C-E Power Systems Tel 203/688-1911 Combustion Engineenng. Inc.
Telex 99297 1000 Prospect Hill Road Windsor Connecticut 06095 H POWER SYSTEMS
\\
N p ), M % '%g Docket No.:
STN-50-470F April 19, 1982 c
\\
C
\\
Q p[ Y,e%,,g/s Mr., Robert L. Tedesco, Assistant Director k
D Division of Licensing
@MM G
V. S. Nuclear Regulatory Commission g
Washington, D. C.
20555 0'
(b
Subject:
Rapid Depressurization and Decay Heat Removal Capability
References:
(A)
Letter to A. E. Scherer to D. G. Eisenhut, LD-82-029, dated fiarch 4, 1982 (B)
Letter R. L. Tedesco to A. E. Scherer, dated March 26, 1982
Dear fir. Tedesco:
Combustion Engineering (C-E) provided in Reference (A) the results of a CESSAR design review which concluded that its rapid depressurization and decay heat removal capabilities were sufficient.
Subsequently the Staff requested addi-tional information in Reference (B) in order to complete their consideration of the potential for adding valves of a size to facilitate a more rapid depressur-ization of the CESSAR reactor coolant system.
Several questions in the requested information will require an extensive period of time to adequately respond.
C-E is working with the C-E Owners Group (CE0G) to define a program to respond to these questions and the program will be con-sidered at the next CE0G meeting. At that time a scope and schedule should be agreed upon by C-E and C-E plant owners.
Although C-E prefers one formal inte-grated response, interim review meetings can be held between C-E and the NRC Staff to ensure that C-E is pursuing an acceptable approach towards providing the requested information.
In any event C-E will provide you with a submittal next month which will con-tain a basis for continued licensing of the CESSAR design. The C-E submittal will justify continued CESSAR-F licensiig and plant operation until this matter is completely resolved.
If I can be of any additional assistance in this matter, please contact me or Mr. G. A. Davis of my staff at (203)688-1911, Extension 2803.
Very truly yours, g
C0f18USTION ENGI
_ RING, INC.
Ib S ierer 8204220280 920419 Director PDR ADOCK 05000470 Nuclear Licensing A
PDR AES:ctk