L-PI-17-016, Independent Spent Fuel Storage Installation - NRC Regulatory Issue Summary 2016-09, Preparation and Scheduling of Operator Licensing Examinations

From kanterella
(Redirected from L-PI-17-016)
Jump to navigation Jump to search
Independent Spent Fuel Storage Installation - NRC Regulatory Issue Summary 2016-09, Preparation and Scheduling of Operator Licensing Examinations
ML17088A790
Person / Time
Site: Prairie Island  Xcel Energy icon.png
Issue date: 03/29/2017
From: Northard S
Northern States Power Company, Minnesota, Xcel Energy
To:
Document Control Desk, Office of Nuclear Material Safety and Safeguards, Office of Nuclear Reactor Regulation
References
L-PI-17-016, RIS-16-009
Download: ML17088A790 (1)


Text

1717 Wakonade Drive Welch, MN 55089 Xcel Energy@

RESPONSIBLE BY NATURE 800.895.4999 xcelenergy.com MAR 2 9 2017 L-PI-17-016 RIS 2016-09 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Prairie Island Nuclear Generating Plant, Units 1 and 2 Docket Nos. 50-282 and 50-306 Renewed Facility Operating License Nos. DPR-42 and DPR-60 Prairie Island Independent Spent Fuel Storage Installation Docket 72-10 Renewed Materials License No. SNM-2506 NRC Regulatory Issue Summary 2016 Preparation and Scheduling of Operator Licensing Examinations As requested by NRC Regulatory Issue Summary 2016-09, "Preparation and Scheduling of Operator Licensing Examinations", dated June 16, 2016, Northern States Power Company, a Minnesota corporation, submitted L-PI-16-064 which requested licensing examination dates of 9/17/2018 and 9/24/2018 for CY2018. The NRC agreed to this schedule in a letter dated 12/20/2016.

Due to the Outage schedule (which will impact the Simulator), Northern States Power Company is requesting new licensing examination dates of 9/4/2018 and 9/10/2018 for CY2018.

Summary of Commitments This letter makes no new commitments or changes to any existing commitments.

~~

Scott Northard Site Vice President, Prairie Island Nuclear Generating Plant Northern States Power Company- Minnesota Enclosure cc: Raymond K. Walton, Chief Examiner, NRC Region Ill Administrator, Region Ill, USNRC Project Manager, Prairie Island, USNRC Resident Inspector, Prairie Island, USNRC