L-91-087, Forwards Feb 1991 Six Month Integrated Schedule Regulatory Rept for Turkey Point Plant
| ML17345A777 | |
| Person / Time | |
|---|---|
| Site: | Turkey Point |
| Issue date: | 03/27/1991 |
| From: | Plunkett T FLORIDA POWER & LIGHT CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| L-91-087, L-91-87, NUDOCS 9104020144 | |
| Download: ML17345A777 (35) | |
Text
ACCELERATED DI TRIBUTION DEMONS TION SYSTEM REGULATORY XNFORMATION DXSTRIBUTION SYSTEM (RXDS)
ACCESSION NBR: 9104020144 DOC. DATE: 91/03/27 NOTARIZED:
NO FACIL:50-250 Turkey Point Plant, Unit 3, Florida Power and.Light C 50-251 Turkey Point Plant, Unit 4, Florida Power and Light C AUTH.NAME AUTHOR AFFXLIATXON PLUNKETT,T.F.
Florida Power
& Light Co.
RECIP.NAME RECXPIENT AFFILIATION Document Control Branch (Document Control Desk)
SUBJECT:
Forwards Feb 1991 six month integrated schedule regulatory rept, for Turkey Point Plant.
DISTRIBUTION CODE:
A001D COPIES RECEIVED:LTR ENCL SIZE:
TITLE: OR Submittal:
General Distribution NOTES:
DOCKET 05000250 05000251 D
$ i RECIPIENT ID CODE/NAME PD2-2 LA AULUCK,R XNTERNAL: NRR/DET/ECMB 9H NRR/DOEA/OTSB11 NRR/DST/SELB SD NRR/DST/SRXB SE OC G FX E 01 EXTERNAL: NRC PDR COPXES LTTR ENCL 1
1 2
2 1
1 1
- 1 1
1 1
1 1
0 1
1 RECIPIENT ID CODE/NAME PD2-2 PD NRR/DET/ESGB NRR/DST SE2 NRR/DST/SICB 7E NUDOCS-ABSTRACT OGC/HDS3 RES/DS IR/EIB NSIC COPIES LTTR ENCL 1
1 1
1 1
1 1
1 1
1 1
0 1
1 D
D
.D NOTE TO ALL"RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WARM CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 20079) TO ELIMINATEYOUR NAMEFROM-DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!
TOTAL NUMBER OF COPXES REQUIRED:
LTTR 18 ENCL 16 A
-D
=
D
I I
1 I
r qO lf
'I I
I 1
P.O. Box 029100, Miami, FL, 33102-9100 MAR Rv 1991 L-91-087 U. S. Nuclear Regulatory Commission Attn:
Document Control Desk Washington, D.
C.
20555 Gentlemen:
Re:
Turkey Point Units 3 and 4
Docket Nos.
50-250 and 50-251 Inte rated Schedule 6-Month Re ulato Re ort Attached is the February 1991 Six Month Integrated Schedule (I/S).
Regulatory Report for the Turkey Point Plant.
The schedules discussed in this report reflect information updated since the August 1990 Regulatory Report which was provided to the NRC on September 27, 1990 (L-90-345).
Changes of interest to the NRC discussed in this report have been reviewed with the NRC Project Manager for the Turkey Point Plant in accordance with the Integrated Schedule Plan.
Should there be any questions regarding this report, please contact us
~
Very truly yours, T. F. Plunkett Vice President Turkey Point Plant Nuclear TFP/RJT/rjt Attachment cc:
Stewart D. Ebneter, Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, Turkey Point Plant
<..)378 9i04020i44 910327 PDR ADOCK 05000250 R
/g(
'LI t(!,.f )'! V'(~<~
II
ATTACHMENT I The following is a
summary of the I/S modifications for the Six Month Integrated Schedule Regulatory Report.
The February 1991 Integrated Schedule is based on the following outages:
OUTAGE DESCRIPTION START FINISH Unit 3 Unit 3 Unit 3 Unit 4 Unit 4 Unit 4 Diesel Tie-in Cycle 13 Refueling Cycle 14 Refueling Cycle 13 Refueling Cycle 14 Refueling Cycle 15 Refueling 12/11/90 08/22/92 04/01/94 11/25/90 04/0 1/93 10/01/94 10/04/91 12/04/92 06/03/94 11/05/91 06/03/93 12/03/94 Changes to the Integrated Schedule since the last issue to the NRC, August 1990 (L-90-345 dated September 27, 1990) are as follows:
MODIFICATIONS ADDED 793 794 1362 1363 1364 1365 1366 1368 1369 1370 1371 1372 DESCRIPTION 3 REPL 480V MCC 3E DUE TO CORROSION 4 REPL 480V MCC 4E DUE TO CORROSION 3 RESTRAINT MOD PORV DISCHRG LINE 4 RESTRAINT MOD PORV DISCHRG LINE C MISSILE PROT EVAL PLT EXT DOORS 3
IMPROVE HOTWELL DRAINAGE 4
IMPROVE HOTWELL DRAINAGE 3 REPL MOV-535/536 ACTUATORS 4 REPL MOV-535/536 ACTUATORS 3
CONTAINMENT PRMS R-11 6 R-12 REPL 4
CONTAINMENT PRMS R-11 6 R-12 REPL C CONTROL ROOM HVAC CONTROL MOD LIC CAT FPL FPL NRR NRR FPL FPL FPL FPL FPL FPL FPL FPL MODIFICATIONS CANCELLED 952 1001 1293 1294 1359 DESCRIPTION C EDG LUBE OIL MODIFICATIONS C EXISTING "B" EDG IDLE START/STOP 3 CTL LD METERS-ADD UNITS/CHA SCALE 4 CTL LD METERS-ADD UNITS/CHA SCALE C FLOOD PROTECTN 4.16 SWCHGR ROOMS LIC CAT FPL FPL NRR NRR FPL
~ ~
< g, ~
MODIFICATIONS COMPLETED
~IS 50 67 293 396 417 418 422 549 744 787 792 1244 1262 1280 1310 1355 1360 DESCRIPTION 3
MSR MODERNIZATION REPLACEMENT 4 REPLACE LOW PRESSURE ROTORS 3
SGWL CNTMT ISOLAT'N VLV REPLACEMENT S
BOUNDARIES FOR VISUAL LEAK INSP 3 REPL CCW HX THERMOMETERS W/RTD'S 4 REPL TUBE SIDE CCW HX TIS W/RTD'S 3 MAIN STM SAFETY LIFTING LEVERS 3 ADD'L CNTMT ELECT PENETRATIONS 4
SFP BRIDGE CRANE REPLACEMENT C INSTALL BARRIERS IN HVAC DUCTS S
CNTRL ROOM LIGHTING EVALUATION 4 4160V SWGR CNTRL MOD-ADD A DIODE 4 REPL EXTR STM CS PPG W/ CR MOLY 4
CCW HEAT EXCHANGER REPLACEMENT S
ICW PMP FDN SFTY HAZARD EVALUAT'N C EOP REVIEW REV 1 S
STORM STUDY/PLANT DRAINAGE EVAL LIC CAT FPL FPL FPL FPL FPL FPL FPL FPL FPL I&E NRR FPL FPL FPL FPL FPL FPL
fttlfCT ALNICAIS
~LOI CSO SAFA I
taft l
~
TLHACI SCINT lactfAC SLANT INTtCMIIO SCHIOIAC SL441OA SOslt AICI LICHT CO.
HOOC ITS I INTLAVAL I
VIAAISI TACCfI SCHtOLAC TA\\C I INISH IAAC DATA DATC 24 LSNATIL 24NOVtt
~LH ITNAAII 14 '
I FAOIICTS2
~ 442 scaltaat OAA cHAAT SIAAT FINISH CATA DA'lf 2 SANS 4 SOL CSS IISlatl TAACC I SCH COUL f LINC ttfAC OH NAC CLVOIIIHINT C*TICOAITS Lltfttttt OH CFO Sltl SVSIIH SCOT Stttal SCOOLS 4 CCS ff 1989 1990 1991 1992 1993 CFO POST TMI CONF I RMATORY MOOIF I CAT"N C AREA RADIATION MONIT"G SYST REPL CFO MOD 0341 18AUG89 P 23AUG91 I
I 5APRST P04 T11. 20 U4 SEL SYS MODSI REPAIRS C EDG AIR START MOTORS UPGRADE CFO MOD 0578 18JUL88 5ICW9 1 27APRS I POST PEP 4 RHR-INSTL UPGRADED 8" GL08E VLV CFO MOO 0585 SFE888 SNOVST 5MAR91 SCTTES 0
CSDDTLLL tfLC CDLOCTI42LT DAIE Lftttoif IOHZVIACE ISLC CLSDCTLEILT Da TE LISLKNT CLTTACE SILC CDLACTIMISTDATE'ATA OATF
I 1
q C
4'
t&OFKCT AINT CATS PI&I
&KO
~ACI I
KHffT I
TUKKKT t&INT f&FCIKAKttANT INIICAATKOSCINKANK f1&&I&A AOvf& Al&lI IIHT CO NIKN 1 flT INTf&VAI
~
VIA&I&I TAKCK't SCNtt&NS fA&C ~ INI &H
'IAAO OAIA OAII 1&
IFNATSS I\\N&VI&
&I&i ITNA&~ I I&
~I t&OIICTF\\
&&&1
&CHICA&f OA& CHAAI STAKT FINISH CATA OATF 1&AN&&
SINCSS ISTIC&I TAOCKTSCNKOUI K tACK O&KAK VAIUKT 1
&FO
~ INf O&FAF. ON N&C CIA&II'INfNTCAftCO<S SOOT KKKAKS OCCOKS \\
CUK tf 1989 1990 1991 1992 1993 REG 3 ATWS MODIF I CAT IONS REG MOD 0088 2DECBS 4&&Ill ll I
BMAY91 4 ATWS MODIFICATIONS REG MOD 0587 3JUNB7 22MAY91 TOTf.fvt 0
NKCKFKL ISC COKOKTTCNT CATE CKKUIESKT f&lN~ACC t&TC CCINKT&4:NT ISA TC t18ltXI CVTACC TTTC CCSSKTLEITT DttTE DATA DATE
I IJ"
tlOSICT AINICAIS tlOI Nll tACk I
SNtfT I
Tlskktt tOINT IACIIAS tIANT INIICRAIIOSCNtOIAI SIOSIOA tOSIS ANI IICNT CO.
NCOI TtlI INltIVAI TANCtl SCNICkff IANC IINIW IANC DIVA DATI ll IINATSS SINOVII taOIICISS SIOI SCNIOIAI NAR CORRI SIAll I IN ISO NAIA OAII ISANSI IOICSS
~1st ~I~
SACS OIIAS VAIOI 2
Nll 4 INI OSSAA CN NAC CCSNIIININT CAIICOS ~ IS COST ORIAAS OCOOIS 1 CIN IS 1989 1990 1991 1992 1993 3 REACTOR HEAD LIFT AIG LOAD CELL NRR MOD 1089 4 REACTOR HEAD LIFT RIG LOAD CELL NRR MOD 1070 C CLOSED CIRCUIT TV SECURITY SYSTEM NRR MOD 1301 C PERIMETER FENC"G SI INTRUS"N DET"N NAR MOD 1183 PAATIAL SATS ON PCM 88-384 DATED 2/25/91.
S CNTRL ROOM HFE ANNUNCIATOR STUDY NRR MOO 1011 C SECURITY ACCESS CNTL/CARD READEA NRR MOO 1184 4 RENIIIBER/RELABEL RCS VENT VALVES NAA MOD 1298 4 NUREG 0737, PORV SUPPORT MOOS NRR MOD 1383 C SECURITY PERIMETER LIGHTING NAR MOD 1182 3 RENLNBER/RELABEL RCS VENT VALVES NAR MOO 1295 PARTIAL SATS ON DEEP 87-213 DATED 5/03/90.
C SECURITY PLANT ENTRANCE FACII.ITY NAR MOO 1188 PARTIAl. SATS ON PCM 88 503 DATED 2/05/91 ANO 2/25/91.
310CT88 170CTSB 25APRBB 28SEPBB 4JUN90 7AUG90 SRCVSI 27JUL90 4OCT91 SFEB91 SICVSI BFEB91 I'>>clc>>
PSICICSI SAPR91 5NOV91
~
ISAIRSI P SICSCSI I
ISASSS I P SICSCSI 24JUN91 5JAN90 5JAN90 13SEP90 25APABB ICCTSI 9
5JAN90 ~ 25APR90 4 GL 88-17 LOSS OF DECAY HEAT AEMVL NAR MOO 1328 COMPLETE EATS ON PCM 89.040 DATED 1-22.91.
28SEP89 5RCVSI 25JUN91 IQTCS I OttONAL SSTC CSOCTTQOIT OATE CURROIT I4t4~SOE ISSC CCSOCTIKKT OA SC Cued aaaX S/TC Coalort42tt Oalc DATA DATE
SNOJKCT AINKCA'lf NIOT NNN NACf
~
KNIf1 TIJKKKT SOINT IACIKAK STANK INIIONAIIOSCNIINAK flONIOA NONS4 NISI I ICNT CO.
99449 I S ~ I INTfSUAI I
TAKOKT SCNSOIAK SANO I IIS IKN TANC NAIA DA'll 14 9214AT99 IINONI9 tl>>
IINANSI lf 1 4l SNOJIC\\SS 4\\49 SCIIIOIAf OAN CNANT ST ANT I INISN OAIA OATf TJANKK SCS f44 I\\SSOSI TAKCK T SCNK OUI K
~ACK ONSAK TAIUf. 1 Nl~
I I>>K OsfAK ON IINC CO>>II>>NNI CATSCOKIfS SONS OsfAKS SCODKS 4 CUN
~ I 1989 1990 1991 1992 1993 3 NUREG 0737, PORV SUPPORT MOOS NRR MOD 1382 S PROBABILTY RISK ASSESSMNT PROGRAM NRR MOD 1325 3 GL 88-17 LOSS OF DECAY HEAT REMVL NRR MOO 1327 COMPLETE SATS ON PCM 89-275 DATED 5I22I90.
C VITAL AREA BARRIERS NRR MOO 0700 S THERMAL STRESS PPG CONNCTO TO RCS NRR MOO 1312 S SFTY PARAMTR DISPLAY SYS HFE REVW NRR MOD 1289 PARTIAI. SATE ON PCM 90-189 DATED 9I07I90.
C SECURITY COMPUTER SYSTEM NRR MOD 1185 13SEP90 17JANBS 28SEP89 BFEBBB 8MAR89 17NOV88 29JUN91 T 9949991 27AUG91 SNOV91 30SEP91 SINUS I 14OCT91 COMPLETE SATS ON PCM 90-028 DATED 9I 12I90.
REMOVAL OF THE EXISTING SECURITY SYS GRD TWR IS NOT NRC COMMIT. RELATED AND WILL BE SCHEDULED AT A LATER DATE.
28SEP88 31DEC91 It 31OEC91 3
NORMAL CTLIT CLRS CNTRL SWITCHES NRR MOD 0550 PROCUREMENT ON HOLD 17JAN89 28AUG92 4DEC92 3 NIS ELIM. UNUSED SWITCH POSITIONS NRR MOD 1297 C CTL RM OP DESK PHONE REACH RESOLN NRR MOD 1290 3 PHASE A ISO SIGNAL TO RCS SMPL LN NRR MOD 1351 2eJUN90 24SEP92 V 49<<92 I
1449991 ~
299292 4OEC92 lSJJN92 ~
IIN1992 II SJUINI 4 TURB RUNBACK SELECTOR SWITCH REPL NRR MOD 1245 10MAR87 1APR93 SATTESI 0
ORDSSAS.
IKTC COHATNTTIT DATE CURRESST SON~AGE SRC COSAATIEIST PA TE CURTeTT OUTAGE SSTC COSSATTESST DATE DATA OATE
i
SROIKCT AINKCATS tlof Naa
~AFN
~
Rais f TURKKV tOINf IKCSCAR tlANT IN1KCRATIO SCNIOINK FIORIOA aessa AICI ~ Ilail CO.
NOOK 2 IS T
~NIIRVAI
~
Vlaa(as TARCKT SCNKOIN K fARO S INISN laall OAF* OAII 20 l1lalf'IS
'Iaaav a ~
RIFI lfNARSI I~
Cl taoslcfIT asof Ccalcaal RAR ceaaT START KFANRC F INISN toffas NAIA OAN lllfafl TAROK T SCNKOUC K
tAIN oafaa vAIIN a
Naa I INK OFIAa ON NRC CCaalllelNT CATICORIKS SORT
~ RKAKS OCCOlS CUR KS 1989 1990 1991 1992 1993 4 NORMAL CTMT CLRS CNTRL SWITCHES NRR MOD 0589 PROCUREMENT ON HOLD 17JAN89 8APR93 3JUN93 4 NIS-EL IM. UNUSED SWITCH PORITIONS NRR MOO 1298 4 PHASE A ISO SIGNAL TO RCS SMPL LN NRR MOD 1352 28JUN90 dJAN92 Srural 5MAY93 3JUN93 IMAYSS SOT CS I IIII ORONRL ffc COSOCTS4ICT OATC KKTRCTIT ICSIJRITROC fffC COaOKTRCNT OA TC CORIEIIT CVTCOC IIC COSSCTSCSIT OrSTC DATA DATE
faOIICT AINICASS NI 01
~ al s
salt r Tlsattv fosar IAOICM fIAHT INIICaAIIO SCHIOAI flaaIOA aavta Asts
~ ICHI CO.
Sssal III I INSINVAI TMCCI SCNIOIAC 9*NO IINISH IMO NAIA OAIf ta IIHAVSS 1911OVSt aaoslcrt I alai SCHIONII OAN CHANI AIM I
~ INISN NAIA OAII tIAHSS SOICSS I~Itatl fact aataa VMUI l Ila I INI aataa OH NAC CCNO99114IN1 CAItaaastS soaT
~ltAIs accots 1
COa lf 1989 1990 1991 1992 1993 I &E 3 RPI INVEATER AEPLACEMENT l&E MOD 0425 PARTIAL SATS ON PCM 88.582 DATED SI01I90.
C FLUX MAPPING h SEAL TABLE EVAL 18IE MOD 1154 C FLOOD PROT EDG FUEL OIL XFER PMPS I&E MOO 1320 PARTIAL SATS ON PCM 89-124 DATED 2-12-90.
4 SMALL BDAE PIP INGINCR DISPOSITION I&E MOD 1314 4 RPI INVERTER REPLACEMENT l&E MOD 0785 C INSTALL BARRIERS IN HVAC DUCTS l&E MOD 0787 COMPLETE SATS ON PCM 87-388 DATED 2I25I91.
30NOV87 29NOV88 31llAY89 P
1NOV90 II 9AUG90 495191 II I
29DEC90 5NOV91 QI 140EC90 ~
SAPR91 SNOV91 II I
9APR91 5NOI191 II I
7MAY90 13JUN91 IIOVII II SDEC88 19JUN91 40CT91 S
PWR LOSS TO VITAL BUS AT SALEM 2 I&E MOO 1058 S IEN 87-2 SEISMIC DUAL-DIAPHR VLVS I&E MOD 1087 C
IMPROVE PA SYSTEM AUDIBILITY I&E MOD 0711 3 SMALL BORE PIP INGINCR DISPOSITION I&E MOD 1313 15MAY87 12APA91 ~
17SEP91 II V
5NOV91 a
. IIIHVSI ~
41OVI I I
4DEC92 13FEB92 7MAY90 24SEP92 3
INST CTMT PHYS BARRIPAEV PERS ACC l&E MOD 0880 7APR88 300CT92 3JUN93 4
INST CTMT PHYS BARRIPREV PEAS ACC l&E MOO 0851 SJUL89 14APR93 ICTTCS s CIOONAL sttC CCINIOTACTIT OATC CTIRSCNT ICII~TACE ITC CCIOOTKHT CA TC CCRTetT CTTTACE STOIC CCASATIESTT DATE DATA OATE
i4.
f 1,
FCOILCT ALNICA11 FIOT OAA
~ACI
~
SNII'I
~
TUCCLV FOINT IAICtfAA FSANT INTLCAATIO5CNCDINE FIOAIOA FOAIA AAO I ICNf CO ~
NOOC tfff INIfAVAI I
VCAAI1I TAACL2 SCNiDIEE TAAO FINISN
~MC NAIA OAII 20 IINAV\\5 INIDVtf CIAI IINAA13 IO LI FAOIIC'Ill CLOT 5CNIC3Af OM CIIAAT SIMT
~ INISN NAIA OAII 2IANC~
SDLCTS 313jglI TAOCLTSCNCOUI E tACE SALAS VALUE." 5 OCA I INI OffAC DN NAC CCIellIINNI CAIIOOAI~ 5 SOOT CAIAAS OCODLS 1 CUC il 1989 1990 1991 1992 1993 OAA S
SOER 86-3 CK VLV APPLICATION RVW ORA MOO 1268 C GAS ANALYZER SYSTEM MQO ORA MOO 0036 PARTIAL SATS ON PCM 84-165 DATED 03I22I90 3 I.OAD CENTERS X FORMER REPLACEMENT ORA MOD 0661 PARTIAL SATS ON PCM 89-532 DATED 2I 13I91 C WASTE NEUTA SL WTP SYSTEM MOD ORA MOD 0042 COMPLETE EATS ON PCM Sd 084 DATED 8I27I90 PARTIAL SATS ON PCM 85-195 DATED 4-30-87.
4 LOAD CENTERS X-FORMER REPLACEMENT OAA MOD 1081 10AUG88 2DEC85 14AUGSS 9JAN8d 22FEB91 I
II I
l 1l I
11MAR91 I
II 1
I II I
PARTIAL SATS ON PCM 89-533 DATED 2I 13I91 C ADO"N OF "SWING" STATION BATTERY ORA MOD 1272 3 REDUCTION IN 4KV BKR VOLTAGE DAOP ORA MOD 1252 4 REDUCTION IN 4KV BKR VOLTAGE DROP ORA MOD 1253 C WTP IN-LINE CHEMISTRY MONITORS ORA MOD 0767 C REPI.
F IRE WTR SYS MN PP Wl 10" LN OAA MOD 1281 3
SECONDARY CHEM INLINE MONITIOAS ORA MOO 0102 4 SECONDARY CHEM INLINE MONITORS ORA MOO 0103 22SEPSS 18FEB90 1 JUN87 1 JUN87~
IIMAII31 I
II I
I II 28JUN91 I
II 5AUG91 I
II 7AUG90 17SEP90 14AUG91 17SEPSO 9JUN93 I
I 30MAA92 I
I II I
I DATA DATE
tSOITCT AIINCASS PIOT Stl
~ACS I
SHIST I
% IAAI SIANSO IINISH 2DICSS DATA DAII 1092OSI TICSSS tOINT IACISAS tlANT INTICAATIOSCINOulf IICAIOA POOI ~ APII I IIOIT CO.
tACS OlfAC VATIC 1
Itl IINf OA2992 ON NOC CCIOIIIINNT CAIICDAIIS NODS TSI I INTIAVAI I
OIAAISI TASCS 2 SCNITSNf IAOC I INISH IAOC DATA OATf 10 II NIT I2 2NIOOOS 1989 1990 1991 1992 1993 POOIICIS2 SIOI SCHIIOAI SAA CNAOI FPL 3 MOV FAIL DUE TO IMPROPER SW SETNG FPL MOD 0525 COMPLETE SATS ON PCM 87-005 DATED 4I 15I87.
PAATIAL SATS ON PCM 87-008 DATED 4I23I90.
4 STM GENERATOR J NOZZLE AEPLACEMNT FPL MOD 1274 10APRSS
) 10JAN89 NEED SATS FOR CLOSURE 4 CONDENSER INLET WATERBOX AEPAIR FPL MOO 1288 PARTIAL SATS ON DEEP 88-344 DATED 05-04-89.
4 MOV FAIL DUE TO IMPROPER SW SET"G FPL MOD 1110 THE COMMITMENT RELATED PORTION OF THIS MODIF ICATION WAS COMPLETED IN MARCH 1989.
THE REMAINDER OF THE WORK IS NOT ISIS RELATED.
PARTIAL SATS ON PCM 87-008 ST 87-009 04-MAR-89 3
RHR PLNPS SEAL UPGRADE FPL MOD 1172 PARTIAL SATS ON PCM 58 077 DATED 03I28190 3
SGWL CNTMT ISOLAT"N VLV REPLACEMT FPL MOO 0293 COMPLETE SATS ON PCM 88 077 DATED 1-23-91.
S RESOLVE CNTMT PURG FSAR DISCREP FPL MOD 0828 28JUNSS
= 14SEPSS 15 JAN87 31AUG87 21MARBS 2MAY89 I
22MAYSS I
II 11JUN89 IJUN89 22IIAII90 I
II
~
2299290 ENGINEERING STUDY COMPLETE 01-OCT-90 PER LETTER ¹ JPN PTN-90-2815.
EST IMATEIAPPAOVAL FOR ADDITIONAL WOAK IS IN PROGRESS.
C HP WORK AREA AND N.O.
WORK AREA FPL MOO 0378 17NDV89 IOOTIO PARTIAL SATS ON PCM 89 512 DATED 2120/91.
3 SFP COOLING SYS SEISMIC MOD FPL MOD 011S THE CONllTMENT FOR THIS MOD HAS BEEN MET.
BAI.ANCE OF WOAK BEYOND THE 18 DEC 87 NAC COMMITMENT DATE IS FOR ISSUANCE OF FINAL STRESS CALCULATIONS. WHICH WAS NOT REGD TO MEET THIS COISJITMENT.
SATS REOUIRED FOR CLOSURE.
14AUGSS 1991999 ~
1920990 14DEC90 C EDG PROJECT LICENSING SUBMITTALS FPL MOD 1144 ENGINEERING I.ETTER REOUIRED FOR CI.OSURE.
3 EDG STATION BATTERY CHARGERS FPL MOD 114S IMPLEMENTATION UNDER MOD ¹\\\\45.
3 MSIV AIR OPERATOR BACKUP N2 SYST FPL MDD 0257 SATS REOUIRED FOR CLOSURE.
S MOV THERMAL OVERLOAD HTR SELECTN FPL MOD 1249 REF.
LTA JPE-PTSP-88 1051 CONFIRMS MEETING NAC COMMIT ON JUN 20, 1988.
COMPLETION OF PREP ST APPVL OF STD E.3.20 MEETS NRC COMMITMENT.
EP TO BE ISS SPECIFYING TOL"S FOR MOV"S.
IS NOT NRC COMMITMENT RELATED.
4 SFP BRIDGE CRANE AEPLACEMENT FPL MOD 0744 COMPLETE SATB ON PCM 88-171 DATED 1-29 91.
20JUL87 22MAASS 2OEC85 190CT87 4FEBSS 25 JUL 89 II I
II I
11JAN91 24 JAN9 I 29JAN91 DATA DATE
IV
tEOIECT AINfCA11 rlol Stl PACE
~
SNEff TUEEET POINT IECEEAC tfANT INTECAATEO SCNEEAAE TIOAIOA POvfA ANO ~ ICNT CO.
NOOE Tff~
INll0 VAE TAACET SENEOIOE lAAO 2 IIIISO TAAO NAIA OAII 20 IINAT1$
21NOV1$
~IPI 12NA012 IP'l tEOIEC'lf2 0102 SCNI CIAl OAA CNAll STAll 22AIITE
~ INISN SOIC1'1 CATA CATE l1ll012 TAOCE T
SCNE OUT E
PACE OEEAE VAIUEI ~
Stl IINE OATAE CN NAC CIVPIITNfNT CATECINIfS SUET OAEAES OCCOES 1 CUE ll 1989 1990 1991 1992 1993
~ ~
FPL SATS REQUIRED FOR CLOSUAE.
3 BORIC ACID EVAP PMP UPGRADE FPL MOO 0237 NEED SATS FOR CLOSURE C ADDNL EMERG LIGHTING FOR APP.
R FPL MOO 0592 PARTIAL SATS ON PCM 86-213 IREV SI 10-31-89 C ELECT DWG SEPARAT"N 62 RENIPJBERING FPL MOD 1095 PARTIAL SATS ON PCM 87-279 GATED 04-13-89.
4 MSIV SAFETY REI. AIR ACCIkl SYS FPL MOD 1258 PARTIAL SATS ISSUED 5I24l89.
S ICW CK VLV OPER Wl IA FAII.URE FPL MOD 1283 ENGINEERING LETTER AEQUIREO FOR CLOSURE.
4 TPCW HX ISOLTN - CV2201 FAIL CLSE FPL MOO 1285 PARTIAL SATS ON PCM 88-346 DATED 04-29-89.
3 SFP BRIDGE CRANE AEPLACEMENT FPL MOO 0745 PARTIAl. SATS ON PCM 88.170 DATED 12 17 90.
4 SPENT FUEL POOL RERACKING FPL MOO 1190 COMPLETE SATS ON PCM 87 405 DATED 2-1-91.
PARTIAL SATS ON PCM 88-319 DATED 12 8-90.
3 REMOVAL OF TPCW AMERTAP SYSTEM FPL MOD 1317 TPCW AMERTAP SYSTEM WOAK WAS SPLIT FROM MOO 531.
TPCW AMERTAP WAS NOT NRC COMMITMENT RELATED.
PARTIAl. SATS ON PCM 86-195 CATEO 4 28-88.
C MN CTI. RM DOOR SI SECURITY SYS MOD FPL MOD 1271 SATS REQUIRED FOA CLOSURE.
3 EDG SWING SWGR 3AD FPL MOD 1178 IMPLEMENTATION UNDER MOO 421145.
4 EDG SWING SWGR 4 AD FPL MQO 1180 IMPLEMENTATION UNDER MOD 421145.
4 BACKUP INSTR. AIR COMPRESSOR FPL MOO 0291 13JULSS 20AUG87 22FEBSS 4APRBS 12NOV85 1 2JUNSS SJUN87 10MAYSS 260CT87 15NOVSS 20JAN88 31JUL87 18NQVSS 11JUN89 SFEB91 II I
II I
II I
II I
II I
II I
II I
20FEB91 II I
II I
20FEB91 II I
C W.T ~ PE FLOW METERS UPGRADE FPL MQO 0151 C EDG HC TUABOIIDLE GEAR STUB SHAFT FPL MQD 0509 C NEW EDG BLOGS I.TG F IAE CQh%I HVAC FPL MQO 1175 4 ATMOSPHERIC DWlP VLV AEPLACEMENT FPL MOD 1260 3 AEACTOR CAVITY HANDRAIL FPL MOO 0233 PARTIAL SATS ON PCM BS.1SS CATED 03129l90 11FEBSS 16MARSS 1SEP87 3MAY88 2 MAR87 II I
II I
II I
II I
20MAR91 DATA DATE
+<
tSOICCT AINCCAIT tlol Itl tACf I
SNf CT 1
TINSCT POINT IAICICAC PCANT INTCCSAICO SCNIOIAC CIOOIOA POsff AICI IICNf CO NOOC III'I IVIICTAI I
TCAAISI TAOCC 1 SCNCOVIC IANO IIVI\\V
'TACO OAIA SAIC SO FIOAT'IT T\\NOTCC
~AOIICTfT CIOI SCNCOVlf OAA CNAlf SIAN I fIN ISO NAIAOllf TIANCC TOC CT'I
~ TCCOT ~
tACC OICAS VAlVE 1
ftl I INC OICAC ON NNC CONIITNINT CAICCONIIS 1989 1990 1991 1992 1993 FPL S
ECCS HEAT SINK UPDATE C NEW EDG FIRE PROTECTION 4 ADO SI RELOCATE AFW N2 SUPPLY FPL MOO 0382 FPL MOD 117$
FPL MOD 0218 SMAY87 llMAYBB II I
COMPLETE SATB ON PCM 85-170 DATED Od-27-87.
COMPLETE SATS ON PCM 8S 045 DATED 04-04-88
~
PARTIAL SATS ON PCM 88 184 DATED 04-21-89.
4 PROCURE SI INSTALL TWO NEW EOG"S FPL MOO 1138 PARTIAL SATS ON PCM 87-283 DATED 2I27I91.
3 POAV STROKE TIME ENHANCEMENT FPL MOD 1315 PARTIAL SATS ON PCM 89 585 DATED 04I 18/90 4 REPLACE SI CHK VLVS 4.874A SI 8 FPL MOD 135S 3 CHARG PMP AEI.IEF VLVIDRN LN SUPPT FPL MOD 1323 4 REACTOA CAVITY HANDRAIL FPL MOD 0080 3 ATMOSPHERIC DISAP VLV REPLACEMENT FPL MOD 1259 PARTIAL SATS ON PCM 88 517 DATED 05-11 90 ANO 07 18-90 4
NORM CNTMT CLRS CAPACITY INCREASE FPL MOD 0903 PARTIAL SATS ON PCM 87 028 DATED 04 22 89.
4 PORV STROKE TIME ENHANCEMENT FPL MOO 131S 4 UPGRD RCP OIL LIFT SYSILOWR COOLR FPL MOD 1021 S
PROV ACCEPT CRIT FOA OIL XFR PMPS FPL MOD 092S C EDG DIESEL IO.O.S. T.
BLDG CONST FPL MOO 1174 PARTIAL SATS ON PCM 87 259 DATED ll04ISO AND 2 I 27 I 9 1.
C INVERTER RM HVAC UPGRADEIPERM FIX FPL MOO 1218 C DES Sf PUACH STA BATTERY CHARGERS FPL MOO 1275 0 SECONDARY SIDE HIGH ENERGY P IP ING FPL MOD 0892 0 BORIC ACID CONCENTRATION REDUCTN FPL MOD 1311 4 ADD"L CNTMT ELECT PENETRATIONS FPL MOD 0788 20ECSS 26FEB87 240CTBS 27DEC89 170CT89 2MAR87 3MAYSS 7APRSS SDECSB 30CTSB BMAY87 4APABB 13JULBS 13JUNSS 1ZJUN89 30MAR89 II I
I II I
II I
II I
II 2APA91 I
SAPR91 I
10APR91 I
13APRS I I
13APR9 1 I
19APR91 I
25APR91 I
II 4JUN91 I
13JUN91 I
II I
II 20FEB91
~Q 14MAY91 i
j Il I
II I
II I
II CATA DATE
~
~
I b
h
S TASI IINISN NAIA Oalt 2IAIISl SOTCSS Illlal I FaslfCT AlslCA1$
Flol fFl
~Asl
~
SJIItI
~
TOatIV POINT IACITM FIANT INTTCSATTO SCNttast flOSIOA FOVI~ JNO I ICNT CO.
'IAAOT f SCNS OUI T
FACT ~ atAS VAINTT ~
Fal I INF salas ON Nac COIOIITJNNI CATIOOAITS IAACtf SCNflast TASC FINISN TASC OAI* OAII NCOT 2/FT INltaVAl I
VtA$9$ 9 loaf sltAls scoots
~
CIJS lf 1$
ITNAVTS 2 $992$ 9 a 1989 1990 1991 1992 1993
$$OITC122 Slsl SCNIOIAT SAA CNAAT FPL 3 P2R RLF LN SNUBBER REPLACEMENT FPL MOO 1267 PARTIAL SATS ON PCM 89 046 DATED 04I 18I90 C WTR EQUIPT 6I HOTWELL SAMPLE SYST.
NORM CNTMT CLRS CAPACITY INCREASE FPL MOO 0902 PARTIAL BATS ON PCM 87 025 DATED 07-16-90 4 EDGILD CTR 4H, MCC4D 5 XFR OF LDS FPL MOD 1139 IMPLEMENTATION UNDER MOD ¹1145.
3 EDG LOAD CTR 3HIMCC 3D FPL MOD 1142 IMPLEMENTATION UNDER MOD ¹1145.
PARTIAL SATB ON PCM 89 069 GATED 1I24I90 ANO 2I 14I90.
50CTSS 21JUN90 I
10OCT88 100CTSS 13JUN91 II II 15JUN91 II 17JUN91 17JUN91 14JU N91 3 4KV BUS AIC MODIF ICATION FPL MOO 1329 4 4KV BUS AIC MODIFICATION FPL MOO 1330 4 REPLACE FARRIS RELIEF VALVESICCW FPL MOD 0415 PARTIAL SATS ON PCM 86.238 CATED 04-07-89.
C EDG BLDG I3AI4A,3BI48] TIE-INS FPL MOO 1140 IMPLEMENTATION UNDER MOD ¹1145.
PARTIAL SATS ON PCM 87 254 DATED 2I2'7I91.
3 CHEM INJECTION OF ICW TO CCW HX FPL MOO 1321 29DEC89 29DEC89 2SEP88 29SEPSS 20JUN91 I
ll 28JUN91 18JUN91 I
ISJUN91 4
CHARG PMP RELIEF VLVIDRN LN SUPPT FPL MOD 1324 C NEW EDG PROJ SITE PREPARATION FPL MOD 1137 PARTIAL SATS DATED II04I90 ON PCM 87-212 4 REPL MOV.535I536 ACTUATORS FPL MOO 1389 C REVIEW WEJ-IT EXPANSION ANCHORS FPL MOO 0586 PARTIAL SATB FOR PCM 89 070 DATED 11-09-89, 12 05-89, ANO 12 13-89 4 MAIN FEED CV 2011 CLOSING TIME FPL MOO 1102 3
INSPECT IREPAIR INTAKE STRUCTURE FPL MOD 134S
.... 31MAY89 SMAR88 I
ll 4JUL91 3JUL91 300CT89 I
15JAN87 14SEP90 I
4MAY87 ISJUL91 5JUL91 l
9JUL91 II 10JUL91 II 19JUI91 3 HIGH INITIAL RESPONSE EXCITER S NAC AUDIT PEP PROJ4/CONF IG MGT FPL MOO 0978 FPL MOD 1308 22DECSS ISJUL91 I
II COMPLETE SATS ON PCM 90-157 DATED 1-29 91.
COMPLETE SATS ON PCM 90-158 DATED 1-29-91.
17MAR89 18JUL9'I CATA DATE
SIAAI IINISN CATA OATS 2 IANaa TOICTS Ialfoal
~COIICI AINTCATS
~a of
~ACI
~
SNIft TIICCTY tOINT IAICITAO tfANT INIIIAAIIOSCNIOVIS flCOIOA tfafk Aafa I ICNY CO.
Akol
'I sckl Col 9
tACC Olfak VAIOC ftl I INC Offak ON alaC CINNIIININTCAIIOCOIIS TACOTT SCNTOIOT IANO ~ IVISN IAAO Oalk OAII llCOC tttl INltkfal
~
TIAAISI SOkl Oklalf OCCOIS CVN lf 20 IINAT$$
INTOVI~
1989 1990 1991 1992 1993 CIPI ITNAkal Ia. AS
~aollctfl aaof SCNIOUlt OAk CNAAI F PI.
4 MG-d RELAY REPLACEMENT FPL MOD 1354 13FEB90 4
CHEM INJECTION OF ICW TO CCW HX 3
I CW UPGRADE FPL MOD 1322 FPL MOO 1192 C UNDERSZD NZZL-SHLL JOINTS-TNK HX FPL MOD 1343 C ERDADS INPUT ISOLATION ADDITIONS FPL MOD 1214 COMPLETE SATS ON PCM 87-310 DATED 10-31-89.
1 JUN90 I
SJUN89 II I~
29JUL91 II I
2AUG9 1 IL j
2AUGS 1 II I
SCOPE OF WORK IS FOR DUAL UNIT OUTAGE ONLY.
FUTUAE WORK TO BE SCHEDULED.
S LIMITINGCONDITION CVT OPERATION FPL MOD 0344 S
BKR LIST VEAIF"N WALKDOWN OF NCRS FPL MOO 1265 IFEB90 29DEC88 I
II 15AUG91 THE COMMITMENT RELATED PORTION OF THIS MOD HAS BEEN COMPLETED PER LTR JPN-PTP-90-0190, DATED 1/ 19/90.
THE REMAINDER OF THE WORK IS NOT CFO RELATED.
COMPLETE SATS ON PCM 89 323 DATED 6/14/90.
COMPLETE SATS ON PCM 89-253 DATED 9/11/90.
COMPLETE SATS ON PCM 90-184 DATED 2/21/91 6FEB89 22 JAN9 I 28AUG9 I C REG GUIDE 1'7 AUDIT PAEP FPI.
MOD 1326 0 EXISTING "A" EDG IDLE START/STOP FPL MOO 0132 PARTIAL SATS ON PCM 87-284 DATED 2/27/91.
17AUGSS 29SEP88 SSEP91 30AUG91 3
MG d RELAY AEPLACEMENT FPL MOD 1353 3 POLAR CRANE MOTORS/ENGR PACKAGE FPL MOO 0478 4 POLAR CRANE MOTORS/ENGR PACKAGE FPL MOD 0477 C EPS ELECTRICAL ENHANCEMENT FPI.
MOD 1145 PARTIAL SATS ON PCM 87 264 DATED 2/27/91.
0 PLANT LIGHTING UPGRADE PH I
6I I I FPL MOO 0889 PARTIAL SATS ON PCM 88-296 DATED 02 06-90.
3 BYPASS RTO EL IMINAT"NMOOIF ICAT"N FPL MOO 0816 NAC REVIEW AND APPROVAL OF LICENSING REPOAT SCHEDULED TO COMPLETE 15 JUN 91.
4 BYPASS RTD EL IMINAT"NMODIFICAT"N FPL MOO 0617 1 2JAN90 11JUL90 I
11JUL90 I
24FEB88 12SEP91 230CT87 16 JANSO 24SEP91 I
II 7SEP91 l
10SEP91 I
IOSEP91 NRC REVIEW ANO APPROVAL OF LICENSING REPORT SCHEDULED TO COMPLETE 15 JUN 91.
16 JANSO I
II 12NOV91 3 SFP DEMIN RESIN FLUSH UPGRADE FPL MOD 0956 60CT87 130EC91 DATA DATE
\\
taOITCT AINICASS tata 9ta
~ACf I
CNfff Tufafr FOINT IRJCITAA FIANT INIIOSATIO SCNIOJA I FIOSIOA FOSIS AIO I ICNf CO.
992OS
~ I~ I INafSVAI
~
VTAS1$ 9 TAScaf scNTCIJaa IAAO I INISN TARO DATA OATf TS 1119RVSS TSNOVSS
~\\N IINRS\\I I~
aa taollcl la sas\\
SCNIOIAT OAR CNAaf OIAAT flANSS f INISN SOICSS NAIA OAII ISIIO\\I 1 A O O 1 'I C C N f O U I 1 tAOC OSTJA VAIINI\\ Itl IINf Oafaf ON NSC CISN121191NT CATICORIIS sosf oafAAS ocoofs s calo at 1989 1990 1991 1992 1S93 FPL C CONTROL ROOM HABITABILITYHVAC FPL MOD 0014 THE COMMITMENT RELATED PORTION OF THIS MODIFICATION HAS BEEN COMPLETED.
ENHANCEMENTS TO THE CONTROL ROOM HVAC SYST.
BEYOND 17 JUN 88 ARE NQT CFO RELATED.
2JAN85 27DEC91 C EVALUATION OF AIR OPERATED VALVES FPL MOD 1344 C
F IRE PIAIP DIESEI. ENGINE UPGRADE FPL MQD 0191 3 C BUS XFMA DELUGE SYS ALARM FPL MQD 0854 3
CHAAG PIAlP SUCTN QUICK DISCONNECT FPL MOD 0431 3
MSR INSTRNAENTATI ON FPL MOD 1010 S 480V LOAD CTR UNO VOLTAGE SETTING FPL MQO 0484 C CHEMICAL STORAGE BLDG CENTRAL AIC FPL MOD 1202 C PASS DSLVD HYD MONILIQ SMPL UPGAO FPL MOO 1337 C RELOCATE WTP PRETAEATMENT SYSTEM FPL MOO 1349 PARTIAL BATS ON PCM 88 107 DATED 8 10-88.
4 SFP OEMIN RESIN FLUSH UPGRADE FPL MQO 1155 S MISSILE PROTECT EVAL-PLNT EX DOOR FPL MOD 1354 C PASS CHLORIDE ANALYZER REPLACMNT FPL MOD 1319 PARTIAL BATS ON PCM 89-141 DATED SI 13I90 ANO 10I05ISO.
28JUL91 II 3JAN92 I
SJAN92 I
10JAN92 11JUNSO I
4JUN90 I
22DECdd 31MAY89 25JUNS7 22FEBSS 3APR90 I
31MAY90 I
19OCT87 II I
II I
18MAA92 II I
14FEB92 I
- 14FEB92, II I
18 JAN92 II I
14AUG91 ~ 23JAN92 II I
30JAN92 I
II I
31 JAN92 II I
29AUGS1 ~
7FEB92 II I
14FEB92 I
II I
C PLT PERIMETER FLOOOWALL AEPAIR FPL MQO 1357 18JUN90 3 PERSONNEL da EQMT HATCH SHIELD FPL MQD 1182 3
IMPROVE HQT WELL DAAIMAGE FPL MOO 1385 C WASTE GAS SYS UPGRADE PAOGAAM FPL MOD 0788 C IA COMPS-MODIFY LCC CONTROI. LOGIC FPL MOD 0281 C CCW AAEA PIPE TRENCH FLOODWALLS FPL MQD 1358 3AUG90 24MAR85 II 27JUN91 II 14AUGS 1 II SAUGS 1 II 23JUN92 II I
I I
I
~ 2999992 I
I RJUR92 I
I 2 9 J UR9 2 DATA DATE
~
~
hg
tfDJ(CT ALNCCASS tLDT Itl tACf I
SNECI 1
TUSACV tOINT SAC(CAN t(ANT INILCAAIEOSCINDINL
~ IONIOA PONIN AID I ICNT CO NQOC
'ISIS INICNVAI I
VEANISI
'TANCCT SCNC(NNf EAAO S INISH
'IANO DATA OAIC 14 IIIIATS' 29NOVES NUN ISNAEEI lt
~ 4 PAOJLCIS 1
~ 941 SCNI DIAI OAE CNAAE SIAN1 2JAPICC fIN(SN SDfC4$
DATA OAlf I\\SCOSE TA ~ OE1SCNCDULC SPCC OLCJJ( VALUC 4
StL LINf ~ EfAA DN NEC CCIEIIINCNT CAICCCOllS SUET OECANSOCODLS \\
CUN CS 1989 1990 1991 1992 1993 FPL S STUOYIMOV FAIL"R DUE TO HANlERING FPL MOD 0697 3 REPL RXIREF CAVITY LTG F IXTURES FPL MOD 0358 3 REPL 480V MCC 3E DUE TO CORROSION FPL MOO 0793 3 REPLACE G.E.
CR120BD AUX RELAYS FPL MOO 1207 27DEC85 1 OAUG87 24JAN92 Il 31MAY91 II 29JUN92 I
1SEP92 I
IEEP92 I
1SEP92 3
DRYER SYSTEM FOR SJAE SPING-4 MON FPL MOD 1332 II II 1SEP92 3 REPL MOV-535I53S ACTUATORS FPL MOO 1388 3 REPLACE FARRIS RELIEF VALVESICCW FPL MOD 0414 14SEP90 II I
12SEP92 PARTIAL SATS ON PCM 86 237 DATED 4I 17I90.
C 3E 6( 4E LOAD CENTER PERM TIE FPL MOD 1080 3
TEMP AC IN CONTAIMAENT FOR OUTAGE FPL MOO 1331 22DECSS 22JUN90 il 12FEB90 24SEP92 24SEP92 II I
24SEP92 3 PRESSURIZER SPRAY VLV BDY REMOVAL FPL MOO 1348 3 UPGRD RCP OIL LIFT SYSILWR COOLER FPL MOO 0888 15SEP89 24SEP92 l
ll I
COMPLETE EATS ON PCM 89-574 DATED 4I 16I90 ANO SI22I90.
C ADO RELAYS TO UNORVLTAGE CIRCUITS FPL MOO 1341 3
PERM SHIELDING IN CASK WASHDOWN FPL MOO 0134 4 PERM SHIELDING IN CASK WASHDOWN FPL MOD 0135 3 CNTMT PRMS R
11 8( R-12 REPL FPL MOO 1370 C CONTROL ROOM HVAC CONTROL MOD FPL MOO 1372 3
CTMT VESSEL CATHODIC PROTECTION FPL MOD 128S 10AUG88 20CT92 II I
2994191 II I
1244992 II I
1244992 II I
16AUG91 II I
14AUE91 II I
4PEI92 II I
120CT92 I
280CT92 I
280CT92 I
300CT92 I
300CT92 I
18NOV92 4
C BUS XFMR DELUGE SYS ALARM FPL MOO 0853 4J UN90 11 JAN93 II I
4 CHARG PIktP SUCTN QUICK DISCONNECT FPL MOO 1255 22DEC88 15 JAN93 II I
4 IMPROVE HOT WEI.L DRAINAGE FPL MOD 1366 14AUG91 22JAN93 DATA DATE
4 T
r Nt I
9 PROJECT ALNLOASR nol IPl
~AOI I
BNIfT
~
TIIaaav POINT EBICLTM nfflr INILORAELO SCNLEBAL flOBIOA FOFIR AFEI IIOII CO ~
NBOL Erl'I INIEBYFE I
YEABIRF raaolr scNLIaaa TARO ~ INIBII
'IABO OA'IA OAII 14 IIFBIY'I4 3\\NOY34
~ 229 IINM'I ~
~ 4
~ 4
~ROILClrr BART BENIIBA~
OAR 2NABE START I INISN OAIA OAIR RIANRR rofcaa 1492441 TAacrrscarooa PACR OEEAA VALORI
'4 Pal I INE ~ EIAR ON NEC COIOIIEINNT CAlfCORIES scoT RRLAas occoas 4
Coa rf 1989 1990 1991 1992 1993 FPL 4 PERSONNEL 8L EQMT HATCH SHIELD FPL MOD 1183 27JUN91 1FEB93 3
C" BUS SWGR ENCL AIC MOOS FPL MOD 0070 4 REPL 480V MCC 4E DUE TO CORROSION FPL MOD 0794 4 DRYER SYSTEM FOR SJAE SPING-4 MON FPL MOO 1333 C ADO FUSE SPEC TO BKR LIST 82 DWGS FPL MOD 1254 C CATWALK IN WATER TREATMENT PLANT FPL MOD 1171 14OCT85 23JUL91 II 31MAY91 II 28FEB90 I
I 2SEP92 ~
11FEB93 I
I 1
8MAR93 I
I 12APR93 I
I 12APR93 4 REPL RXIREF CAVITY LTG FIXTURES FPL MOD 0357 4 PRESSURI2ER SPRAY VLV BDY REMOVAL FPL MOD 1347 4 CNTMT PRMS R-11 82 R-12 REPL FPL MOD 1371 3 TRANSFER CANAL LEAKAGE PERM FIX FPL MOD 0895 4 TRANSFER CANAL LEAKAGE PERM FIX FPL MOD 0898 4 CTMT VESSEL CATHODIC PROTECTION FPL MOD 1305 4MARS7 II I
I 28AUG91 17MAY93 II I
j 29FE392 ~
2292993 II I
I 19JUL91 II I
I SJUL93 II I
I IIFEB32 ~
IFAF293 II I
I 23APR93 I
II I
I 15SEP89 5MAY93 4 "C" BUS SWGR ENCL AIC MOOS FPL MOD 0071 3DEC85 7OCT93 4
ICW UPGRADE FPL MOD 1193 1JUL91 12DEC94 DATA DAVE
l h
~
y
, ]