Physical Protection License Condition Related to Cyber Security Plan Implementation Milestone 6 and 7 IR 05000529/20110012012-06-18018 June 2012 Issuance of Amendment Nos. 189, 189, and 189, Modify Technical Specifications to Implement Administrative Changes Including Corrective Actions from U2 Event in LER 50-529/2011-001 (TAC Nos. ME7621, ME7622 & ME7623) ML1126202932011-12-15015 December 2011 Issuance of Amendment Nos. 188, 188, and 188, Adoption of TSTF-425, Rev. 3, Relocate Surveillance Frequencies to Licensee Control - Risk Informed Technical Specification Task Force (RITSTF) Initiative 5b ML1118805242011-08-31031 August 2011 Issuance of Amendment Nos. 187, 187, and 187, Revise Updated Final Safety Analysis Report, Feedwater Line Break Analysis with LOOP and Single Failure Analysis ML1118103382011-07-28028 July 2011 Issuance of Amendment Nos. 186, 186, and 186, Revise Updated Final Safety Analysis Report to Change Methodology for Steam Generator Tube Rupture Accidents ML1117101102011-07-26026 July 2011 Issuance of Amendment Nos. 185, 185, and 185, Revise License Condition and Approval of Cyber Security Plan and Associated Implementation Schedule ML0531100452011-04-21021 April 2011 Current Facility Operating License NPF-41, Tech Specs, Revised 09/28/2017 ML1108004652011-04-21021 April 2011 Renewed Facility Operating License Number NPF-51 for Unit 2 ML1108004612011-04-21021 April 2011 Renewed Facility Operating License Number NPF-41 for Unit 1 ML1108004552011-04-21021 April 2011 Issuance of Renewed Facility Operating Licenses for Palo Verde Nuclear Generating Station (TAC Numbers ME0254, ME0255, and ME0256) ML1108004732011-04-21021 April 2011 Renewed Facility Operating License Number NPF-74 for Unit 3 ML1027103012010-11-24024 November 2010 Issuance of Amendment Nos. 182, 182, and 182, Revise TS Table 3.3.5-1, Engineered Safety Features Actuation System, and Figure 3.5-1, Minimum Refueling Water Tank Volume ML1012602112010-09-10010 September 2010 Issuance of Amendment Nos. 179, 179, and 179, Revise License Condition for Maximum Power Level and Miscellaneous Technical Specification Changes ML0927106092009-09-30030 September 2009 Issuance of Amendment Nos. 175, 175, and 175, Modify Technical Specifications to Adopt TSTF-511, Eliminate Working Hour Restrictions from TS 5.2.2 to Support Compliance with 10 CFR Part 26 (TAC Nos. ME1552 to ME1554) ML0900607792009-01-23023 January 2009 Issuance of Amendment Nos. 171, 171, and 171, Adoption of TSTF-448, Revision 3, Revise TS 3.7.11, Control Room Essential Filtration System, and Add New TS 5.5.17, CRE Habitability Program ML0814102252008-05-30030 May 2008 Amendments 170, 170, and 170, Modify Technical Specifications Consistent with TSTF-372, Revision 4, Addition of LCO 3.0.8, Inoperability of Snubbers ML0721200612007-08-0202 August 2007 Revised Pages of Facility Operating License NPF-41, NPF-51 and NPF-74 2024-08-20
[Table view] Category:Safety Evaluation
MONTHYEARML24208A0612024-08-20020 August 2024 Issuance of Amendment Nos. 224, 224, and 224 Regarding Revision to Technical Specifications 3.5.1, 3.5.2 and 3.6.5 ML24173A3302024-07-24024 July 2024 Pressurizer Surge Line Inspection Program ML24159A4702024-07-17017 July 2024 Issuance of Amendment Nos. 223, 223, and 223 Revision to Technical Specifications 3.5.1 and 3.5.2 Using Risk Informed Process for Evaluations ML24129A2062024-06-14014 June 2024 Issuance of Amendment Nos. 222, 222, and 222 Revision to Technical Specifications to Adopt TSTF-266-A ML23241B0182023-09-13013 September 2023 – Use of Honeywell Mururoa V4F1 and MTH2 Supplied Air Suits within Respiratory Protection Program ML23199A2942023-08-0909 August 2023 Issuance of Amendment Nos. 221, 221, and 221, to Revise Technical Specifications to Adopt TSTF-107, Separate Control Rods That Are Untrippable Versus Inoperable ML22334A0702022-12-15015 December 2022 Issuance of Amendment Nos. 220, 220, and 220, to Revise Technical Specifications to Adopt TSTF-487, Relocate DNB Parameters to the COLR ML22178A0042022-08-11011 August 2022 Issuance of Amendment Nos. 219, 219, and 219, to Revise Technical Specifications to Adopt TSTF-567, Add Containment Sump Ts to Address GSI-191 Issues ML22049A0572022-02-23023 February 2022 Relief Request 69 to Extend Inservice Inspection of Containment Tendon by Four Months Due to the Covid 19 Pandemic (EPID L 2022 Llr 0011 (Covid 19)) ML21347A0032021-12-22022 December 2021 Issuance of Amendment Nos. 217, 217, and 217 Regarding Permanent Extension of Type a and Type C Leak Rate Test Frequencies ML21307A1312021-11-17017 November 2021 The Independent Spent Fuel Storage Installation - Order Approving Transfers of Control of Licenses for Minority Interests Subject to Expiring Leases (EPID L-2021-LLM-0003) (Letter) ML21225A0932021-08-17017 August 2021 Ng Station, Units 1, 2,& 3 - Issuance of Amendment Nos. 216, 216, and 216 Regarding Revision to Technical Specifications to Adopt TSTF-501, Rev.1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control ML21118B0282021-05-25025 May 2021 Letter/Se Approving Indirect Transfer of Licenses for Units 1, 2, and 3, and the Independent Spent Fuel Storage Installation ML21105A3402021-04-21021 April 2021 Issuance of Amendment Nos. 215, 215, and 215 Revision to Technical Specifications to Adopt TSTF-563, Revision 0 ML21089A0102021-04-0202 April 2021 Relief Request 66 to Defer Inservice Inspection of Containment Tendon by One Year Due to Covid-19 Pandemic ML20350B8032021-02-0808 February 2021 Issuance of Amendment Nos. 214, 214, and 214 to Make Administrative Changes to the Technical Specifications ML20216A5392020-08-0606 August 2020 Relief Request 65 for Inspection of Reactor Pressure Vessel Bottom Mounted Instrument Nozzles and Pressurizer Surge Line Weld Overlay ML20163A0372020-07-31031 July 2020 the Independent Spent Fuel Storage Installation - Issuance of Amendment Nos. 213, 213, and 213 to Revise Emergency Plan Staff Augmentation Times ML20114E3252020-04-30030 April 2020 Relief Request 64 for Impractical Examinations for the Third 10-Year Inservice Inspection Interval ML20031C9472020-03-0404 March 2020 Nonproprietary, Issuance of Amendment Nos. 212, 212, and 212 to Revise Technical Specifications to Support the Implementation of Framatome High Thermal Performance Fuel ML20016A4582020-02-10010 February 2020 Issuance of Amendment Nos. 211, 211, 211, to Extend Implementation Date for Amendment Nos. 209, 209, and 209 Associated W/Initiative 4b That Permit the Use of Risk-Informed Completion Times on the TS ML19309F3042019-12-18018 December 2019 Issuance of Amendment Nos. 210, 210, and 210, to Revise Technical Specifications to Adopt Traveler TSTF-529, Revision 4,Clarify Use and Application ML19304C5622019-11-0505 November 2019 Safety Evaluation - Arizona Public Service Company - Palo Verde Nuclear Generating Station - License Amendment Request to Adopt TSTF-529 ML19085A5252019-05-29029 May 2019 Issuance of Amendments Nos. 209, 209, and 209 - Regarding Adoption of Risk Informed Completion Times in Technical Specifications (CAC Nos. MF6576, MF6577, and MF6578; EPID L-2015-LLA-0001) ML19107A3722019-04-19019 April 2019 Relief Request 62 Regarding Proposed Alternative Pressurizer Heater Sleeve Repairs ML19070A2182019-04-0303 April 2019 Issuance of Amendment Nos. 208, 208, and 208 - Regarding Response Time Testing of Pressure Transmitters ML19044A6412019-02-19019 February 2019 Relief Request No. 58 for the Third 10-Year Inservice Inspection Interval, Request for Relief from the American Society of Mechanical Engineers for Certain Class 1 and Class 2 Welds ML19037A0552019-02-19019 February 2019 Relief Requests 60 & 61 for the Fourth 10-Year Inservice Inspection Interval, Request for Relief from the American Society of Mechanical Engineers Half-Nozzle Repairs (EPID L-2018-LLR-0111 & EPID L-2018-LLR-0112) ML18285A0292018-10-19019 October 2018 Relief Request 59 for the Deferral of Reactor Vessel Beltline Region Interior Attachment Examinations ML18243A2802018-10-10010 October 2018 Issuance of Amendment Nos. 207, 207, and 207 to Adopt 10 CFR 50.69 (CAC Nos. MF9971, MF9972, and MF9973; EPID L-2017-LLA-0276) ML17254A4992017-09-27027 September 2017 Issuance of Amendment Nos. 204, 204, and 204 to Modify the Completion Date for Implementation of Milestone 8 of the Cyber Security Plan ML17188A4122017-07-28028 July 2017 Palo Verde Nuclear Generating Station, Units 1, 2, and 3 - Issuance of Amendment Nos. 203, 203, and 203 to Revise Technical Specifications to Incorporate Updated Criticality Safety Analysis (CAC Nos. MF7138, MF7139, and MF7140) ML17123A4352017-05-16016 May 2017 Issuance of Amendment Nos. 202, 202, and 202 to Revise Technical Specifications to Adopt TSTF-523, Generic Letter 2008-01, Managing Gas Accumulation ML17090A1642017-04-27027 April 2017 Issuance of Amendment No. 201, 201, and 201 to Revise Technical Specifications Related to Degraded and Loss of Voltage Relay Modifications ML17074A2092017-03-16016 March 2017 Relief Request GRR-01 to ASME Code Case OMN-20 for Third 10-Year Interval Pump and Valve Inservice Testing Program ML17004A0202017-01-0404 January 2017 Issuance of Amendment No. 200, Revise Technical Specification 3.8.1, AC Sources - Operating, for One-Time Extension of the Diesel Generator Completion Time, Risk-Informed (Emergency Circumstances) ML17004A2092017-01-0303 January 2017 Safety Evaluation Input for Palo Verde Nuclear Generating Station, Unit 3, Llcense Amendment Request for a One-Time Extension of the 3B Emergency Diesel Generator Completion Time ML17003A0832017-01-0303 January 2017 Safety Evaluation Input Regarding Changes to Technical Specifications for One-Time Extension of Completion Time for Emergency Diesel Generator ML17003A3892017-01-0303 January 2017 Safety Evaluation Input Regarding the Palo Verde Nuclear Generating Station Unit 3 Emergency Request to Extend Diesel Generator 3B Completion Time ML16358A4152016-12-23023 December 2016 Technical Specifications for One-Time Extension of Completion Time for Emergency Diesel Generator ML16358A6762016-12-23023 December 2016 Issuance of Amendment No. 199, Request for One-Time Extension of the Diesel Generator Completion Time (Emergency Circumstances) ML16180A1092016-09-0808 September 2016 Issuance of Amendment Nos. 198, 198, and 198, Adopt Emergency Action Level Scheme Pursuant to Nuclear Energy Institute 99-01, Revision 6, Development of Emergency Action Levels for Non-Passive Reactors. ML16194A3232016-07-22022 July 2016 Review and Approval of Request for Quality Assurance Plan Change Per Nuclear Energy Institute (NEI) 11-04A, Nuclear Generation Quality Assurance Program Description ML16088A2612016-07-20020 July 2016 Safety Evaluation Regarding Implementation of Mitigating Strategies and Reliable Spent Fuel Pool Instrumentation Related to Orders EA-12-049 and EA-12-051 ML16172A0382016-06-23023 June 2016 Relief Request 54 to Approve an Alternative to Flaw Removal for Reactor Coolant Pump 2A Suction Pressure Instrument Nozzle, for the Third 10-Year Inservice Inspection Interval ML16004A0132016-02-19019 February 2016 Issuance of Amendment No. 197, 197, and 197, Adopt Technical Specification Task Force Traveler TSTF-439-A, Revision 2, Eliminate Second Completion Times Limiting Time from Discovery of Failure to Meet an LCO ML15266A0052015-09-25025 September 2015 Issuance of Amendment No. 196, Revise Technical Specification Surveillance Requirement 3.1.5.3 for Control Element Assembly 88 for the Remainder of Cycle 19 (Exigent Circumstances) ML15238B6612015-09-15015 September 2015 Relief Request 53, Alternative to ASME Code Section XI Requirements Related to Flaw Removal ML15070A1242015-03-30030 March 2015 Issuance of Amendment Nos. 195, 195, and 195, Adopt TSTF-486, Revision 2, Revise Mtc Surveillance for Startup Test Activity Reduction (STAR) Program (WCAP-16011) and TSTF-406, Revision 2 ML15079A0062015-03-30030 March 2015 Relief Request 52 - Request for Approval of Alternate to Flaw Removal, Flaw Characterization and Successive Examinations, for the Remainder of Its Useful Life 2024-08-20
[Table view] |
Text
March 1, 2002 Mr. Gregg R. Overbeck Senior Vice President, Nuclear Arizona Public Service Company P. O. Box 52034 Phoenix, AZ 85072-2034
SUBJECT:
PALO VERDE NUCLEAR GENERATING STATION, UNITS 1, 2, AND 3 -
ISSUANCE OF AMENDMENTS ON SHUTDOWN COOLING AND COOLANT CIRCULATION (TAC NOS. MB2955, MB2956, AND MB2957)
Dear Mr. Overbeck:
The Commission has issued the enclosed Amendment No. 139 to Facility Operating License No. NPF-41, Amendment No. 139 to Facility Operating License No. NPF-51, and Amendment No. 139 to Facility Operating License No. NPF-74 for the Palo Verde Nuclear Generating Station, Units 1, 2, and 3, respectively. The amendments consist of changes to the Technical Specifications (TS) in response to your application dated September 11, 2001.
The amendments revise TS 3.9.5 to allow the non-operating shutdown cooling loop to be declared inoperable for a period up to 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> for surveillance testing in MODE 6. The change is based on Technical Specification Task Force Traveler number 361, Revision 2.
A copy of the related Safety Evaluation is also enclosed. The Notice of Issuance will be included in the Commission's next biweekly Federal Register notice.
Sincerely,
/RA/
Jack Donohew, Senior Project Manager, Section 2 Project Directorate IV Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket Nos. STN 50-528, STN 50-529, and STN 50-530
Enclosures:
- 1. Amendment No. 139 to NPF-41
- 2. Amendment No. 139 to NPF-51
- 3. Amendment No. 139 to NPF-74
- 4. Safety Evaluation cc w/encls: See next page
March 1, 2002 Mr. Gregg R. Overbeck Senior Vice President, Nuclear Arizona Public Service Company P. O. Box 52034 Phoenix, AZ 85072-2034
SUBJECT:
PALO VERDE NUCLEAR GENERATING STATION, UNITS 1, 2, AND 3 -
ISSUANCE OF AMENDMENTS ON SHUTDOWN COOLING AND COOLANT CIRCULATION (TAC NOS. MB2955, MB2956, AND MB2957)
Dear Mr. Overbeck:
The Commission has issued the enclosed Amendment No. 139 to Facility Operating License No. NPF-41, Amendment No. 139 to Facility Operating License No. NPF-51, and Amendment No. 139 to Facility Operating License No. NPF-74 for the Palo Verde Nuclear Generating Station, Units 1, 2, and 3, respectively. The amendments consist of changes to the Technical Specifications (TS) in response to your application dated September 11, 2001.
The amendments revise TS 3.9.5 to allow the non-operating shutdown cooling loop to be declared inoperable for a period up to 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> for surveillance testing in MODE 6. The change is based on Technical Specification Task Force Traveler number 361, Revision 2.
A copy of the related Safety Evaluation is also enclosed. The Notice of Issuance will be included in the Commission's next biweekly Federal Register notice.
Sincerely,
/RA/
Jack Donohew, Senior Project Manager, Section 2 Project Directorate IV Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket Nos. STN 50-528, STN 50-529, and STN 50-530
Enclosures:
- 1. Amendment No. 139 to NPF-41
- 2. Amendment No. 139 to NPF-51
- 3. Amendment No. 139 to NPF-74
- 4. Safety Evaluation cc w/encls: See next page DISTRIBUTION PUBLIC RidsNrrDripRorp (R.Dennig)
PDIV-2 r/f RidsAcrsAcnwMailCenter G. Hill (6) RidsOgcRp RidsNrrDlpmLpdiv (S.Richards) RidsRgn4MailCenter (L. Smith, L. Hurley, D. Bujol)
RidsNrrPMJDonohew A. Chu RidsNrrLAMMcAllister
- RTSB SE memo dated 12/17/2001 (ML013510453) ** See previous concurrence ACCESSION NO: ML020220224 TS: ML020670004 PKG: ML020660676 NRR-058 OFFICE PDIV-2/PM PDIV-1/LA DRIP/TSS/SC OGC PDIV-2/SC NAME JDonohew MMcAllister RDennig* CMarco** SDembek DATE 3/4/2002 3/4/02 12/17/2001 02/26/2002 3/5/02 OFFICIAL RECORD COPY
ARIZONA PUBLIC SERVICE COMPANY, ET AL.
DOCKET NO. STN 50-528 PALO VERDE NUCLEAR GENERATING STATION, UNIT 1 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 139 License No. NPF-41
- 1. The Nuclear Regulatory Commission (the Commission) has found that:
A. The application for amendment by the Arizona Public Service Company (APS or the licensee) on behalf of itself and the Salt River Project Agricultural Improvement and Power District, El Paso Electric Company, Southern California Edison Company, Public Service Company of New Mexico, Los Angeles Department of Water and Power, and Southern California Public Power Authority dated September 11, 2001, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act) and the Commission's regulations set forth in 10 CFR Chapter I; B. The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C. There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D. The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E. The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
- 2. Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C(2) of Facility Operating License No. NPF-41 is hereby amended to read as follows:
(2) Technical Specifications and Environmental Protection Plan The Technical Specifications contained in Appendix A, as revised through Amendment No. 139, and the Environmental Protection Plan contained in Appendix B, are hereby incorporated into this license. APS shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan, except where otherwise stated in specific license conditions.
- 3. This license amendment is effective as of the date of issuance and shall be implemented within 45 days of the date of issuance.
FOR THE NUCLEAR REGULATORY COMMISSION
/RA/
Stephen Dembek, Chief, Section 2 Project Directorate IV Division of Licensing Project Management Office of Nuclear Reactor Regulation
Attachment:
Changes to the Technical Specifications Date of Issuance: March 1, 2002
ARIZONA PUBLIC SERVICE COMPANY, ET AL.
DOCKET NO. STN 50-529 PALO VERDE NUCLEAR GENERATING STATION, UNIT 2 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 139 License No. NPF-51
- 1. The Nuclear Regulatory Commission (the Commission) has found that:
A. The application for amendment by the Arizona Public Service Company (APS or the licensee) on behalf of itself and the Salt River Project Agricultural Improvement and Power District, El Paso Electric Company, Southern California Edison Company, Public Service Company of New Mexico, Los Angeles Department of Water and Power, and Southern California Public Power Authority dated September 11, 2001, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act) and the Commission's regulations set forth in 10 CFR Chapter I; B. The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C. There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D. The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E. The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
- 2. Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C(2) of Facility Operating License No. NPF-51 is hereby amended to read as follows:
(2) Technical Specifications and Environmental Protection Plan The Technical Specifications contained in Appendix A, as revised through Amendment No. 139, and the Environmental Protection Plan contained in Appendix B, are hereby incorporated into this license. APS shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan, except where otherwise stated in specific license conditions.
- 3. This license amendment is effective as of the date of issuance and shall be implemented within 45 days of the date of issuance.
FOR THE NUCLEAR REGULATORY COMMISSION
/RA/
Stephen Dembek, Chief, Section 2 Project Directorate IV Division of Licensing Project Management Office of Nuclear Reactor Regulation
Attachment:
Changes to the Technical Specifications Date of Issuance: 139
ARIZONA PUBLIC SERVICE COMPANY, ET AL.
DOCKET NO. STN 50-530 PALO VERDE NUCLEAR GENERATING STATION, UNIT 3 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 139 License No. NPF-74
- 1. The Nuclear Regulatory Commission (the Commission) has found that:
A. The application for amendment by the Arizona Public Service Company (APS or the licensee) on behalf of itself and the Salt River Project Agricultural Improvement and Power District, El Paso Electric Company, Southern California Edison Company, Public Service Company of New Mexico, Los Angeles Department of Water and Power, and Southern California Public Power Authority dated September 11, 2001, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act) and the Commission's regulations set forth in 10 CFR Chapter I; B. The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C. There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D. The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E. The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
- 2. Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C(2) of Facility Operating License No. NPF-74 is hereby amended to read as follows:
(2) Technical Specifications and Environmental Protection Plan The Technical Specifications contained in Appendix A, as revised through Amendment No. 139, and the Environmental Protection Plan contained in Appendix B, are hereby incorporated into this license. APS shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan, except where otherwise stated in specific license conditions.
- 3. This license amendment is effective as of the date of issuance and shall be implemented within 45 days of the date of issuance.
FOR THE NUCLEAR REGULATORY COMMISSION
/RA/
Stephen Dembek, Chief, Section 2 Project Directorate IV Division of Licensing Project Management Office of Nuclear Reactor Regulation
Attachment:
Changes to the Technical Specifications Date of Issuance: March 1, 2002
ATTACHMENT TO LICENSE AMENDMENT NOS. 139, 139, AND 139 FACILITY OPERATING LICENSE NOS. NPF-41, NPF-51, AND NPF-74 DOCKET NOS. STN 50-528, STN 50-529, AND STN 50-530 Replace the following page of the Appendix A Technical Specifications with the attached revised page. The revised page is identified by amendment number and contains a marginal line indicating the area of change.
REMOVE INSERT 3.9.5-1 3.9.5-1
SAFETY EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION RELATED TO AMENDMENT NO. 139 TO FACILITY OPERATING LICENSE NO. NPF-41, AMENDMENT NO. 139 TO FACILITY OPERATING LICENSE NO. NPF-51, AND AMENDMENT NO. 139 TO FACILITY OPERATING LICENSE NO. NPF-74 ARIZONA PUBLIC SERVICE COMPANY, ET AL.
PALO VERDE NUCLEAR GENERATING STATION, UNITS 1, 2, AND 3 DOCKET NOS. STN 50-528, STN 50-529, AND STN 50-530
1.0 INTRODUCTION
By application dated September 11, 2001, the Arizona Public Service Company (the licensee) requested changes to the Technical Specifications (TSs) for the Palo Verde Nuclear Generating Station (Palo Verde), Units 1, 2, and 3. The licensee submitted this request on behalf of itself, the Salt River Project Agricultural Improvement and Power District, Southern California Edison Company, El Paso Electric Company, Public Service Company of New Mexico, Los Angeles Department of Water and Power, and Southern California Public Power Authority.
The requested changes are to TS 3.9.5, "Shutdown Cooling (SDC) and Coolant Circulation-Low Water Level." The proposed addition of a note to limiting condition of operation (LCO) 3.9.5 would allow the non-operating shutdown cooling (SDC) loop to be declared inoperable for a period of up to two hours for surveillance testing in Mode 6. This change is based on the NRC-approved Technical Specification Task Force (TSTF)-361, Revision 2, for NUREG-1432,
"[Improved] Standard Technical Specifications [for] Combustion Engineering Plants," dated April 1995. Changes to NUREG-1432 are applicable to the Palo Verde units because the units are Combustion Engineering plants, and the TSs for the units are based on NUREG-1432.
In addition, the licensee stated that the TS 3.9.5 Bases will be revised to ensure that consideration is given to such factors as core time to boil, a potential boron dilution event, and the ability to inject borated water into the core, if needed. The TS Bases insert for the TSTF stated that consideration should be given and consideration should include as part of the text. The licensee determined that this wording needed to be strengthened. The licensee stated that "should" would be replaced by "shall," and the Bases wording would be changed to consideration shall be given and consideration shall as a minimum include, respectively.
2.0 BACKGROUND
Section 182a of the Atomic Energy Act requires that technical specifications be included in nuclear power plant operating licenses. On February 6, 1987, the Commission issued an Interim Policy Statement on Technical Specification Improvements for Nuclear Power
Reactors. During the period from 1989 to 1992, utility groups and the NRC staff developed improved Standard Technical Specifications (STS). On July 22, 1993, the Commission issued its Final Policy Statement, which described the safety benefits of the improved STS, and encouraged licensees to use the improved STS as the basis for plant-specific TS amendments, and for complete conversions to plant-specific improved TS. The Palo Verde units converted to the improved TS in 1998.
The industry and the NRC staff have worked to improve the new improved STS, and many generic changes have been developed. These changes have improved the adoption process for generically acceptable changes to plant improved TS. Generic changes to the improved STS NUREGs are proposed to the NRC by the Nuclear Energy Institute TSTFs, such as TSTF-361. After NRC approval, these TSTFs are available for adoption by plants.
3.0 EVALUATION The need for Palo Verde to adopt TSTF-361, Revision 2 is that limiting condition for operation (LCO) 3.9.5 does not allow the non-operating SDC loop to be inoperable to support surveillance testing, while LCO 3.4.7, "RCS Loops - Mode 5, Loops Filled," and LCO 3.4.8, "RCS Loops -
Mode 5, Loops Not Filled," both allow the non-operating SDC loop to be inoperable for a period of up to two hours to perform surveillance testing, provided the other SDC loop is operable and operating.
The proposed amendment would add a note to LCO 3.9.5 that would permit one required-operable (or standby) SDC loop to be declared inoperable for a period of up to two hours for surveillance testing, provided the other SDC loop is operable and in operation. TS 3.9.5 is applicable in Mode 6 with the water level less than 23 feet above the top of the reactor vessel flange. The addition of the proposed Note to LCO would permit the licensee to declare the standby SDC loop inoperable for surveillance testing for up to 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> without entering and following the LCO 3.9.5 Required Actions for an inoperable SDC loop.
The proposed amendment would reduce the burden of scheduling surveillance tests that would result in an SDC loop being made inoperable in Mode 5, where scheduling flexibility is limited.
The proposed amendment would permit the surveillance tests to be performed on the non-operating SDC loop in Mode 6 during a time when these tests are safe and when the greatest scheduling flexibility exists, while ensuring that there is reasonable time for operators to respond to and mitigate any expected failures. Therefore, for consistency with LCOs 3.4.7 and 3.4.8, and to support required outage activities by allowing SDC surveillance testing in Mode 6 and still maintain the plant in a safe condition, the licensee proposes to adopt this note.
In Mode 6, with water level less than 23 feet above the top of the reactor vessel flange, the second SDC loop (standby) is required to be operable to ensure that a backup shutdown cooling loop can be placed in operation in the event that the operating SDC loop becomes inoperable. This requirement ensures that an additional SDC pump can be quickly placed in operation, if necessary, to maintain decay heat removal and reactor coolant circulation to prevent boron stratification in the core.
The purposes of the SDC system in Mode 6 are to provide coolant flow to remove decay heat and sensible heat from the reactor coolant system (RCS) and prevent boron stratification by mixing the water in the RCS. In reviewing the proposed change to LCO 3.9.5, the NRC staff
considered the effect of permitting the second (standby) required-operable SDC loop to be declared inoperable for a period of up to two hours for surveillance testing, on the time to boil water in the core and on boron stratification of the RCS. These are addressed below:
One SDC loop is sufficient to provide the necessary decay heat removal capability and to prevent core boiling and boron stratification in the reactor core, and, if the SDC loop is providing decay heat removal, it is preventing boron stratification. The proposed amendment would only permit the standby SDC loop to be unavailable for a period up to two hours. The licensee stated that, prior to it declaring the standby SDC loop inoperable for surveillance testing using the proposed Note, it would consider such factors as the current plant status, core time to boil (with a shorter time to boil with reduced water inventory), potential RCS draining operations that may further reduce RCS water level, having the capability to inject borated water into the core (which is not by the SDC loops), and conducting surveillance tests that may render the standby SDC loop inoperable during a time when these tests are safe and possible. The licensee further stated that, in the unlikely event that the operating SDC loop would become inoperable while the backup SDC loop is undergoing surveillance testing, the TS 3.9.5 Required Actions are sufficient to ensure adequate decay heat removal, and the operator action to restore the backup SDC loop to operation would be timely such that adequate heat removal capability is restored.
The NRC staff has reviewed the proposed amendment. As described above, the licensee has stated that it would consider current plant conditions before performing surveillance tests on the standby SDC loop such that the surveillance tests are conducted safely. Also, the NRC staff agrees that the LCO 3.9.5 Required Actions, if the standby SDC becomes inoperable for any reason other than the proposed Note, are sufficient to ensure adequate decay heat removal in that these required actions would immediately initiate action to establish at least 23 feet of water above the top of the reactor vessel flange. Because the standby SDC loop would be declared inoperable only for surveillance testing for a period of only up to 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />, there is no reason to believe that the standby SDC loop cannot be quickly made operational and the licensee would be ready for this possibility. Based on this, the NRC staff concludes that the addition of this note maintains adequate safety for the Palo Verde units, and is, therefore, acceptable.
In addition, the associated TS Bases will be revised to ensure that consideration is given to such factors as core time to boil, potential RCS draining evolutions, and having the ability to inject borated water into the core, if needed. The Bases insert for the TSTF stated that consideration should be given and consideration should include as part of the text. During the Palo Verde internal review process required by the Palo Verde Quality Assurance Program, it was determined that this wording needed to be strengthened. Therefore, the text in the TSTF was changed to consideration shall be given and consideration shall as a minimum include, respectively. The NRC staff has no disagreement with the wording change from should to shall, which eliminates any ambiguity in the meaning of the TS Bases.
4.0 STATE CONSULTATION
In accordance with the Commission's regulations, the Arizona State official was notified of the proposed issuance of the amendments. The State official had no comments.
5.0 ENVIRONMENTAL CONSIDERATION
The amendments change a requirement with respect to the installation or use of a facility component located within the restricted area as defined in 10 CFR Part 20. The NRC staff has determined that the amendments involve no significant increase in the amounts and no significant change in the types of any effluents that may be released offsite, and that there is no significant increase in individual or cumulative occupational radiation exposure. The Commission has previously issued a proposed finding that the amendments involve no significant hazards consideration, and there has been no public comment on such finding (66 FR 59501 dated November 28, 2001). Accordingly, the amendments meet the eligibility criteria for categorical exclusion set forth in 10 CFR 51.22(c)(9). Pursuant to 10 CFR 51.22(b) no environmental impact statement or environmental assessment need be prepared in connection with the issuance of the amendments.
6.0 CONCLUSION
The Commission has concluded, based on the considerations discussed above, that (1) there is reasonable assurance that the health and safety of the public will not be endangered by operation in the proposed manner, (2) such activities will be conducted in compliance with the Commission's regulations, and (3) the issuance of the amendments will not be inimical to the common defense and security or to the health and safety of the public.
Principal Contributor: Jack Donohew Angela Chu Date: March 1, 2002
Palo Verde Generating Station, Units 1, 2, and 3 cc:
Mr. Steve Olea Mr. David Summers Arizona Corporation Commission Public Service Company of New Mexico 1200 W. Washington Street 414 Silver SW, #1206 Phoenix, AZ 85007 Albuquerque, NM 87102 Douglas Kent Porter Mr. Jarlath Curran Senior Counsel Southern California Edison Company Southern California Edison Company 5000 Pacific Coast Hwy Bldg DIN Law Department, Generation Resources San Clemente, CA 92672 P.O. Box 800 Rosemead, CA 91770 Mr. Robert Henry Salt River Project Senior Resident Inspector 6504 East Thomas Road U.S. Nuclear Regulatory Commission Scottsdale, AZ 85251 P. O. Box 40 Buckeye, AZ 85326 Terry Bassham, Esq.
General Counsel Regional Administrator, Region IV El Paso Electric Company U.S. Nuclear Regulatory Commission 123 W. Mills Harris Tower & Pavillion El Paso, TX 79901 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011-8064 Mr. John Schumann Los Angeles Department of Water & Power Chairman Southern California Public Power Authority Maricopa County Board of Supervisors P.O. Box 51111, Room 1255-C 301 W. Jefferson, 10th Floor Los Angeles, CA 90051-0100 Phoenix, AZ 85003 Mr. Aubrey V. Godwin, Director Arizona Radiation Regulatory Agency 4814 South 40 Street Phoenix, AZ 85040 Mr. Craig K. Seaman, Director Regulatory Affairs Arizona Public Service Company P.O. Box 52034 Phoenix, AZ 85072-2034 Mr. Hector R. Puente Vice President, Power Generation El Paso Electric Company 2702 N. Third Street, Suite 3040 Phoenix, AZ 85004