L-88-221, Provides Util Work Plan & Schedule for Proposed Enhancement of Existing Onsite Power Distribution Sys.Util Will Give Presentation on Emergency Power Sys Enhancement in Near Future
| ML17345A234 | |
| Person / Time | |
|---|---|
| Site: | Turkey Point |
| Issue date: | 05/27/1988 |
| From: | Conway W FLORIDA POWER & LIGHT CO. |
| To: | NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM) |
| References | |
| L-88-221, NUDOCS 8806140044 | |
| Download: ML17345A234 (12) | |
Text
ACCELERATED DIGRIBUTION DEMONST1OIION SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
ACCESSION NBR:8806140044 DOC.DATE: 88/05/27 NOTARIZED: NO FACIL:50-250 Turkey Point Plant, Unit 3, Florida Power and Light C 50-251 Turkey Point Plant, Unit 4, Florida Power and Light C AUTH.NAME AUTHOR AFFILIATION CONWAY,W.F.
Florida Power
& Light Co.
RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)
SUBJECT:
Provides util work plan
& schedule for proposed enhancement of existing onsite power distribution sys.
DISTRIBUTION CODE:
A001D COPIES RECEIVED:LTR ENCL SIZE:
TITLE: OR Submittal:
General Distribution DOCKET "g '
05000250 05000251 NOTES 1"
RECIPIENT ID CODE/NAME PD2-2 LA EDISON,G INTERNAL: ARM/DAF/LFMB NRR/DEST/CEB 8H NRR/DEST/MTB 9H NRR/DOEA/TSB 11 NUDOCS-ABSTRACT 01 EXTERNAL: LPDR NSIC COPIES LTTR ENCL 1
0 1
1 1
0 1
1 1
1 1
1 1
1 1
1 1
1 1
1 RECIPIENT ID CODE/NAME PD2-2 PD NRR/DEST/ADS 7E NRR/DEST/ESB 8D NRR/DEST/RSB 8E NRR/PMAS/ILRB12 OGC 15-B-18 RES/DE/EIB NRC PDR COPIES LTTR ENCL 5
5 1
1 1
1 1
1 1
1 1
0 1
1 1
1
/
A D
I D
A TOTAL NUMBER OF COPIES REQUIRED:
LTTR 22 ENCL 19
er e
t
~
r
~ ~
Iv P.
OX 14000, JUNO BEACH, FL 33408 0420
@llg~
I:3
~/NA MAY 2 7 1988 L-88-221 U. S. Nuclear Regulatory Commission Attn:
Document Control Desk Washington, D.
C.
20555 Gentlemen:
Re:
Turkey Point Units 3 and 4
Docket Nos.
50-250 and 50-251 Emergency Power System (EPS)
Enhancement Pro'ect In June of 1987, FPL met with the NRC to discuss the proposed enhancement of the existing onsite power distribution system at Turkey Point Units 3 and 4.
This meeting was intended to further the NRC's understanding of the enhancement project in order to ensure that the project be implemented in a timely manner acceptable to the NRC.
Since our meeting in June
- 1987, FPL has continued working to define the numerous activities required to successfully implement the enhancement project.
As part of this effort, FPL has developed a detailed work plan and schedule for the various licensing submittals and NRC reviews considered necessary and appropriate for a project of this nature.
The purpose of this letter is to provide our licensing work plan and schedule for your information and future planning.
The licensing effort associated with the system enhancement project will entail the submittal of three specific documents for approval.
The scope of each document, its to the enhancement project and schedule approval is detailed in the attachments..
emergency power development and NRC review and purpose relative for review and RGEPS.EP oo 8806140044 880527 PDR ADOCK,05000250 P
'en an FPL Group companY
~ ~
U. S. Nuclear Regulatory Commission L-88-221 Page two As discussed with Dr.
G.
- Edison, Project
Included in this presentation will be a
review of our licensing work plan and schedule.
Therefore, any questions concerning the attached information can be discussed at that time.
This information will be helpful in increasing the NRC's understanding of the enhancement project and the licensing activities necessary to support its successful implementation.
Should there be any questions, please contact us.
Very truly yours, W. F.
Conway Senior Vice President Nuclear WFC/RG/gp Attachments cc:
Dr. J. Nelson Grace, Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, Turkey Point Plant RGEPS.EP
0 ~
EPS ENHANCEMENTPROJECT LICENSING WORK PLAN The licensing work plan associated with the EPS Enhancement Project would entail the development and issuance of three separate NRC submittals.
Our first submittal would consist of a
design report which describes the planned modifications to the existing power distribution system and how the enhanced power distribution system would operate under normal and design basis conditions.
In addition, the proposed approach for implementing the required electrical system modifications during plant operation or outage conditions would be explained.
The purpose of this submittal would be to obtain NRC approval of the enhanced electrical system configuration since it will result in Technical Specification changes.
Our scheduled issue date for this first submittal is June 20, 1988.
Our first submittal would be supplemented by two follow-up sections'.
The first supplemental section would describe FPL's approach towards qualifying and testing the enhanced power distribution',system prior to declaring the system operable.
The secon'd supple'ment would contain a safety evaluation for the, enhanced power system.'he scheduled issue'ates for the first and second supplements are September 30, 1988 and January 31, 1989 respectively.
Pending a favorable NRC review of our first submittal and each supplement, FPL would issue a second submittal containing the required Technical Specification changes and supporting No Significant Hazards Evaluations.
Our scheduled issue date for this submittal is April 28, 1989.
Our third and last submittal associated with this project would present FPL's position on resolution of Station Blackout for Turkey Point.
Although proposed NRC requirements with respect to Station Blackout have not been finalized at this time, we have scheduled issuance of this third submittal in October 1989.
V
~ 4 44 4
4 4
4
- ~
P
~ HH 4
4
WORK PLAN OUTLINE Submittal 4/.l EPS Enhancement Report.
This submittal would contain system design/operating information, a discussion of our proposed implementation plan, and a preliminary power distribution system FMEA it EDG Qualification (300 start test as appropriate)
Factory Production Test for EDG's Field Startup Testing Pre-op and Safeguards Testing (Scheduled Issue Date)
(6/20/88)
(9/30/88)
Submittal PP2 it include:
Review of FSAR Chapter 10 accidents Final EPS FMEA results PRA results
- Revised Technical Specifications and No Significant Hazards Evaluation (1/31/89)
(0/28/89)
Submittal 83
- Station Blackout - This submittal would contain (10/89)
FPL's position and supporting justification for resolution of station blackout.