L-78-180, Response to Nrc'S 5/17/1978 Letter, Fp&L'S Commitment to Complete Testing Concerning Resistance Temperature Detector Response Times by 12/1/1978
ML18114A181 | |
Person / Time | |
---|---|
Site: | Saint Lucie |
Issue date: | 05/19/1978 |
From: | Robert E. Uhrig Florida Power & Light Co |
To: | Reid R Office of Nuclear Reactor Regulation |
References | |
L-78-180 | |
Download: ML18114A181 (5) | |
Similar Documents at Saint Lucie | |
---|---|
Category:Letter type:L
MONTHYEARL-2024-132, 2024 Population Update Analysis2024-08-13013 August 2024
[Table view]2024 Population Update Analysis L-2024-129, Relief Request (RR) 14. Limited Coverage Exams Due to Impractical Inservice Inspection Requirements - Fourth Ten-Year Inservice Inspection Program Interval2024-08-0707 August 2024 Relief Request (RR) 14. Limited Coverage Exams Due to Impractical Inservice Inspection Requirements - Fourth Ten-Year Inservice Inspection Program Interval L-2024-121, Subsequent License Renewal Commitment 30 Revision2024-07-30030 July 2024 Subsequent License Renewal Commitment 30 Revision L-2024-123, Submittal of In-Service Inspection Program Owners Activity Report (OAR-1)2024-07-29029 July 2024 Submittal of In-Service Inspection Program Owners Activity Report (OAR-1) L-2024-125, Notice of Intent to Provide Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-07-24024 July 2024 Notice of Intent to Provide Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes L-2024-110, Environmental Protection Plan Report, Unusual or Important Environmental Event - Manatee in Intake2024-07-10010 July 2024 Environmental Protection Plan Report, Unusual or Important Environmental Event - Manatee in Intake L-2024-114, Quality Assurance Topical Report (FPL-1 Revision 31 Annual Submittal2024-07-10010 July 2024 Quality Assurance Topical Report (FPL-1 Revision 31 Annual Submittal L-2024-109, Schedule for Subsequent License Renewal Environmental Review2024-07-0303 July 2024 Schedule for Subsequent License Renewal Environmental Review L-2024-104, Response to Request for Additional Information, St. Luce Relief Request (RR) 7, Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1 Extension of Inspection Interval for Reactor Pressure Vessel Welds from 102024-06-26026 June 2024 Response to Request for Additional Information, St. Luce Relief Request (RR) 7, Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1 Extension of Inspection Interval for Reactor Pressure Vessel Welds from 10 L-2024-097, Technical Specification Special Report2024-06-20020 June 2024 Technical Specification Special Report L-2024-102, Official Service List Update2024-06-19019 June 2024 Official Service List Update L-2024-090, Revised Steam Generator Tube Inspection Reports2024-06-0404 June 2024 Revised Steam Generator Tube Inspection Reports L-2024-075, Notification of Improved Standard Technical Specifications (ITS) Implementation2024-05-13013 May 2024 Notification of Improved Standard Technical Specifications (ITS) Implementation L-2024-053, License Amendment Request L-2024-053, Updated Spent Fuel Pool Criticality Analysis2024-04-30030 April 2024 License Amendment Request L-2024-053, Updated Spent Fuel Pool Criticality Analysis L-2024-070, Cycle 32 Core Operating Limits Report2024-04-29029 April 2024 Cycle 32 Core Operating Limits Report L-2024-071, Cycle 27 Core Operating Limits Report2024-04-29029 April 2024 Cycle 27 Core Operating Limits Report L-2024-056, Annual Radiological Environmental Operating Report for Calendar Year 20232024-04-17017 April 2024 Annual Radiological Environmental Operating Report for Calendar Year 2023 L-2024-064, Florida Power & Light Company - 10 CFR 50.46 - Emergency Core Cooling System SBLOCA 30-Day Report2024-04-17017 April 2024 Florida Power & Light Company - 10 CFR 50.46 - Emergency Core Cooling System SBLOCA 30-Day Report L-2024-010, Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3)2024-01-25025 January 2024 Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3) L-2024-004, Relief Request (RR) 7, Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1) Extension of Inspection Interval for Reactor Pressure Vessel Welds from 10 to 20 Years2024-01-18018 January 2024 Relief Request (RR) 7, Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1) Extension of Inspection Interval for Reactor Pressure Vessel Welds from 10 to 20 Years L-2024-002, Withdrawal of Proposed Alternative to American Society of Mechanical Engineers (ASME) Operation and Maintenance (OM) Code for the Auxiliary Feedwater (AFW) 2C Pump2024-01-0808 January 2024 Withdrawal of Proposed Alternative to American Society of Mechanical Engineers (ASME) Operation and Maintenance (OM) Code for the Auxiliary Feedwater (AFW) 2C Pump L-2023-173, Quality Assurance Topical Report (FPL-1) Revision 30 Update2023-12-15015 December 2023 Quality Assurance Topical Report (FPL-1) Revision 30 Update L-2023-179, Unusual or Important Environmental Event - Turtle Mortality2023-12-14014 December 2023 Unusual or Important Environmental Event - Turtle Mortality L-2023-168, License Amendment Request Supplement to Revision 2 for the Technical Specifications Conversion to NUREG-1432 Revision 52023-12-12012 December 2023 License Amendment Request Supplement to Revision 2 for the Technical Specifications Conversion to NUREG-1432 Revision 5 L-2023-155, Supplement to Response to Request for Additional Information, Revised NextEra Common Emergency Plan, and Revised Site-Specific Emergency Plan Annexes Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-06542023-11-28028 November 2023 Supplement to Response to Request for Additional Information, Revised NextEra Common Emergency Plan, and Revised Site-Specific Emergency Plan Annexes Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, L-2023-162, Response to 50.69 2nd Round of Rals2023-11-21021 November 2023 Response to 50.69 2nd Round of Rals L-2023-131, Subsequent License Renewal Application - Second Annual Update2023-09-28028 September 2023 Subsequent License Renewal Application - Second Annual Update L-2023-136, Supplement to License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors2023-09-26026 September 2023 Supplement to License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors L-2023-122, Corrections to the 2022 Annual Radiological Environmental Operating Report2023-09-20020 September 2023 Corrections to the 2022 Annual Radiological Environmental Operating Report L-2023-127, Correction to the 2022 Annual Radioactive Effluent Release Report2023-09-18018 September 2023 Correction to the 2022 Annual Radioactive Effluent Release Report L-2023-113, Correction to the 2020 Annual Radiological Environmental Operating Report2023-09-14014 September 2023 Correction to the 2020 Annual Radiological Environmental Operating Report L-2023-118, Response to Request for Additional Information Regarding License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors2023-09-11011 September 2023 Response to Request for Additional Information Regarding License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors L-2023-108, Report of 10 CFR 50.59 Plant Changes2023-09-11011 September 2023 Report of 10 CFR 50.59 Plant Changes L-2023-107, Technical Specification Bases Control Program Periodic Report of Bases Changes TS 6.8.4.j.42023-09-0606 September 2023 Technical Specification Bases Control Program Periodic Report of Bases Changes TS 6.8.4.j.4 L-2023-112, Corrections to the 2021 Annual Radioactive Effluent Release Report2023-09-0606 September 2023 Corrections to the 2021 Annual Radioactive Effluent Release Report L-2023-114, Proposed Turkey Point Units 6 and 7; Seabrook Station; Point Beach Units 1 and 2 - Official Service List Update2023-08-17017 August 2023 Proposed Turkey Point Units 6 and 7; Seabrook Station; Point Beach Units 1 and 2 - Official Service List Update L-2023-098, and Point Beach Units 1 and 2 - Response to Request for Additional Information Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 22023-08-0707 August 2023 and Point Beach Units 1 and 2 - Response to Request for Additional Information Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 2 L-2023-105, Preparation and Scheduling of Operator Licensing Examinations2023-08-0303 August 2023 Preparation and Scheduling of Operator Licensing Examinations L-2023-099, Pump Relief Request 10 (PR-10), One-Time Request for an Alternative to the American Society of Mechanical Engineers (ASME) Operation and Maintenance (OM) Code for the Auxiliary Feedwater (AFW) 2C Pump2023-07-26026 July 2023 Pump Relief Request 10 (PR-10), One-Time Request for an Alternative to the American Society of Mechanical Engineers (ASME) Operation and Maintenance (OM) Code for the Auxiliary Feedwater (AFW) 2C Pump L-2023-102, Relief Request PSL2-15-RR-01, Proposed Alternative to ASME Section XI Code Examination Requirements for Reactor Vessel Bottom Area and Piping in Covered Trenches2023-07-26026 July 2023 Relief Request PSL2-15-RR-01, Proposed Alternative to ASME Section XI Code Examination Requirements for Reactor Vessel Bottom Area and Piping in Covered Trenches L-2023-097, Subsequent License Renewal Application Revision 1 - Supplement 62023-07-13013 July 2023 Subsequent License Renewal Application Revision 1 - Supplement 6 L-2023-076, In-Service Inspection Program Owner'S Activity Report (OAR-1)2023-07-11011 July 2023 In-Service Inspection Program Owner'S Activity Report (OAR-1) L-2023-087, Florida Power & Light/Nextera Energy, Results of the Safety Culture Program Effectiveness Review, March 20, 2023 (ADAMS Accession No. ML22340A452)2023-06-29029 June 2023 Florida Power & Light/Nextera Energy, Results of the Safety Culture Program Effectiveness Review, March 20, 2023 (ADAMS Accession No. ML22340A452) L-2023-082, Subsequent License Renewal Application Revision 1, Supplement 52023-06-14014 June 2023 Subsequent License Renewal Application Revision 1, Supplement 5 L-2023-074, Addendum to 2021 Decommissioning Funding Status Reports / Independent Spent Fuel Storage Installation Ctsfsi) Financial Assurance Update2023-06-0202 June 2023 Addendum to 2021 Decommissioning Funding Status Reports / Independent Spent Fuel Storage Installation Ctsfsi) Financial Assurance Update L-2023-071, NextEra Energy Quality Assurance Topical Report (FPL-1) Revision 29 and Florida Power and Light Company Quality Assurance Program Description for 10 CFR Part 52 Licenses (FPL-2) Revision 11, Annual Submittal2023-05-22022 May 2023 NextEra Energy Quality Assurance Topical Report (FPL-1) Revision 29 and Florida Power and Light Company Quality Assurance Program Description for 10 CFR Part 52 Licenses (FPL-2) Revision 11, Annual Submittal L-2023-059, Subsequent License Renewal Application - Aging Management Requests for Additional Information (RAI) Set 4 Supplemental Response2023-04-21021 April 2023 Subsequent License Renewal Application - Aging Management Requests for Additional Information (RAI) Set 4 Supplemental Response L-2023-055, 2022 Annual Environmental Operating Report2023-04-12012 April 2023 2022 Annual Environmental Operating Report L-2023-041, Annual Radiological Environmental Operating Report for Calendar Year 20222023-04-0404 April 2023 Annual Radiological Environmental Operating Report for Calendar Year 2022 L-2023-051, Report of 10 CFR 50.59 Plant Changes2023-04-0404 April 2023 Report of 10 CFR 50.59 Plant Changes 2024-08-07 Category:Response to Request for Additional Information (RAI) MONTHYEARL-2024-104, Response to Request for Additional Information, St. Luce Relief Request (RR) 7, Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1 Extension of Inspection Interval for Reactor Pressure Vessel Welds from 102024-06-26026 June 2024
[Table view]Response to Request for Additional Information, St. Luce Relief Request (RR) 7, Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1 Extension of Inspection Interval for Reactor Pressure Vessel Welds from 10 ML24127A0632024-05-0606 May 2024 Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes L-2023-155, Supplement to Response to Request for Additional Information, Revised NextEra Common Emergency Plan, and Revised Site-Specific Emergency Plan Annexes Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-06542023-11-28028 November 2023 Supplement to Response to Request for Additional Information, Revised NextEra Common Emergency Plan, and Revised Site-Specific Emergency Plan Annexes Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, L-2023-162, Response to 50.69 2nd Round of Rals2023-11-21021 November 2023 Response to 50.69 2nd Round of Rals L-2023-118, Response to Request for Additional Information Regarding License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors2023-09-11011 September 2023 Response to Request for Additional Information Regarding License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors L-2023-098, and Point Beach Units 1 and 2 - Response to Request for Additional Information Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 22023-08-0707 August 2023 and Point Beach Units 1 and 2 - Response to Request for Additional Information Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 2 L-2023-059, Subsequent License Renewal Application - Aging Management Requests for Additional Information (RAI) Set 4 Supplemental Response2023-04-21021 April 2023 Subsequent License Renewal Application - Aging Management Requests for Additional Information (RAI) Set 4 Supplemental Response L-2023-026, Subsequent License Renewal Application - Aging Management Requests for Additional Information Set 42023-03-27027 March 2023 Subsequent License Renewal Application - Aging Management Requests for Additional Information Set 4 ML23013A2032023-01-13013 January 2023 RAI Set 4 Draft Response L-2022-165, Subsequent License Renewal Application - Aging Management Request for Additional Information (RAI) 4.3.1-1a(second Round) - Class 1 Fatigue Response2022-10-26026 October 2022 Subsequent License Renewal Application - Aging Management Request for Additional Information (RAI) 4.3.1-1a(second Round) - Class 1 Fatigue Response L-2022-156, Correction to Subsequent License Renewal Application - Aging Management Requests for Additional Information (RAI) Set 1a Response2022-09-19019 September 2022 Correction to Subsequent License Renewal Application - Aging Management Requests for Additional Information (RAI) Set 1a Response L-2022-143, Subsequent License Renewal Application - Aging Management Requests for Additional Information Set 1A Response2022-09-0808 September 2022 Subsequent License Renewal Application - Aging Management Requests for Additional Information Set 1A Response L-2022-115, Subsequent License Renewal Application - Aging Management Requests for Additional Information (RAI) Set 3 Response and Submittal of Superseded Response for One Set 2 RAI and One Supplement 1 Attachment2022-08-0909 August 2022 Subsequent License Renewal Application - Aging Management Requests for Additional Information (RAI) Set 3 Response and Submittal of Superseded Response for One Set 2 RAI and One Supplement 1 Attachment L-2022-108, Subsequent License Renewal Application - Aging Management Requests for Additional Information (RAI) Set 2 Response2022-07-11011 July 2022 Subsequent License Renewal Application - Aging Management Requests for Additional Information (RAI) Set 2 Response L-2022-075, Subsequent License Renewal Application-Aging Management Requests for Additional Information (RAI) Set 1A Response and Request for Confirmation of Information (RCI) Set 1 Response2022-06-13013 June 2022 Subsequent License Renewal Application-Aging Management Requests for Additional Information (RAI) Set 1A Response and Request for Confirmation of Information (RCI) Set 1 Response L-2022-000, License Amendment Request for the Technical Specifications Conversion to NUREG- 1432 Revision 5 - Request for Supplemental Information (Rsi) Response2022-01-19019 January 2022 License Amendment Request for the Technical Specifications Conversion to NUREG- 1432 Revision 5 - Request for Supplemental Information (Rsi) Response L-2021-105, Response to Request for Additional Information for St. Lucie License Amendment Request to Allow Risk Informed Completion Times (RICT) for the 120-Volt AC Instrument Bus Requirements2021-05-12012 May 2021 Response to Request for Additional Information for St. Lucie License Amendment Request to Allow Risk Informed Completion Times (RICT) for the 120-Volt AC Instrument Bus Requirements L-2021-065, Response to Request for Additional Information. Relief Request Number RR 15, Extension of St. Lucie Unit 2 RPV Welds from 10 to 20 Years2021-04-0101 April 2021 Response to Request for Additional Information. Relief Request Number RR 15, Extension of St. Lucie Unit 2 RPV Welds from 10 to 20 Years L-2020-165, Supplement to Updated Final Response to NRC Generic Letter 2004-022020-12-0404 December 2020 Supplement to Updated Final Response to NRC Generic Letter 2004-02 L-2020-094, Supplemental Response to Request for Additional Information Regarding License Amendment Request to Modify the Reactor Coolant Pump (RCP) Flywheel Inspection Program Requirements2020-06-26026 June 2020 Supplemental Response to Request for Additional Information Regarding License Amendment Request to Modify the Reactor Coolant Pump (RCP) Flywheel Inspection Program Requirements L-2020-061, Response to Request for Additional Information Regarding License Amendment Request to Modify the Reactor Coolant Pump (RCP) Flywheel Inspection Program Requirements2020-04-30030 April 2020 Response to Request for Additional Information Regarding License Amendment Request to Modify the Reactor Coolant Pump (RCP) Flywheel Inspection Program Requirements ML20015A0282020-01-14014 January 2020 NMFS to NRC, Concurrence with Interim Response to Requests for Additional Information for St. Lucie Endangered Species Act Section 7 Consultation L-2019-164, Response to Request for Additional Information Regarding License Amendment Request to Relocate the MOV Thermal Overload Protection Bypass Devices Requirements to Licensee Control2019-09-11011 September 2019 Response to Request for Additional Information Regarding License Amendment Request to Relocate the MOV Thermal Overload Protection Bypass Devices Requirements to Licensee Control L-2019-166, Refueling Outage SL2-24 Steam Generator Tube Inspection Report RAI Response2019-08-21021 August 2019 Refueling Outage SL2-24 Steam Generator Tube Inspection Report RAI Response L-2019-153, Exigent Technical Specification Amendment Request Supplemental RAI Reply One-Time Allowed Outage Time Extension for Inoperable EDG2019-07-25025 July 2019 Exigent Technical Specification Amendment Request Supplemental RAI Reply One-Time Allowed Outage Time Extension for Inoperable EDG L-2019-149, Exigent Technical Specification Amendment Request RAI Reply One-Time Allowed Outage Time Extension for Inoperable EDG2019-07-24024 July 2019 Exigent Technical Specification Amendment Request RAI Reply One-Time Allowed Outage Time Extension for Inoperable EDG L-2019-118, Response to Request for Additional Information Regarding License Amendment Request to Allow Performance of Selected Emergency Diesel Generator (EDG) Surveillance Requirements (Srs) During Power Operation2019-06-28028 June 2019 Response to Request for Additional Information Regarding License Amendment Request to Allow Performance of Selected Emergency Diesel Generator (EDG) Surveillance Requirements (Srs) During Power Operation L-2019-107, License Amendment Request - Iodine Removal System Elimination2019-05-17017 May 2019 License Amendment Request - Iodine Removal System Elimination L-2019-056, Inservice Inspection Plan RAI Reply, Fifth Ten-Year Interval Unit 1 Relief Request2019-03-0707 March 2019 Inservice Inspection Plan RAI Reply, Fifth Ten-Year Interval Unit 1 Relief Request L-2018-205, Response to Request for Additional Information Regarding License Amendment Request to Reduce the Number of Control Element Assemblies2018-11-15015 November 2018 Response to Request for Additional Information Regarding License Amendment Request to Reduce the Number of Control Element Assemblies L-2018-153, Supplemental Information for License Amendment Request to Reduce the Number of Control Element Assemblies2018-08-17017 August 2018 Supplemental Information for License Amendment Request to Reduce the Number of Control Element Assemblies L-16-001, Units. 3 and 4, Response to Request for Supplemental Information Generic Letter 2016-01, Monitoring of Neutron-Absorbing Materials in Spent Fuel Pools.2018-05-24024 May 2018 Units. 3 and 4, Response to Request for Supplemental Information Generic Letter 2016-01, Monitoring of Neutron-Absorbing Materials in Spent Fuel Pools. L-2018-068, Florida Power and Light Co. - Response to Request for Additional Information Re Decommissioning Funding Plan Updates for Independent Spent Fuel Storage Installations2018-04-0303 April 2018 Florida Power and Light Co. - Response to Request for Additional Information Re Decommissioning Funding Plan Updates for Independent Spent Fuel Storage Installations L-77-291, Attachment a to L-77-291 Response to NRC Questions of May 24, 19772018-03-29029 March 2018 Attachment a to L-77-291 Response to NRC Questions of May 24, 1977 L-2018-040, Response to Request for Additional Information Regarding License Amendment Request to Add New Required Actions for an Inoperable Auxiliary Feedwater Pump Steam Supply2018-02-14014 February 2018 Response to Request for Additional Information Regarding License Amendment Request to Add New Required Actions for an Inoperable Auxiliary Feedwater Pump Steam Supply L-2018-006, Third Response to Request for Additional Information Regarding License Amendment Request to Adopt Risk Informed Completion Times TSTF-505, Revision 1, Provide Risk-Risk Informed Extended Completion Times - RITSTF Initiative 4b2018-02-0101 February 2018 Third Response to Request for Additional Information Regarding License Amendment Request to Adopt Risk Informed Completion Times TSTF-505, Revision 1, Provide Risk-Risk Informed Extended Completion Times - RITSTF Initiative 4b L-2017-210, Updated Final Response to NRC Generic Letter 2004-022017-12-20020 December 2017 Updated Final Response to NRC Generic Letter 2004-02 L-2017-216, License Renewal Commitments: Reactor Vessel Internals Aging Management Plan, Clarification of Responses to RAI 1 and RAI 62017-12-19019 December 2017 License Renewal Commitments: Reactor Vessel Internals Aging Management Plan, Clarification of Responses to RAI 1 and RAI 6 L-2017-209, Response to Request for Additional Information Regarding Fifth 10-Year Inservice Testing (IST) Program Interval Relief Request PR-012017-11-30030 November 2017 Response to Request for Additional Information Regarding Fifth 10-Year Inservice Testing (IST) Program Interval Relief Request PR-01 L-2017-159, Response to Request for Additional Information Regarding Inservice Inspection Plan, Fifth Ten-Year Interval Unit 1 Relief Request No. 3, Revision 02017-09-13013 September 2017 Response to Request for Additional Information Regarding Inservice Inspection Plan, Fifth Ten-Year Interval Unit 1 Relief Request No. 3, Revision 0 L-2017-116, Response to Request for Additional Information Regarding License Amendment Request to Revise the Technical Specifications (TS) for the Reactor Protection System (RPS) Power Rate-of-Change Instrumentation and Add New TS 3.0.52017-07-0303 July 2017 Response to Request for Additional Information Regarding License Amendment Request to Revise the Technical Specifications (TS) for the Reactor Protection System (RPS) Power Rate-of-Change Instrumentation and Add New TS 3.0.5 L-2016-220, License Amendment Request EDG Day Tank Fuel Volume Change2016-12-0505 December 2016 License Amendment Request EDG Day Tank Fuel Volume Change L-2016-188, Response to Generic Letter 2016-01, Monitoring of Neutron Absorbing Materials in Spent Fuel Pools, Response to NRC Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f)2016-11-0303 November 2016 Response to Generic Letter 2016-01, Monitoring of Neutron Absorbing Materials in Spent Fuel Pools, Response to NRC Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) L-2016-153, Response to Request for Additional Information Regarding License Amendment Request for Biological Opinion License Changes2016-08-11011 August 2016 Response to Request for Additional Information Regarding License Amendment Request for Biological Opinion License Changes L-2016-135, Second Response to Request for Additional Information Regarding License Amendment Request to Adopt TSTF-505, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4B2016-07-22022 July 2016 Second Response to Request for Additional Information Regarding License Amendment Request to Adopt TSTF-505, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4B L-2016-143, Response to Request for Additional Information for the Proposed Technical Specification Change to Remove the 10 Year Sediment Cleaning of the Fuel Oil Storage Tank and Relocate to Licensee-Controlled Documents2016-07-15015 July 2016 Response to Request for Additional Information for the Proposed Technical Specification Change to Remove the 10 Year Sediment Cleaning of the Fuel Oil Storage Tank and Relocate to Licensee-Controlled Documents L-2016-114, Response to Request for Additional Information Regarding License Amendment Request to Adopt TSTF-505, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 48.2016-07-0808 July 2016 Response to Request for Additional Information Regarding License Amendment Request to Adopt TSTF-505, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 48. L-2016-102, RAI Reply - License Amendment Request, Containment Vacuum Gothic Analyses and Conforming Changes2016-05-0606 May 2016 RAI Reply - License Amendment Request, Containment Vacuum Gothic Analyses and Conforming Changes L-2016-104, RAI Reply - Application for Technical Specification Change Regarding Moderator Temperature Coefficient (Mtc) Surveillance Test Elimination at the End of Cycle2016-05-0606 May 2016 RAI Reply - Application for Technical Specification Change Regarding Moderator Temperature Coefficient (Mtc) Surveillance Test Elimination at the End of Cycle L-2016-096, Inservice Inspection Plan, RAI Reply for Fourth Ten-Year Interval Relief Request No. 10, Revision 02016-04-21021 April 2016 Inservice Inspection Plan, RAI Reply for Fourth Ten-Year Interval Relief Request No. 10, Revision 0 2024-06-26 |
Text
REGULATORY INFORMATION DISTRIBUTION SYSTFM < RIDS)
DISTRIBUTION FOR INCOMING MATERIAL 50-335 REC: REID R W ORG: UHRIG R E DOCD ATE: 05/19/78 NRC FL PWR b LIGHT DATE RCVD: 05/24/78 DOCTYPE: LETTER NOTARIZED: NQ COPIES RECEIVED
SUBJECT:
LTR 3 ENCL 0 i RESPONSE TO NRC LTR DTD 05/17/78... FURNISHING INFO CONCERNING RESISTANCE TEMPERATURE DETECTOR RESPONSE TIMES OF SUBJECT FACILITY AND ADVISING STATUS REPT ALONG WITH THE FIRST SURVEILLANCE TEST RESULTS RE SUBJECT> WILL BE SUBMITTED BY 12/01/78.
PLANT NAME: ST LUCIE ei REVI El JER INITIAL: X Jg
. DISTRIBUTOR INITIAL:PJQ
>>>>>>>>>>>>>>>>> DISTRIBUTION OF THIS MATERIAL IS AS FOLLOWS GENERAL DISTRIBUTION FOR AFTER ISSUANCE OF OPERATING LICENSE.
<DISTRIBUTION CODE A001)
FOR ACTION: BR CHIEF REID<s~LTR ONLY < 7)
INTERNAL: T QNLY<1) NRC PDR>>LTR'ONLY<i)
I 8. E>>LTR ONLY(2> OELD+4lLTR ONLY(i>
HANAUER4~~I TR ONLY< 1) CHECK>>LTR ONLY<i)
EISENHUT>>LTR ONLY (1 > SHAQ>>LTR ONLY(i>
BAER+~~LTR ONLY < 1 ) BUTLER>>LTR ONLY<i)
EEB>>LTR ONLY(1> J COLLINS>>LTR ONLY(i)
J. MCGQUGH>>LTR ONLY < 1 )
EXTERNAL: LPDR S FT PIERCEI FL>>LTR ONLY(1)
TIC>>LTR ONLY(1)
NSIC>>LTR ONLY(i >
ACRS CAT B>>LTR ONLY(16)
DISTRIBUTION: LTR 40 ENCL 0 CONTROL NBR: 78145000 SIZE: 2P
>>>>>>>>>>>>>>>>>>0$ >>08%%%%%>>%SHE>>% THE END
e FLORIDA POWER 8c LIGHT COMPANY May 19, 1978 L-78-180 fi 1
Office of Nuclear Reactor Regulation Attention: Mr. R. W. Reid, Chief Operating Reactors Branch 54 Division of Operating Reactors It U. S. Nuclear Regulatory Commission Washington, D. C. 20555
Dear Mr. Reid:
Re: St. Lucie Unit No. 1 Docket No. 50-335 Resistance Temperature Detector (RTD)
Res onse Times Xour letter of May 17, 1978, requested that FPL provide information to show that the RTD time constant will not exceed 8 seconds during the test interval of 18 months and to demonstrate the validity of the Loop Current Step Response testing methodology.
As suggested in your letter, and based upon the discussion held with your staff on May l9, 1978, in which certain testing require-ments were specified, we understand that the following combination of RTD replacement, increased testing frequency for all RTD's, and comparative methodological testing is acceptable:
- l. Replacement of the 4 RTD's which were LCSR-tested in January 1978 with available spares.
- 2. Comparative testing of the 4 replaced RTD's, along with 4 new ones to be procured during Cycle 2, using both the previously accepted plunge test method and the LCSR method at both cold (170'F) conditions and, to the extent practicable, hot (540'F) conditions.
7e145Oooa PEOPLE. ~ . SERVING PEOPLE
0 e flL
/<
- I II I.
l, 1I
Mf. M. W. Reid 0 May 19, 1978 Page Two L-78-180
- 3. Surveillance testing of all 16 safety-related RTD's using the LCSR method within 6 months and 12 months after Cycle 2 startup.
Xt is our commitment to complete the actions described above during Cycle 2. We expect to have some results from the comparative test program in approximately 6 months and will submit a status report, along with the first surveillance test results, by December 1, 1978.
Very truly yours, Robert E. Uhrig Vice President REU:MAS:sl cc: Mr. Peter B. Erickson Mr. James P. O'Reilly, Region Harold F. Reis, Esquire II