Letter Sequence Response to RAI |
---|
CAC:MF6722, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control (Approved, Closed) |
|
MONTHYEARLIC-15-0076, License Amendment Request 15-06; Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-501, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control.2015-09-11011 September 2015 License Amendment Request 15-06; Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-501, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control. Project stage: Request ML15294A5512015-10-21021 October 2015 NRR E-mail Capture - Acceptance Review for CAC No. MF6722 Project stage: Acceptance Review ML16048A0242016-02-23023 February 2016 Request for Additional Information, License Amendment Request to Adopt Technical Specification Task Force (TSTF)-501, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control Project stage: RAI LIC-16-0025, Ft. Calhoun, Unit 1 - Response to Request for Additional Information Adoption of TSTF-501, Revision 12016-04-0808 April 2016 Ft. Calhoun, Unit 1 - Response to Request for Additional Information Adoption of TSTF-501, Revision 1 Project stage: Response to RAI ML16182A3632016-08-19019 August 2016 Issuance of Amendment No. 289, Request to Adopt Technical Specification Task Force (TSTF)-501, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control Project stage: Approval 2016-02-23
[Table View] |
|
---|
Category:Letter type:LIC
MONTHYEARLIC-24-0012, Independent Spent Fuel Storage Installation - Response to Proposed Revision to Decommissioning Quality Assurance Plan (DQAP) - Request for Additional Information2024-10-0707 October 2024 Independent Spent Fuel Storage Installation - Response to Proposed Revision to Decommissioning Quality Assurance Plan (DQAP) - Request for Additional Information LIC-24-0011, Independent Spent Fuel Storage Installation - Response to Application for License Amendment Request to Revise the License Termination Plan - Supplemental Information Needed, EPID L-2024-LLA-00952024-10-0202 October 2024 Independent Spent Fuel Storage Installation - Response to Application for License Amendment Request to Revise the License Termination Plan - Supplemental Information Needed, EPID L-2024-LLA-0095 LIC-24-0007, License Amendment Request (LAR) to Revise License Termination Plan (LTP)2024-06-18018 June 2024 License Amendment Request (LAR) to Revise License Termination Plan (LTP) LIC-24-0008, Proposed Revision to the Omaha Public Power District (OPPD) Fort Calhoun Station (FCS) Decommissioning Quality Assurance Plan (Dqap), Unit No. 1 and ISFSI2024-05-16016 May 2024 Proposed Revision to the Omaha Public Power District (OPPD) Fort Calhoun Station (FCS) Decommissioning Quality Assurance Plan (Dqap), Unit No. 1 and ISFSI LIC-24-0003, Independent Spent Fuel Storage Installation - Radiological Effluent Release Report and Radiological Environmental Operating Report2024-04-25025 April 2024 Independent Spent Fuel Storage Installation - Radiological Effluent Release Report and Radiological Environmental Operating Report LIC-24-0006, (Fcs), Unit 1, Independent Spent Fuel Storage Installation, Phase 1 Final Status Survey Report to Support Approved License Termination Plan2024-04-17017 April 2024 (Fcs), Unit 1, Independent Spent Fuel Storage Installation, Phase 1 Final Status Survey Report to Support Approved License Termination Plan LIC-24-0005, Annual Decommissioning Funding / Irradiated Fuel Management Status Report2024-03-0101 March 2024 Annual Decommissioning Funding / Irradiated Fuel Management Status Report LIC-24-0002, Independent Spent Fuel Storage Installation - Submittal of Annual Radioactive Effluent Release Report2024-02-27027 February 2024 Independent Spent Fuel Storage Installation - Submittal of Annual Radioactive Effluent Release Report LIC-23-0007, Response to Fort Calhoun, Unit 1 & Independent Spent Fuel Storage Installation Review of License Amendment Request to Add License Condition to Include License Termination Plan Requirements – Request for Additional Information2023-12-0606 December 2023 Response to Fort Calhoun, Unit 1 & Independent Spent Fuel Storage Installation Review of License Amendment Request to Add License Condition to Include License Termination Plan Requirements – Request for Additional Information LIC-23-0005, Response to Fort Calhoun Station, Unit No. 1 - Review of License Amendment Request to Add License Condition to Include License Termination Plan Requirements - 2nd Request for Additional Information (EPID L-2021-LIT-0000) June 2, 20232023-08-24024 August 2023 Response to Fort Calhoun Station, Unit No. 1 - Review of License Amendment Request to Add License Condition to Include License Termination Plan Requirements - 2nd Request for Additional Information (EPID L-2021-LIT-0000) June 2, 2023 LIC-23-0004, (FCS) Radiological Effluent Release Report and Radiological Environmental Operating Report2023-04-20020 April 2023 (FCS) Radiological Effluent Release Report and Radiological Environmental Operating Report LIC-23-0003, Annual Decommissioning Funding / Irradiated Fuel Management Status Report2023-03-15015 March 2023 Annual Decommissioning Funding / Irradiated Fuel Management Status Report LIC-23-0001, Response to Fort Calhoun Station, Unit No. 1 - Review of License Amendment Request to Add License Condition to Include License Termination Plan Requirements - Request for Additional Information2023-02-27027 February 2023 Response to Fort Calhoun Station, Unit No. 1 - Review of License Amendment Request to Add License Condition to Include License Termination Plan Requirements - Request for Additional Information LIC-23-0002, Independent Spent Fuel Storage Installation, Annual Radioactive Effluent Release Report2023-02-20020 February 2023 Independent Spent Fuel Storage Installation, Annual Radioactive Effluent Release Report LIC-22-0010, Response to Fort Calhoun Station, Unit No. 1 - Review of License Termination Plan Requirements - Request for Additional Information2022-06-15015 June 2022 Response to Fort Calhoun Station, Unit No. 1 - Review of License Termination Plan Requirements - Request for Additional Information LIC-22-0005, (FCS) Radiological Effluent Release Report and Radiological Environmental Operating Report2022-04-20020 April 2022 (FCS) Radiological Effluent Release Report and Radiological Environmental Operating Report LIC-22-0009, Annual Decommissioning Funding / Irradiated Fuel Management Status Report2022-03-30030 March 2022 Annual Decommissioning Funding / Irradiated Fuel Management Status Report LIC-22-0006, Reactor Head Disposition Project Overview2022-03-17017 March 2022 Reactor Head Disposition Project Overview LIC-22-0004, Independent Spent Fuel Storage Installation, Annual Radioactive Effluent Release Report2022-02-17017 February 2022 Independent Spent Fuel Storage Installation, Annual Radioactive Effluent Release Report LIC-21-0008, Organizational and Management Change2021-10-28028 October 2021 Organizational and Management Change LIC-21-0007, ISFSI Only Emergency Plan Update2021-09-0808 September 2021 ISFSI Only Emergency Plan Update LIC-21-0004, Radiological Effluent Release Report and Radiological Environmental Operating Report2021-04-29029 April 2021 Radiological Effluent Release Report and Radiological Environmental Operating Report LIC-21-0003, Independent Spent Fuel Storage Installation - 2021 Annual Decommissioning Funding / Irradiated Fuel Management Status Report2021-03-30030 March 2021 Independent Spent Fuel Storage Installation - 2021 Annual Decommissioning Funding / Irradiated Fuel Management Status Report LIC-21-0002, Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report2021-02-22022 February 2021 Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report LIC-20-0015, Correction to Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report 2019 (ML20121A092)2020-07-29029 July 2020 Correction to Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report 2019 (ML20121A092) LIC-20-0014, Submittal of Revision 8 to the Fort Calhoun Station (Fcs), Physical Security Plan (PSP)2020-07-15015 July 2020 Submittal of Revision 8 to the Fort Calhoun Station (Fcs), Physical Security Plan (PSP) LIC-20-0012, Independent Spent Fuel Storage Installation (ISFSI) Cask Registration and Certification of Permanent Removal of All Spent Fuel Assemblies from the Spent Fuel Pool2020-05-18018 May 2020 Independent Spent Fuel Storage Installation (ISFSI) Cask Registration and Certification of Permanent Removal of All Spent Fuel Assemblies from the Spent Fuel Pool LIC-20-0011, Independent Spent Fuel Storage Installation (ISFSI) Cask Registration2020-05-0707 May 2020 Independent Spent Fuel Storage Installation (ISFSI) Cask Registration LIC-20-0009, (FCS) Radiological Effluent Release Report and Radiological Environmental Operating Report2020-04-30030 April 2020 (FCS) Radiological Effluent Release Report and Radiological Environmental Operating Report LIC-20-0008, Independent Spent Fuel Storage Installation (ISFSI) Cask Registration2020-04-13013 April 2020 Independent Spent Fuel Storage Installation (ISFSI) Cask Registration LIC-20-0006, (Fcs), Unit 1, Request for Exemption from 10 CFR 20, Appendix G, Section Iii.E2020-03-26026 March 2020 (Fcs), Unit 1, Request for Exemption from 10 CFR 20, Appendix G, Section Iii.E LIC-20-0004, Independent Spent Fuel Storage Installation (ISFSI) Cask Registration2020-03-10010 March 2020 Independent Spent Fuel Storage Installation (ISFSI) Cask Registration LIC-20-0003, Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report2020-02-27027 February 2020 Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report LIC-20-0002, Independent Spent Fuel Storage Installation - Submittal of Revision 7 to Physical Security Plan2020-02-27027 February 2020 Independent Spent Fuel Storage Installation - Submittal of Revision 7 to Physical Security Plan LIC-20-0001, Independent Spent Fuel Storage Installation (ISFSI) Cask Registration2020-02-0606 February 2020 Independent Spent Fuel Storage Installation (ISFSI) Cask Registration LIC-19-0025, Independent Spent Fuel Storage Installation (ISFSI) Cask Registration2019-12-19019 December 2019 Independent Spent Fuel Storage Installation (ISFSI) Cask Registration LIC-19-0007, Post-Shutdown Decommissioning Activities Report2019-12-16016 December 2019 Post-Shutdown Decommissioning Activities Report LIC-19-0021, Independent Spent Fuel Storage Installation - Response to Request for Additional Information License Amendment for ISFSI-only EP and EAL Scheme2019-11-20020 November 2019 Independent Spent Fuel Storage Installation - Response to Request for Additional Information License Amendment for ISFSI-only EP and EAL Scheme LIC-19-0022, Independent Spent Fuel Storage Installation (ISFSI) Cask Registration2019-11-18018 November 2019 Independent Spent Fuel Storage Installation (ISFSI) Cask Registration LIC-19-0018, Submittal of Revision 6 to the Fort Calhoun Station (Fcs), Physical Security Plan (PSP)2019-11-14014 November 2019 Submittal of Revision 6 to the Fort Calhoun Station (Fcs), Physical Security Plan (PSP) LIC-19-0020, Independent Spent Fuel Storage Installation - Updated Information Submittal and Revision 1 of the Blast Analysis2019-10-17017 October 2019 Independent Spent Fuel Storage Installation - Updated Information Submittal and Revision 1 of the Blast Analysis LIC-19-0017, Clarification to Revised Response to Orders for Interim Safeguards and Security Compensatory Measures and Implementation of Additional Security Measures Associated with Access Authorization for Fort Calhoun Station Dated 9 November, 20042019-08-0808 August 2019 Clarification to Revised Response to Orders for Interim Safeguards and Security Compensatory Measures and Implementation of Additional Security Measures Associated with Access Authorization for Fort Calhoun Station Dated 9 November, 2004 An LIC-19-0010, License Amendment Request (LAR) 19-03; Revised Fort Calhoun Station License in Support of the Revised Response to Orders for Interim Safeguards and Security Compensatory Measures and Implementation of Additional Security Measures Associa2019-05-20020 May 2019 License Amendment Request (LAR) 19-03; Revised Fort Calhoun Station License in Support of the Revised Response to Orders for Interim Safeguards and Security Compensatory Measures and Implementation of Additional Security Measures Associated LIC-19-0008, Submittal of 2018 Annual Report2019-04-0404 April 2019 Submittal of 2018 Annual Report LIC-19-0004, Independent Spent Fuel Storage Installation - Submittal of Revision 4 to Physical Security Plan (PSP)2019-03-28028 March 2019 Independent Spent Fuel Storage Installation - Submittal of Revision 4 to Physical Security Plan (PSP) LIC-19-0005, 2019 Annual Decommissioning Funding I Irradiated Fuel Management Status Report2019-03-28028 March 2019 2019 Annual Decommissioning Funding I Irradiated Fuel Management Status Report LIC-19-0001, License Amendment Request (LAR) 19-01: Independent Spent Fuel Storage Installation (ISFSI) Emergency Plan and Emergency Action Level Scheme2019-02-28028 February 2019 License Amendment Request (LAR) 19-01: Independent Spent Fuel Storage Installation (ISFSI) Emergency Plan and Emergency Action Level Scheme LIC-19-0003, Revised Response to Orders for Interim Safeguards and Security Compensatory Measures and Implementation of Additional Security Measures Associated with Access Authorization for Fort Calhoun Station Dated 9 November, 2004 and Relaxation R2019-02-28028 February 2019 Revised Response to Orders for Interim Safeguards and Security Compensatory Measures and Implementation of Additional Security Measures Associated with Access Authorization for Fort Calhoun Station Dated 9 November, 2004 and Relaxation Requ LIC-19-0002, Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report2019-01-0303 January 2019 Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report LIC-18-0031, Independent Spent Fuel Storage Installation - Transmittal of Emergency Plan Update2018-12-17017 December 2018 Independent Spent Fuel Storage Installation - Transmittal of Emergency Plan Update 2024-06-18
[Table view] Category:Response to Request for Additional Information (RAI)
MONTHYEARML24289A2042024-10-0909 October 2024 Clarification Responses LIC-24-0012, Independent Spent Fuel Storage Installation - Response to Proposed Revision to Decommissioning Quality Assurance Plan (DQAP) - Request for Additional Information2024-10-0707 October 2024 Independent Spent Fuel Storage Installation - Response to Proposed Revision to Decommissioning Quality Assurance Plan (DQAP) - Request for Additional Information LIC-24-0011, Independent Spent Fuel Storage Installation - Response to Application for License Amendment Request to Revise the License Termination Plan - Supplemental Information Needed, EPID L-2024-LLA-00952024-10-0202 October 2024 Independent Spent Fuel Storage Installation - Response to Application for License Amendment Request to Revise the License Termination Plan - Supplemental Information Needed, EPID L-2024-LLA-0095 ML24235A0822024-08-10010 August 2024 Response to Fort Calhoun Station, Unit No. 1 - Phase 1 Final Status Survey Report to Support Approved License Termination Plan - Request for Additional Information - Request for Additional Information (EPID L-2024-DFR-0002) July 8, 2024 ML23276A0042023-09-28028 September 2023 U.S. EPA Response Letter to NRC Letter on Consultation and Finality on Decommissioning and Decontamination of Contaminated Sites MOU - Fort Calhoun Station, Unit 1 – (License No. DPR-40, Docket No. 50-285) LIC-23-0005, Response to Fort Calhoun Station, Unit No. 1 - Review of License Amendment Request to Add License Condition to Include License Termination Plan Requirements - 2nd Request for Additional Information (EPID L-2021-LIT-0000) June 2, 20232023-08-24024 August 2023 Response to Fort Calhoun Station, Unit No. 1 - Review of License Amendment Request to Add License Condition to Include License Termination Plan Requirements - 2nd Request for Additional Information (EPID L-2021-LIT-0000) June 2, 2023 LIC-23-0001, Response to Fort Calhoun Station, Unit No. 1 - Review of License Amendment Request to Add License Condition to Include License Termination Plan Requirements - Request for Additional Information2023-02-27027 February 2023 Response to Fort Calhoun Station, Unit No. 1 - Review of License Amendment Request to Add License Condition to Include License Termination Plan Requirements - Request for Additional Information LIC-22-0010, Response to Fort Calhoun Station, Unit No. 1 - Review of License Termination Plan Requirements - Request for Additional Information2022-06-15015 June 2022 Response to Fort Calhoun Station, Unit No. 1 - Review of License Termination Plan Requirements - Request for Additional Information ML22034A5592022-01-13013 January 2022 Response to Fort Calhoun Station, Unit No. 1 - Acceptance Review of License Amendment Request to Add License Condition to Include License Termination Plan Requirements - Request for Supplemental Information (EPID L-2021-LIT-OOOO) Ml21350A02 ML20202A6542020-07-16016 July 2020 Response for Fort Calhoun Station Fort Calhoun Station, Unit No. 1, Revised Post-Shutdown Decommissioning Activities Report LIC-19-0021, Independent Spent Fuel Storage Installation - Response to Request for Additional Information License Amendment for ISFSI-only EP and EAL Scheme2019-11-20020 November 2019 Independent Spent Fuel Storage Installation - Response to Request for Additional Information License Amendment for ISFSI-only EP and EAL Scheme LIC-18-0018, Independent Spent Fuel Storage Installation - Emergency Plan Update2018-04-18018 April 2018 Independent Spent Fuel Storage Installation - Emergency Plan Update ML18088B3782018-03-29029 March 2018 Response to Request for Additional Information Regarding Omaha Public Power District'S Decommissioning Funding Plan Update for Fort Calhoun Station Independent Spent Fuel Storage Installation ML17348A6232017-12-14014 December 2017 Response for Fort Calhoun Station Specific Questions and Concerns Regarding Omaha Public Power District'S Post-Shutdown Decommissioning Activities Report (PSDAR) LIC-17-0068, Reply to Final Request for Additional Information (RAI) for Fort Calhoun Exemption from 10 CFR 140.11 (a)(4), Off-site Primary and Secondary Liability Insurance (MF9664)2017-10-0404 October 2017 Reply to Final Request for Additional Information (RAI) for Fort Calhoun Exemption from 10 CFR 140.11 (a)(4), Off-site Primary and Secondary Liability Insurance (MF9664) LIC-17-0065, Submittal of Response to Request for Additional Information Re Fort Calhoun Request to Revise Their Technical Specifications to Align to Those Requirements for Decommissioning2017-09-26026 September 2017 Submittal of Response to Request for Additional Information Re Fort Calhoun Request to Revise Their Technical Specifications to Align to Those Requirements for Decommissioning ML17268A2212017-09-25025 September 2017 Response to Request for Additional Information (RAI) Regarding License Amendment Request 16-04 Revising Current Licensing Basis to Use Aci Ultimate Strength Requirements ML17264A7502017-09-21021 September 2017 Response to Request for Additional Information (RAI) License Amendment Request Regarding Removal of Dry Cask Loading Limits Fort Calhoun Station, Unit 1 Docket No.: 50-285 (MF9831) LIC-17-0054, Submission of Corrected Pages for Response to Request for Additional Information, Fort Calhoun Station, Unit No. 1 - Request for Additional Information Certified Fuel Handler Training Program2017-06-0606 June 2017 Submission of Corrected Pages for Response to Request for Additional Information, Fort Calhoun Station, Unit No. 1 - Request for Additional Information Certified Fuel Handler Training Program LIC-17-0047, Final Request for Additional Information Concerning License Amendment Request 16-07: Revise the Emergency Plan to the Permanently Defueled Emergency Plan and Permanently Defueled Emergency Action Level Scheme2017-05-15015 May 2017 Final Request for Additional Information Concerning License Amendment Request 16-07: Revise the Emergency Plan to the Permanently Defueled Emergency Plan and Permanently Defueled Emergency Action Level Scheme LIC-17-0048, Response to Request for Additional Information Regarding the Fort Calhoun Station Request to Revise Technical Specifications to Align Staffing Requirements for Permanently Defueled Condition2017-04-27027 April 2017 Response to Request for Additional Information Regarding the Fort Calhoun Station Request to Revise Technical Specifications to Align Staffing Requirements for Permanently Defueled Condition LIC-17-0045, Response to Request for Additional Information Defueled Emergency Plan Exemption Request2017-04-20020 April 2017 Response to Request for Additional Information Defueled Emergency Plan Exemption Request LIC-17-0037, Response to Request for Additional Information, Fort Calhoun Station, Unit No.1 - Final Request for Additional Information Concerning Exemption from the Requirements of 10 CFR 50.47 and Appendix E2017-04-14014 April 2017 Response to Request for Additional Information, Fort Calhoun Station, Unit No.1 - Final Request for Additional Information Concerning Exemption from the Requirements of 10 CFR 50.47 and Appendix E LIC-17-0036, Supplemental Response to Request for Additional Information - Final Request for Additional Information Concerning Post-Shutdown Eplan Amendment2017-04-0505 April 2017 Supplemental Response to Request for Additional Information - Final Request for Additional Information Concerning Post-Shutdown Eplan Amendment ML17089A5442017-03-30030 March 2017 Response to Request for Additional Information Certified Fuel Handler Training Program LIC-17-0020, Response to Request for Additional Information, Final Request for Additional Information Concerning Post-Shutdown Eplan Amendment2017-03-0303 March 2017 Response to Request for Additional Information, Final Request for Additional Information Concerning Post-Shutdown Eplan Amendment ML17041A4442017-02-10010 February 2017 Supplemental Information Needed for Acceptance of Requested Licensing Action Fort Calhoun Station Request for Exemptions from Portions of 10 CFR 50.47 and 10 CFR Part 50, Appendix E (CAC No. MF9067). (Non-Proprietary)(Part 2 of 4) ML17041A4432017-02-10010 February 2017 Supplemental Information Needed for Acceptance of Requested Licensing Action Fort Calhoun Station Request for Exemptions from Portions of 10 CFR 50.47 and 10 CFR Part 50, Appendix E (CAC No. MF9067). (Non-Proprietary)(Part 1 of 4) LIC-17-0024, Supplemental Information Needed for Acceptance of Requested Licensing Action Fort Calhoun Station Request for Exemptions from Portions of 10 CFR 50.47 and 10 CFR Part 50, Appendix E (CAC No. MF9067). (Non-Proprietary)(Part 4 of 4)2017-02-10010 February 2017 Supplemental Information Needed for Acceptance of Requested Licensing Action Fort Calhoun Station Request for Exemptions from Portions of 10 CFR 50.47 and 10 CFR Part 50, Appendix E (CAC No. MF9067). (Non-Proprietary)(Part 4 of 4) LIC-16-0107, Final Response to the Request for Information, Per 10CFR50.54(f) Regarding Recommendations 2.1, 2.3, and 9.3, of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident and Corresponding Commitments2016-11-18018 November 2016 Final Response to the Request for Information, Per 10CFR50.54(f) Regarding Recommendations 2.1, 2.3, and 9.3, of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident and Corresponding Commitments LIC-16-0090, Response to Request for Additional Information Regarding Certified Fuel Handler Training Program2016-10-0707 October 2016 Response to Request for Additional Information Regarding Certified Fuel Handler Training Program LIC-16-0078, Revision to Response to Request for Information Regarding Flooding Aspects of Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident - Flood Hazard Reevaluation Report2016-09-14014 September 2016 Revision to Response to Request for Information Regarding Flooding Aspects of Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident - Flood Hazard Reevaluation Report ML16165A0282016-06-0909 June 2016 Response to NRC Request for Additional Information Revise Current Licensing Basis to Use American Concrete Institute Ultimate Strength Requirements LIC-16-0044, Calculation FC08499 Evaluation of FCS Concrete Compressive Strength Test Data2016-06-0101 June 2016 Calculation FC08499 Evaluation of FCS Concrete Compressive Strength Test Data LIC-16-0025, Ft. Calhoun, Unit 1 - Response to Request for Additional Information Adoption of TSTF-501, Revision 12016-04-0808 April 2016 Ft. Calhoun, Unit 1 - Response to Request for Additional Information Adoption of TSTF-501, Revision 1 LIC-16-0022, Response to NRC Request for Additional Information Revise Current Licensing Basis to Allow Use of Equipment Classification Methodology from ANSI/ANS-58.14-20112016-04-0808 April 2016 Response to NRC Request for Additional Information Revise Current Licensing Basis to Allow Use of Equipment Classification Methodology from ANSI/ANS-58.14-2011 ML16057A0742016-02-26026 February 2016 Response to Regulatory Information Summary (RIS) 2015-16, Planned Licensing Action Submittals for All Power Reactor Licensees. LIC-16-0001, Response to NRC Request for Additional Information Technical Specification Administrative Changes2016-01-27027 January 2016 Response to NRC Request for Additional Information Technical Specification Administrative Changes LIC-15-0147, Response to NRC Request for Additional Information Fifth Lnservice Testing Interval Relief Requests P-1 and P-22016-01-11011 January 2016 Response to NRC Request for Additional Information Fifth Lnservice Testing Interval Relief Requests P-1 and P-2 LIC-15-0139, ISFSI - Supplemental OPPD Response to NRC Request for Additional Information License Amendment Request to Adopt Emergency Action Level Scheme Pursuant to NEI 99-01, Revision 62015-12-0808 December 2015 ISFSI - Supplemental OPPD Response to NRC Request for Additional Information License Amendment Request to Adopt Emergency Action Level Scheme Pursuant to NEI 99-01, Revision 6 ML15350A0182015-11-30030 November 2015 Transmittal of Response to Remaining Questions from NRC Request for Additional Information (RAI) Regarding Reactor Vessel Internal Component Aging Management Program ML15350A0192015-11-30030 November 2015 Enclosure 6, Response to Remaining Questions from NRC Request for Additional Information (RAI) Regarding Reactor Vessel Internal Component Aging Management Program. (Non-Proprietary) LIC-15-0129, Addendum to Response to Request for Information Regarding Flooding Aspects of Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident - Flood Hazard Reevaluation Report2015-11-0404 November 2015 Addendum to Response to Request for Information Regarding Flooding Aspects of Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident - Flood Hazard Reevaluation Report LIC-15-0121, ISFSI - Supplemental OPPD Response to NRC Request for Additional Information License Amendment Request to Adopt Emergency Action Level Scheme Pursuant to NEI 99-01, Revision 62015-11-0202 November 2015 ISFSI - Supplemental OPPD Response to NRC Request for Additional Information License Amendment Request to Adopt Emergency Action Level Scheme Pursuant to NEI 99-01, Revision 6 LIC-15-0113, Response to Interim Staff Evaluation and Request for Additional Information Regarding the Overall Integrated Plan for Implementation of Order EA-12-051, Reliable Spent Fuel Pool Instrumentation2015-09-28028 September 2015 Response to Interim Staff Evaluation and Request for Additional Information Regarding the Overall Integrated Plan for Implementation of Order EA-12-051, Reliable Spent Fuel Pool Instrumentation LIC-15-0115, ISFSI - Response to NRC Request for Clean Copy of Emergency Action Level Technical Basis Document2015-09-18018 September 2015 ISFSI - Response to NRC Request for Clean Copy of Emergency Action Level Technical Basis Document LIC-15-0102, Response to NRC Request for Additional Information Re License Amendment Request to Adopt Emergency Action Level Scheme Per NEI 99-01, Rev. 62015-09-11011 September 2015 Response to NRC Request for Additional Information Re License Amendment Request to Adopt Emergency Action Level Scheme Per NEI 99-01, Rev. 6 2024-08-10
[Table view] |
Text
Omaha Public Power District LIC-16-0025 April 8, 2016 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001 Fort Calhoun Station (FCS), Unit 1 Renewed Facility Operating License No. DPR-40 NRC Docket No. 50-285
Subject:
Response to Request for Additional Information Re: FORT CALHOUN STATION, UNIT NO. 1 - Request for Additional Information RE: Adoption of TSTF-501, REVISION 1 (CAC NO. MF6722)
References:
- 1. Letter from OPPD (L. P. Cortopassi) to NRC (Document Control Desk), "License Amendment Request 15-06; Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-501, Revision 1 , "Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control"," dated September 11, 2015 (LIC-15-0076)
(ML15254A464)
- 2. Letter from NRC (C. F. Lyon) to OPPD (S. M. Marik), "Fort Calhoun Station, Unit No. 1 -Request for Additional Information RE: Adoption of TSTF-501, Revision 1 (CAC NO. MF6722)," dated February 23, 2016 (NRC-16-020) (ML16048A024)
Attached is the Omaha Public Power District (OPPD) response to an NRC request for additional information (RAI) (Reference 2) regarding License Amendment Request (LAR) 15-06 (Reference 1), which proposed Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-501, Revision 1, "Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control" for the FCS, Unit No. 1, Technical Specifications. This letter contains no regulatory commitments.
If you should have any questions regarding this submittal or require additional information, please contact Mr. Brad Blome at 402-533-7270.
Shane M. Marik Site Vice President and CNO SMM/epm Attachment c: M. L. Dapas, NRC Regional Administrator, Region IV C. F. Lyon, NRC Senior Project Manager S. M. Schneider, NRC Senior Resident Inspector 444 SOUTH 16TH STREET MALL
- OMAHA, NE 68102-2247 EMPLOYMENT WITH EOUAL OPPORTUNITY
LIC-16-0025 Attachment Page 1 REQUEST FOR ADDITIONAL INFORMATION LICENSE AMENDMENT REQUEST OMAHA PUBLIC POWER DISTRICT FORT CALHOUN STATION. UNIT NO. 1 DOCKET NO. 50-285 By letter dated September 11, 2015 (Agencywide Document Access and Management System (ADAMS) Accession No. ML15254A464), Omaha Public Power District (the licensee) submitted a license amendment request to adopt Technical Specifications Task Force (TSTF) Traveler TSTF-501, Revision 1, "Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control,* at Fort Calhoun Station, Unit No. 1 (FCS).
The U.S. Nuclear Regulatory Commission staff has reviewed the information provided in the application and determined that additional information is required in order to complete its formal review of the request.
RAI EPNB-1 The submittal states that storage tanks FO-1 and FO-10 are both 18,000 gallon storage tanks. Please provide the usable capacity of each tank. If the usable capacity is greater than 16,000 gallons, discuss why more than 16,000 gallons cannot be stored in the tank to provide more margin for emergency diesel generator (EDG) testing OPPD Response (Note: It is assumed that this question is asked in the context of the ANSI standard N195 requirement to maintain a 10% margin for diesel fuel inventory when using a time dependent loading for diesel fuel consumption calculations.)
FO-1 and FO-10 are designed to contain 18,000 gallons each although administrative controls prevent filling the tanks greater than 17,500 gallons to ensure that overflow does not occur during fill operations. The 16,000 gallon value is used as an administrative limit to allow operational flexibility during EDG testing. A typical monthly test for each EDG uses approximately 200 - 300 gallons. If the administrative limits were raised approximately 2000 gallons, (1000 gallons in FO-1 and 1000 gallons in FO-10) to a value that would permit crediting the required additional fuel to meet the 10% margin requirement, then the Technical Specification limit for FO-1 would be 17,000 gallons and the administrative limit for FO-10 would be 17,000 gallons. Since diesel fuel is required to be ordered when the tank inventory is within 500 gallons of the Technical Specification limit, fuel would need to be ordered every time an EDG monthly test is performed. This is considered excessively restrictive for normal operation.
LIC-16-0025 Attachment Page 2 RAI EPNB-2 In Section 3.0 of the submittal it states, in part that:
Since no piping existed between FO-1 and FO-10, operator action would be credited for the installation of a hose between the two tanks to allow transfer of fuel from FO-10 to FO-1 using a small motor-driven pump, (i. e. , FO-37), which was originally installed to transfer fuel between FO-10 and the diesel driven auxiliary feedwater pump, FW-54. In the event of a failure of FO-37, a backup method of fuel transfer between the two tanks was a manually operated portable pump that required no external power source.
Please discuss how fuel will be transferred from FO-10 to FO-1 when pump FO-37 is in operation pumping fuel to the diesel driven auxiliary feedwater pump. Provide the flow rates of pump FO-37 and the manually operated portable pump.
OPPD Response The steps for transferring fuel from FO-10 to FO-1 are included in Emergency Operating Procedure EOP/AOP Attachment MVA-19. This procedure requires the operator to connect a temporary fuel transfer hose to a fitting located at the discharge of pump FO-37 normally isolated from the pump by drain valve FO-201. The other end of the temporary hose is connected to the FO-1 fill pipe. FO-201 is then opened and the normal flow of FO-37 to the diesel driven auxiliary feedwater pump (FW-54) is stopped by closing FO-37 discharge isolation valve FO-196. This action prevents FO-37 from pumping to both FO-1 and FW-54 simultaneously. If the diesel-driven auxiliary feedwater pump FW-54 is operating during the fuel transfer process, the operator is directed to monitor the inventory in the FW-54 diesel fuel storage tank. FO-37 flow can be re-directed back to the FW-54 diesel storage tank at any time as needed. If FO-37 is unavailable, the manually operated portable pump, FO-57, is connected to hoses as needed to transfer fuel directly from FO-10 to FO-1 without reliance on any installed piping.
FO-37 is a screw-type positive displacement pump designed to operate at nominal flow of 5.8 gpm which is adequate for makeup to FO-1 as it supplies fuel to the operating EDG at a maximum rate of 3 gpm. The manually operated portable pump, (backup to FO-37), is capable of transferring a minimum of 7 gpm of No. 2 diesel fuel oil from F0-10 to FO-1 (Refer to calculation FC07807 for details including hose length and tank elevations.).
LIC-16-0025 Attachment Page 3 RAI EPNB-3 Please provide the justification for selecting a 3 percent margin for stored fuel oil for EDG testing instead of the 10 percent margin required by the American Nuclear Standards Institute (ANSI) Standard N195-1976.
OPPD Response The margin for stored fuel is calculated by comparing the amount of fuel available on site (in FO-1, FO-10 and tanks local to the EDGs) to the amount of fuel calculated to be necessary for seven days of EDG operation. Calculation FC06871 determines that the total volume of available fuel is 27,592 gallons. Engineering Analysis EA92-072 runs various cases of EDG loading to determine the most conservative value for required fuel. The resulting required minimum value is 26,739 gallons for seven days of operation. Comparing these two values results in a margin of approximately 3%.
Note that the required minimum from EA92-072 does not include an allowance for periodic testing. Fuel inventory in excess of the minimum is administratively controlled to ensure that monthly EDG testing can be performed without fuel inventory reaching or exceeding the minimum amount required to ensure seven days of operation. Therefore, the calculated 3%
margin does not need to ensure available inventory for testing since separate testing margin is made available. Whereas, the minimum inventory in FO-1 for seven days of operation is 16,000 gallons, the administrative limit for ordering additional fuel for FO-1 from a fuel vendor is 16,500 gallons.
Since the fuel consumption calculation is intended to be a bounding calculation addressing anticipated worst case loading, and testing inventory is addressed separately, the 3% margin is concluded to be adequate for ensuring seven days of emergency operation.
In regard to the requirement to maintain a 10% margin in accordance with ANSI Standard N195-1976, it should be noted that FCS has not committed to maintaining a 10% margin in past licensing correspondence related to diesel fuel oil storage capacity.
LIC-16-0025 Attachment Page 4 RAI EPNB-4 In Section 3.0 of the submittal, it states that the EDG fuel consumption calculation was revised to address the use of Ultra Low Sulfur Diesel fuel. The American Society for Testing and Materials (ASTM) D-975 allows up to 5 percent biodiesel in normal diesel fuel oil without labeling. Please discuss whether or not the EDG fuel consumption calculation accounts for this 5 percent biodiesel in the fuel oil, which could cause an increase in EDG fuel consumption.
OPPD Response Fuel consumption calculations do not account for biodiesel in the determination of EDG fuel consumption, that is, it is assumed that there is no impact due to the reduced energy content of biodiesel. The basis for this assumption is as follows:
Fort Calhoun Station purchase requirements for diesel fuel used for supplying EDGs require the fuel vendor to meet a maximum specification for biodiesel content. This specification is 0.2%.
When fuel deliveries are made, tests of the delivered fuel are conducted prior to offloading the fuel from the delivery truck to ensure that the biodiesel and other quality specifications are met.
If all specifications are not met, the delivered fuel is either rejected or used in applications other than EDGs. (Reference OI-FO-1, Form FC-94, CH-ANL-MI-0034 and Diesel Fuel Catalog ID
- 127027-2) If the biodiesel content is 0.2%, the impact on overall fuel energy content is considered negligible.
RAI EPNB-5 In Section 4.0 of the submittal, it states that if 3,000 gallons (16,000 gallons FO-10 inventory minus 13,000 gallons dedicated to the EDG) of fuel oil in FO-10 is dedicated to the auxiliary boiler, its operating time is reduced to 20 hours2.314815e-4 days <br />0.00556 hours <br />3.306878e-5 weeks <br />7.61e-6 months <br /> at maximum fuel consumption rates. In Section 3.0, it states that, in 2002, it was recognized that the auxiliary feedwater pump diesel engine consumes fuel oil from the FO-10 tank. Please explain how the auxiliary feedwater pump diesel engine fuel oil consumption is accounted for if is not included in the 3,000 gallons of fuel oil dedicated to the auxiliary boiler.
OPPD Response Engineering Calculation FC06871 determines the amount of diesel fuel that is available for EDG usage for the purpose of meeting the seven day diesel operating requirement. FC06871 accounts for various effects that may reduce the amount of available fuel including instrument uncertainty, vortexing and fuel unavailability due to elevation of the transfer pump suction valve.
This calculation also accounts for the possible operation of diesel-driven auxiliary feedwater pump FW-54 for the purpose of supplying power to transfer pump FO-37 during the transfer of fuel from FO-10 to FO-1. The calculation assumes that the diesel providing the motive force for FW-54 is operating the entire time that FO-37 is operating for fuel transfer resulting in the determination that 568 gallons of inventory is diverted from FO-10 for FW-54 operation and therefore is not available for transfer to FO-1. This diverted fuel is accounted for in the overall available quantity of fuel for EDG operation.
LIC-16-0025 Attachment Page 5 RAI EPNB-6 In Section 4.0 of the submittal, it states that the auxiliary boiler is not specifically credited for operation to mitigate design basis events. If it is not credited for operation to mitigate design basis events, please explain why fuel oil in tank FO-10 is reserved for the auxiliary boiler and cannot be reserved for the EDG.
OPPD Response Even though the auxiliary boiler is not formally credited for operation during a design basis event, it is likely that it would be operated soon after the start of the event if outside air temperature is in a range normally expected in the winter season. This conclusion is based on the fact that most areas within the plant are heated solely by the auxiliary steam system which is supplied from the auxiliary boiler when the main turbine is not operating. Since there are no procedures to prohibit auxiliary boiler operation or restrict boiler loading during a design basis event coincident with an extended loss of offsite power, it is necessary to assume that FO-10 would be supplying both the operating EDG and the auxiliary boiler during such a scenario.
In the original license amendment request for crediting FO-10 to support the seven day EDG operating period (OPPD Letter LIC-93-0093, dated September 17, 1993, requested for Technical Specification Amendment 162), only 8,000 gallons in FO-10 was allocated for EDG operation. The amendment request specifically stated that the remaining fuel in FO-10, i.e., the remaining 8,000 gallons, would be able to operate the auxiliary boiler for 53 hours6.134259e-4 days <br />0.0147 hours <br />8.763227e-5 weeks <br />2.01665e-5 months <br /> without impacting the EDG minimum operating time. With the current license amendment request (LAR 15-06), the fuel allocated for auxiliary boiler operation is reduced to 3,000 gallons. This amount of fuel is still considered acceptable with the understanding that, during an extended loss of offsite power, diesel fuel conservation would be considered a high priority for the emergency response organization which would focus on ways to reduce fuel consumption by the auxiliary boiler, if it is operating.