MONTHYEARLIC-04-0076, License Amendment Request, Application for Technical Specification Improvement to Eliminate Requirements for Hydrogen Monitors Using the Consolidated Line Item Improvement Process.2004-09-0808 September 2004 License Amendment Request, Application for Technical Specification Improvement to Eliminate Requirements for Hydrogen Monitors Using the Consolidated Line Item Improvement Process. Project stage: Request ML0508402652005-03-22022 March 2005 3/22/05 Fort Calhoun Station Unit 1 - Issuance of Amd. 234 Elimination of Requirements for Hydrogen Monitors Using the Consolidated Line Item Improvement Process. (Tac. MC4305) Project stage: Approval ML0508404912005-03-22022 March 2005 2 Pages Fort Calhoun - for Amd. 234. Elimination of Requirements for Hydrogen Monitors Using the Consolidated Line Item Improvement Process (Tac. MC4305) Project stage: Other LIC-05-0075, Response to Request for Additional Information on the License Amendment Request, Revisions of Technical Specifications Table 1-1 and Section 4.0.2005-07-0808 July 2005 Response to Request for Additional Information on the License Amendment Request, Revisions of Technical Specifications Table 1-1 and Section 4.0. Project stage: Response to RAI LIC-05-0098, License Amendment Request (Lar), Deletion of Shutdown Margin Surveillance Requirement and Miscellaneous Administrative Changes.2005-08-11011 August 2005 License Amendment Request (Lar), Deletion of Shutdown Margin Surveillance Requirement and Miscellaneous Administrative Changes. Project stage: Request LIC-05-0070, License Amendment Request, Application for Technical Specification Improvement to Add LC0 2.0.1(3) on the Inoperability of Snubbers Using the Consolidated Line Item Improvement Process.2005-08-11011 August 2005 License Amendment Request, Application for Technical Specification Improvement to Add LC0 2.0.1(3) on the Inoperability of Snubbers Using the Consolidated Line Item Improvement Process. Project stage: Request ML0525105042005-08-31031 August 2005 Framatome Anp, Inc 77-5069740-NP-00, Shearon Harris Criticality Evaluation. Project stage: Request ML0525105022005-09-0101 September 2005 Request for License Amendment to Credit Soluble Boron for Fuel Storage Pools Project stage: Request ML0516802672005-10-0303 October 2005 Issuance of License Amendment 236 Conversion of TS Section 4.0 to STS Format Project stage: Approval ML0528003522005-10-0303 October 2005 Tech Spec Pages for Amendment 236 Conversion of TS Section 4.0 to STS Format Project stage: Other ML0606902832006-02-0101 February 2006 Technical Specifications, Deletion of Shutdown Margin During Low Power Testing from TS and Various Other Editorial and Administrative Changes Project stage: Acceptance Review ML0527005232006-02-0101 February 2006 License Amendment, Deletion of Shutdown Margin During Low Power Testing from TS and Various Other Editorial and Administrative Changes Project stage: Other ML0606703202006-03-0101 March 2006 License Amendment 238 Regarding Inoperability of Snubbers Project stage: Approval ML0606902822006-03-0101 March 2006 Tech Spec Pages for Amendment 238 Regarding Inoperability of Snubbers Project stage: Other LIC-06-0029, Commitment to Fuel Storage Area Radiation Monitoring for 10 CFR 50.68(b)2006-03-17017 March 2006 Commitment to Fuel Storage Area Radiation Monitoring for 10 CFR 50.68(b) Project stage: Request LIC-06-0023, Response to Requests for Additional Information and Revision of Fort Calhoun Station Unit No. 1 License Amendment Request, Criticality Control During Spent Fuel Cask Loading in the Spent Fuel Pool.2006-03-27027 March 2006 Response to Requests for Additional Information and Revision of Fort Calhoun Station Unit No. 1 License Amendment Request, Criticality Control During Spent Fuel Cask Loading in the Spent Fuel Pool. Project stage: Response to RAI ML0610100482006-04-10010 April 2006 Tech Spec Pages for Amendment 239 Regarding Adding Limits and Controls for the Spent Fuel Cask Loading and Unloading Operations in the Spent Fuel Pool Project stage: Acceptance Review ML0610006062006-04-10010 April 2006 Issuance of License Amendment 239 Regarding Adding Limits and Controls for the Spent Fuel Cask Loading and Unloading Operations in the Spent Fuel Pool Project stage: Approval LIC-06-0065, Closure of NRC TAC Issues for Fort Calhoun Station Unit No. 12006-07-0606 July 2006 Closure of NRC TAC Issues for Fort Calhoun Station Unit No. 1 Project stage: Other 2005-09-01
[Table View] |
|
---|
Category:Letter type:LIC
MONTHYEARLIC-24-0007, License Amendment Request (LAR) to Revise License Termination Plan (LTP)2024-06-18018 June 2024 License Amendment Request (LAR) to Revise License Termination Plan (LTP) LIC-24-0008, Proposed Revision to the Omaha Public Power District (OPPD) Fort Calhoun Station (FCS) Decommissioning Quality Assurance Plan (Dqap), Unit No. 1 and ISFSI2024-05-16016 May 2024 Proposed Revision to the Omaha Public Power District (OPPD) Fort Calhoun Station (FCS) Decommissioning Quality Assurance Plan (Dqap), Unit No. 1 and ISFSI LIC-24-0003, Independent Spent Fuel Storage Installation - Radiological Effluent Release Report and Radiological Environmental Operating Report2024-04-25025 April 2024 Independent Spent Fuel Storage Installation - Radiological Effluent Release Report and Radiological Environmental Operating Report LIC-24-0006, (Fcs), Unit 1, Independent Spent Fuel Storage Installation, Phase 1 Final Status Survey Report to Support Approved License Termination Plan2024-04-17017 April 2024 (Fcs), Unit 1, Independent Spent Fuel Storage Installation, Phase 1 Final Status Survey Report to Support Approved License Termination Plan LIC-23-0007, Response to Fort Calhoun, Unit 1 & Independent Spent Fuel Storage Installation Review of License Amendment Request to Add License Condition to Include License Termination Plan Requirements Request for Additional Information2023-12-0606 December 2023 Response to Fort Calhoun, Unit 1 & Independent Spent Fuel Storage Installation Review of License Amendment Request to Add License Condition to Include License Termination Plan Requirements Request for Additional Information LIC-23-0005, Response to Fort Calhoun Station, Unit No. 1 - Review of License Amendment Request to Add License Condition to Include License Termination Plan Requirements - 2nd Request for Additional Information (EPID L-2021-LIT-0000) June 2, 20232023-08-24024 August 2023 Response to Fort Calhoun Station, Unit No. 1 - Review of License Amendment Request to Add License Condition to Include License Termination Plan Requirements - 2nd Request for Additional Information (EPID L-2021-LIT-0000) June 2, 2023 LIC-23-0004, (FCS) Radiological Effluent Release Report and Radiological Environmental Operating Report2023-04-20020 April 2023 (FCS) Radiological Effluent Release Report and Radiological Environmental Operating Report LIC-23-0003, Annual Decommissioning Funding / Irradiated Fuel Management Status Report2023-03-15015 March 2023 Annual Decommissioning Funding / Irradiated Fuel Management Status Report LIC-23-0001, Response to Fort Calhoun Station, Unit No. 1 - Review of License Amendment Request to Add License Condition to Include License Termination Plan Requirements - Request for Additional Information2023-02-27027 February 2023 Response to Fort Calhoun Station, Unit No. 1 - Review of License Amendment Request to Add License Condition to Include License Termination Plan Requirements - Request for Additional Information LIC-23-0002, Independent Spent Fuel Storage Installation, Annual Radioactive Effluent Release Report2023-02-20020 February 2023 Independent Spent Fuel Storage Installation, Annual Radioactive Effluent Release Report LIC-22-0010, Response to Fort Calhoun Station, Unit No. 1 - Review of License Termination Plan Requirements - Request for Additional Information2022-06-15015 June 2022 Response to Fort Calhoun Station, Unit No. 1 - Review of License Termination Plan Requirements - Request for Additional Information LIC-22-0005, (FCS) Radiological Effluent Release Report and Radiological Environmental Operating Report2022-04-20020 April 2022 (FCS) Radiological Effluent Release Report and Radiological Environmental Operating Report LIC-22-0009, Annual Decommissioning Funding / Irradiated Fuel Management Status Report2022-03-30030 March 2022 Annual Decommissioning Funding / Irradiated Fuel Management Status Report LIC-22-0006, Reactor Head Disposition Project Overview2022-03-17017 March 2022 Reactor Head Disposition Project Overview LIC-22-0004, Independent Spent Fuel Storage Installation, Annual Radioactive Effluent Release Report2022-02-17017 February 2022 Independent Spent Fuel Storage Installation, Annual Radioactive Effluent Release Report LIC-21-0008, Organizational and Management Change2021-10-28028 October 2021 Organizational and Management Change LIC-21-0007, ISFSI Only Emergency Plan Update2021-09-0808 September 2021 ISFSI Only Emergency Plan Update LIC-21-0004, Radiological Effluent Release Report and Radiological Environmental Operating Report2021-04-29029 April 2021 Radiological Effluent Release Report and Radiological Environmental Operating Report LIC-21-0003, Independent Spent Fuel Storage Installation - 2021 Annual Decommissioning Funding / Irradiated Fuel Management Status Report2021-03-30030 March 2021 Independent Spent Fuel Storage Installation - 2021 Annual Decommissioning Funding / Irradiated Fuel Management Status Report LIC-21-0002, Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report2021-02-22022 February 2021 Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report LIC-20-0015, Correction to Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report 2019 (ML20121A092)2020-07-29029 July 2020 Correction to Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report 2019 (ML20121A092) LIC-20-0014, Submittal of Revision 8 to the Fort Calhoun Station (Fcs), Physical Security Plan (PSP)2020-07-15015 July 2020 Submittal of Revision 8 to the Fort Calhoun Station (Fcs), Physical Security Plan (PSP) LIC-20-0012, Independent Spent Fuel Storage Installation (ISFSI) Cask Registration and Certification of Permanent Removal of All Spent Fuel Assemblies from the Spent Fuel Pool2020-05-18018 May 2020 Independent Spent Fuel Storage Installation (ISFSI) Cask Registration and Certification of Permanent Removal of All Spent Fuel Assemblies from the Spent Fuel Pool LIC-20-0011, Independent Spent Fuel Storage Installation (ISFSI) Cask Registration2020-05-0707 May 2020 Independent Spent Fuel Storage Installation (ISFSI) Cask Registration LIC-20-0009, (FCS) Radiological Effluent Release Report and Radiological Environmental Operating Report2020-04-30030 April 2020 (FCS) Radiological Effluent Release Report and Radiological Environmental Operating Report LIC-20-0008, Independent Spent Fuel Storage Installation (ISFSI) Cask Registration2020-04-13013 April 2020 Independent Spent Fuel Storage Installation (ISFSI) Cask Registration LIC-20-0006, (Fcs), Unit 1, Request for Exemption from 10 CFR 20, Appendix G, Section Iii.E2020-03-26026 March 2020 (Fcs), Unit 1, Request for Exemption from 10 CFR 20, Appendix G, Section Iii.E LIC-20-0004, Independent Spent Fuel Storage Installation (ISFSI) Cask Registration2020-03-10010 March 2020 Independent Spent Fuel Storage Installation (ISFSI) Cask Registration LIC-20-0002, Independent Spent Fuel Storage Installation - Submittal of Revision 7 to Physical Security Plan2020-02-27027 February 2020 Independent Spent Fuel Storage Installation - Submittal of Revision 7 to Physical Security Plan LIC-20-0003, Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report2020-02-27027 February 2020 Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report LIC-20-0001, Independent Spent Fuel Storage Installation (ISFSI) Cask Registration2020-02-0606 February 2020 Independent Spent Fuel Storage Installation (ISFSI) Cask Registration LIC-19-0025, Independent Spent Fuel Storage Installation (ISFSI) Cask Registration2019-12-19019 December 2019 Independent Spent Fuel Storage Installation (ISFSI) Cask Registration LIC-19-0007, Post-Shutdown Decommissioning Activities Report2019-12-16016 December 2019 Post-Shutdown Decommissioning Activities Report LIC-19-0021, Independent Spent Fuel Storage Installation - Response to Request for Additional Information License Amendment for ISFSI-only EP and EAL Scheme2019-11-20020 November 2019 Independent Spent Fuel Storage Installation - Response to Request for Additional Information License Amendment for ISFSI-only EP and EAL Scheme LIC-19-0022, Independent Spent Fuel Storage Installation (ISFSI) Cask Registration2019-11-18018 November 2019 Independent Spent Fuel Storage Installation (ISFSI) Cask Registration LIC-19-0018, Submittal of Revision 6 to the Fort Calhoun Station (Fcs), Physical Security Plan (PSP)2019-11-14014 November 2019 Submittal of Revision 6 to the Fort Calhoun Station (Fcs), Physical Security Plan (PSP) LIC-19-0020, Independent Spent Fuel Storage Installation - Updated Information Submittal and Revision 1 of the Blast Analysis2019-10-17017 October 2019 Independent Spent Fuel Storage Installation - Updated Information Submittal and Revision 1 of the Blast Analysis LIC-19-0017, Clarification to Revised Response to Orders for Interim Safeguards and Security Compensatory Measures and Implementation of Additional Security Measures Associated with Access Authorization for Fort Calhoun Station Dated 9 November, 20042019-08-0808 August 2019 Clarification to Revised Response to Orders for Interim Safeguards and Security Compensatory Measures and Implementation of Additional Security Measures Associated with Access Authorization for Fort Calhoun Station Dated 9 November, 2004 An LIC-19-0010, License Amendment Request (LAR) 19-03; Revised Fort Calhoun Station License in Support of the Revised Response to Orders for Interim Safeguards and Security Compensatory Measures and Implementation of Additional Security Measures Associa2019-05-20020 May 2019 License Amendment Request (LAR) 19-03; Revised Fort Calhoun Station License in Support of the Revised Response to Orders for Interim Safeguards and Security Compensatory Measures and Implementation of Additional Security Measures Associated LIC-19-0008, Submittal of 2018 Annual Report2019-04-0404 April 2019 Submittal of 2018 Annual Report LIC-19-0004, Independent Spent Fuel Storage Installation - Submittal of Revision 4 to Physical Security Plan (PSP)2019-03-28028 March 2019 Independent Spent Fuel Storage Installation - Submittal of Revision 4 to Physical Security Plan (PSP) LIC-19-0005, 2019 Annual Decommissioning Funding I Irradiated Fuel Management Status Report2019-03-28028 March 2019 2019 Annual Decommissioning Funding I Irradiated Fuel Management Status Report LIC-19-0001, License Amendment Request (LAR) 19-01: Independent Spent Fuel Storage Installation (ISFSI) Emergency Plan and Emergency Action Level Scheme2019-02-28028 February 2019 License Amendment Request (LAR) 19-01: Independent Spent Fuel Storage Installation (ISFSI) Emergency Plan and Emergency Action Level Scheme LIC-19-0003, Revised Response to Orders for Interim Safeguards and Security Compensatory Measures and Implementation of Additional Security Measures Associated with Access Authorization for Fort Calhoun Station Dated 9 November, 2004 and Relaxation R2019-02-28028 February 2019 Revised Response to Orders for Interim Safeguards and Security Compensatory Measures and Implementation of Additional Security Measures Associated with Access Authorization for Fort Calhoun Station Dated 9 November, 2004 and Relaxation Requ LIC-19-0002, Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report2019-01-0303 January 2019 Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report LIC-18-0031, Independent Spent Fuel Storage Installation - Transmittal of Emergency Plan Update2018-12-17017 December 2018 Independent Spent Fuel Storage Installation - Transmittal of Emergency Plan Update LIC-18-0030, Request for Partial Site Release Phase 22018-11-12012 November 2018 Request for Partial Site Release Phase 2 LIC-18-0028, Letter of Intent to Submit Request for Additional Partial Site Release2018-10-18018 October 2018 Letter of Intent to Submit Request for Additional Partial Site Release LIC-18-0027, Submittal of Foreign Ownership, Control or Influence Five-Year Renewal Filing and NRC Facility Clearance Update2018-10-0303 October 2018 Submittal of Foreign Ownership, Control or Influence Five-Year Renewal Filing and NRC Facility Clearance Update LIC-18-0003, License Amendment Request (LAR) 18-01; Revised Fort Calhoun Station Permanently Defueled Technical Specifications to Align to Those Requirements for Permanent Removal of Spent Fuel from Spent Fuel Pool2018-09-28028 September 2018 License Amendment Request (LAR) 18-01; Revised Fort Calhoun Station Permanently Defueled Technical Specifications to Align to Those Requirements for Permanent Removal of Spent Fuel from Spent Fuel Pool 2024-06-18
[Table view] |
Text
Omaha Public Power District 444 South 16th Street Mall Omaha NE 68102-2247 March 17,2006 LIC-06-0029 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001
References:
- 1. Docket Nos. 50-285 and 72-054
- 2. USNRC Regulatory Issue Summary 2005-05, "Regulatory Issues Regarding Criticality Analyses for Spent Fuel Pools and Independent Spent Fuel Storage Installations," March, 23, 2005
- 3. Letter from OPPD (R. T. Ridenoure) to NRC (Document Control Desk), "Fort Calhoun Station Unit No. 1 License Amendment Request (LAR)05-013, "Criticality Control During Spent Fuel Cask Loading in the Spent Fuel Pool,"
November 8,2005 (LIC-05-0119)
- 4. Telecon between OPPD and NRC, Request for Additional Information for Fort Calhoun Station Unit No. 1 License Amendment Request, "Criticality Control During Spent Fuel Cask Loading in the Spent Fuel Pool," March 3, 2006
- 5. Letter from NRC (R. Wharton) to OPPD (Sudesh Gambhir), "Issuance of Exemption from the Requirements of 10 CFR 70.24 -Fort Calhoun Station, Unit No. 1" (TAC No. M99544) (NRC-98-026)
SUBJECT:
Commitment to Fuel Storage Area Radiation Monitoring for 10 CFR 50.68(b)
In accordance with Reference 2, the Omaha Public Power District (OPPD) previously submitted a License Amendment Request (Reference 3) to address criticality control during spent fuel cask loading in the spent he1 pool. During subsequent discussions with the staff concerning compliance with Reference 2, the broader issue of compliance with 10 CFR 50.68(b) was discussed. Based on the discussion held on March 3, 2006 (Reference 4) the staff requested: (1)
OPPD commitment to full compliance with 50.68 at Fort Calhoun Station, and (2) submittal of an evaluation of OPPD's current status of compliance with 50.68.
Employment with Equal Opportunity
U. S. Nuclear Regulatory Commission LIC-06-0029 Page 2 The Fort Calhoun Station (FCS) 50.68 Compliance Evaluation is attached to this letter. The evaluation concludes that FCS complies with all but two 50.68(b) criteria: Criterion (6),
criticality monitoring of fuel storage areas, and Criterion (8), FSAR updating after compliance with 50.68 has been achieved.
To comply with 10 CFR 50.68(b)(6), OPPD will establish the capabilities: (1) to detect excessive radiation levels in fuel storage and associated fuel handling areas when fuel is present, and (2) to initiate appropriate safety actions for those areas. These capabilities will be implemented and the FCS Updated Safety Analysis Report will be updated placing FCS in compliance with all 50.68(b) criteria within six months after the completion of the 2006 outage. The 2006 outage is scheduled to end December 7,2006.
One commitment to the NRC is made in this letter, i.e., to be in full compliance with all 50.68(b) criteria within six months after the completion of the 2006 outage. I declare under penalty of perjury that the foregoing is true and correct. (Executed March 17,2006)
If you have any questions or require additional information, please contact Mr. Thomas C.
Matthews at 402-533-6938.
Sincerely, D. J. Bannister Manager - Fort Calhoun Station
Attachment:
OPPD Fort Calhoun Station (FCS) Evaluation of Current Compliance with 10 CFR 50.68(b) cc: Director of Consumer Health Services, Department of Regulation and Licensure, Nebraska Health and Human Services, State of Nebraska
LIC-06-0029 Attachment Page 1 Fort Calhoun Station (FCS)
Evaluation of Current Compliance with 10 CFR 50.68(b) 10 CFR 50.68@) Each licensee shall comply with the following requirements in lieu of maintaining a monitoring system capable of detecting a criticality as described in 10 CFR 70.24:
(I) Plant procedures shall prohibit the handling and storage at any one time of more fuel assemblies than have been determined to be safely subcritical under the most adverse moderation conditionsfeasible by unborated water.
OPPD complies with this criterion. FCS procedures are based on the design basis numbers of fuel assemblies assumed in analyses for the new fuel and spent fuel storage racks.
(2) The estimated ratio of neutron production to neutron absorption and leakage (k-effective) of the fresh fuel in the fresh fuel storage racks shall be calculated assuming the racks are loaded with fuel of the maximum fuel assembly reactivity and flooded with unborated water and must not exceed 0.95, at a 95 percent probability, 95 percent confidence level. This evaluation need not be performed if administrative controls and/or design features prevent such flooding or if fresh fuel storage racks are not used.
OPPD complies with this criterion for fresh fuel stored in the fresh fuel storage racks. (This criterion is not applicable for fresh fuel subsequently stored in the spent fuel storage racks.)
(3) If optimum moderation of fresh fuel in the fresh fuel storage racks occurs when the racks are assumed to be Ioaded with fuel of the maximum fuel assembly reactivity and filled with low-density hydrogenous fluid, the k-effective corresponding to this optimum moderation must not exceed 0.98, at a 95 percent probability, 95 percent confidence level. This evaluation need not be performed if administrative controls and/or design features prevent such moderation or if fresh fuel storage racks are not used.
OPPD complies with this criterion for fresh fuel stored in the fresh fuel storage racks. (This criterion is not applicable for fresh fuel subsequently stored in the spent fuel storage racks.)
(4) I f no credit for soluble boron is taken, the k-effective of the spent fuel storage racks Ioaded with fuel of the maximum fuel assembly reactivity must not exceed 0.95, at a 95 percent probability, 95 percent confidence level, ifjlooded with unborated water. I f credit is taken for soluble boron, the k-effective of the spent fuel storage racks Ioaded with fuel of the maximum fuel assembly reactivity must not exceed 0.95, at a 95 percent probability, 95 percent confidence level, ifjlooded with borated water, and the k-effective must remain below 1.0 (subcritical), at a 95 percent probability, 95 percent confidence level, ifflooded with unborated water.
OPPD complies with the applicable criterion if credit is taken for soluble boron.
LIC-06-0029 Attachment Page 2 (5) The quantity of SNM, other than nuclear fuel stored onsite, is less than the quantity necessary for a critical mass.
OPPD complies with this criterion based on the SNM, other than nuclear fuel, currently stored at FCS.
(6) Radiation monitors are provided in storage and associated handling areas when fuel is present to detect excessive radiation levels and to initiate appropriate safety actions.
OPPD does not fully comply with this criterion at FCS. Radiation monitors are provided near the new fuel receipt area and adjacent to the spent fuel pool. However, there is no provision for a radiation monitor in the new fuel storage rack area. OPPD will need to perform evaluations and modifications necessary to fully comply with this criterion. Fuel storage and handling operations until that time are acceptable because of the bases for the exemption to 10 CFR 70.24 requirements granted by the NRC for Fort Calhoun Station in a letter dated February 6, 1998.
These bases include compliance with FCS Technical Specifications, the geometric spacing of fuel assemblies in the new fuel storage racks and spent fuel pool, and administrative controls imposed on fuel handling procedures. Also, the lack of sprinklers and permanently stored combustible materials in the new fuel receiptlstorage room means that moderation due to fire suppression water is unlikely. Even if fire suppression water is introduced, sufficient drainage exists to preclude potential moderation of new fuel assemblies. There have been no changes to the licensing or design bases of FCS that negate the bases for the exemption.
(7) The maximum nominal U-235 enrichment of the fresh fuel assemblies is limited t o j v e (5.0) percent by weight.
OPPD complies with this criterion. The FCS Technical Specifications contain this limit for fresh fuel in the new fuel storage racks, and contain a limit of 4.5 percent by weight for fuel stored in the spent fuel pool.
(8) The FSAR is amended no later than the next update which $ 50.71 (e) of this part requires, indicating that the licensee has chosen to comply with $50.68(b).
OPPD does not comply with this criterion because FCS is not yet in full compliance with all the other criteria of 50.68(b).