L-85-379, Requests Approval to Use Alternative Insp Technique to Satisfy Inservice Pressure Testing Requirements of ASME Code.Instrumented Insp Technique Can Be Implemented on Listed Sys
| ML17216A305 | |
| Person / Time | |
|---|---|
| Site: | Saint Lucie |
| Issue date: | 10/04/1985 |
| From: | Williams J FLORIDA POWER & LIGHT CO. |
| To: | Thompson H Office of Nuclear Reactor Regulation |
| References | |
| L-85-379, NUDOCS 8510100108 | |
| Download: ML17216A305 (4) | |
Text
FLORIDA POWEfI 5 LIGHT COMPANY tK'I 4
1985 L-85-379 Office of Nuclear, Reactor Regulation Attention: Mr. Hugh LiThompson, 3r., Director Division of Licensing U.S. Nuclear Regulatory Commission Washington, D.C. 20555 Dear Mr. Thompson!
Re:
St. Lucie Unit No. I Docket No. 50-335 Instrumented lns ection Techni ue (IIT)
The purpose of this, letter is to request NRC approval to use an alternative inspection technique" to satisfy the In'service Pressure Testing requirements of the ASME Code,Section XI, as permitted by 10 CFR 50.55 a(a)(3).
The details of this alternate inspection technique, Instrumented Inspection Technique (IIT) are the subject of a H.A.F.A. International Inc., Topical Report HAFA 135 (P).
This topical report is currently under NRC review, and based on a meeting with NRC on September 20, l985, it is our understanding that the topical will be approved in the near future.
The St. Lucie Unit I plant systems have been evaluated in accordance with Section IV of the Topical Report.
Based on these evaluations, it has been determined that the IIT can be implemented on the following systems:
Reactor Coolant System Low Pressure Safety Injection (LPSI)
High Pressure Safety Injection (HPSI)
Shutdown Cooling Containment Spray Charging Letdown Boric Acid Makeup Waste Management Main Steam Feedwater Auxiliary Feedwater Steam Generator Blowdown Component Cooling Water Intake Cooling Water S5>01OO108 SOOO>>5 5gOO4 PDR ADOCH 0 PDR Q
PEOPLE.. SERVING PEof'LE
<'p'P~M~q
~ W"!~+~+4'<p'p gpfQ "p(g,~pa~
sS k1gpg~ <;~ 'rYc4'g(,,i Pp$ +',~f~ ~l,"~~~~~ ~ ~p
~~ IF~
't e
Page 2
Office of Nuclear Reactor Regulation Mr. Hugh L. Thompson, 3r., Director For the upcoming'St. Lucie Unit I refueling outage, we intend to implement the IIT on the discharge side of the Charging System and on the Class l portions of the HPSI, LPSI and Letdown Systems.
Although we have chosen to conduct the ASME Section,'XI Code,","System Hydrostatic Test" of IWA-52ll(d) on the NSSS portion of -the, Reactor, Coolant
- System, the 117 may also be implemented selectively within that boundary.
St. Lucie Unit',l,is, scheduled to shut down for refueling on October 20, l985.
Because we would like to implement the IIT on some of the above systems during the upcoming refueling outage, we request your approval by October 18, 1985.
We are available at your convenience, if needed, to discuss this matter further.
It should be noted that FPL recognizes the capability of the IIT method to determine intersystem
- leakage, and therefore, may opt to take credit for this method to satisfy.IST Program and Technical Specification requirements where appropriate.
s Very truly yours,.'"..
~Aalu'~
3.W. Williams, 3r.
Group Vice President
~
Nuclear Energy 3WW/R3S/mls PNS-LI-85-306/2