MONTHYEARL-2024-158, Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-09-25025 September 2024 Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes L-2024-136, Supplement to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-09-16016 September 2024 Supplement to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes L-2024-138, License Amendment Request L-2024-138, Fuel Methodology Changes in Support of St. Lucie, Unit 2 Transition to 24-Month Fuel Cycles2024-09-11011 September 2024 License Amendment Request L-2024-138, Fuel Methodology Changes in Support of St. Lucie, Unit 2 Transition to 24-Month Fuel Cycles L-2024-148, Submittal of Offsite Dose Calculation Manual (Odcm), Revision 552024-09-0909 September 2024 Submittal of Offsite Dose Calculation Manual (Odcm), Revision 55 L-2024-140, Cycle 28 Core Operating Limits Report2024-08-14014 August 2024 Cycle 28 Core Operating Limits Report L-2024-133, Snubber Program Plan Submittal2024-08-14014 August 2024 Snubber Program Plan Submittal L-2024-132, 2024 Population Update Analysis2024-08-13013 August 2024 2024 Population Update Analysis L-2024-129, Relief Request (RR) 14. Limited Coverage Exams Due to Impractical Inservice Inspection Requirements - Fourth Ten-Year Inservice Inspection Program Interval2024-08-0707 August 2024 Relief Request (RR) 14. Limited Coverage Exams Due to Impractical Inservice Inspection Requirements - Fourth Ten-Year Inservice Inspection Program Interval L-2024-121, Subsequent License Renewal Commitment 30 Revision2024-07-30030 July 2024 Subsequent License Renewal Commitment 30 Revision L-2024-123, Submittal of In-Service Inspection Program Owners Activity Report (OAR-1)2024-07-29029 July 2024 Submittal of In-Service Inspection Program Owners Activity Report (OAR-1) L-2024-125, Notice of Intent to Provide Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-07-24024 July 2024 Notice of Intent to Provide Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes L-2024-117, Safety Injection Tank Vent Through Wall Leakage2024-07-11011 July 2024 Safety Injection Tank Vent Through Wall Leakage L-2024-114, Quality Assurance Topical Report (FPL-1 Revision 31 Annual Submittal2024-07-10010 July 2024 Quality Assurance Topical Report (FPL-1 Revision 31 Annual Submittal L-2024-110, Environmental Protection Plan Report, Unusual or Important Environmental Event - Manatee in Intake2024-07-10010 July 2024 Environmental Protection Plan Report, Unusual or Important Environmental Event - Manatee in Intake L-2024-109, Schedule for Subsequent License Renewal Environmental Review2024-07-0303 July 2024 Schedule for Subsequent License Renewal Environmental Review L-2024-104, Response to Request for Additional Information, St. Luce Relief Request (RR) 7, Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1 Extension of Inspection Interval for Reactor Pressure Vessel Welds from 102024-06-26026 June 2024 Response to Request for Additional Information, St. Luce Relief Request (RR) 7, Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1 Extension of Inspection Interval for Reactor Pressure Vessel Welds from 10 L-2024-097, Technical Specification Special Report2024-06-20020 June 2024 Technical Specification Special Report L-2024-102, Official Service List Update2024-06-19019 June 2024 Official Service List Update L-2024-090, Revised Steam Generator Tube Inspection Reports2024-06-0404 June 2024 Revised Steam Generator Tube Inspection Reports L-2024-075, Notification of Improved Standard Technical Specifications (ITS) Implementation2024-05-13013 May 2024 Notification of Improved Standard Technical Specifications (ITS) Implementation L-2024-053, License Amendment Request L-2024-053, Updated Spent Fuel Pool Criticality Analysis2024-04-30030 April 2024 License Amendment Request L-2024-053, Updated Spent Fuel Pool Criticality Analysis L-2024-070, Cycle 32 Core Operating Limits Report2024-04-29029 April 2024 Cycle 32 Core Operating Limits Report L-2024-071, Cycle 27 Core Operating Limits Report2024-04-29029 April 2024 Cycle 27 Core Operating Limits Report L-2024-064, Florida Power & Light Company - 10 CFR 50.46 - Emergency Core Cooling System SBLOCA 30-Day Report2024-04-17017 April 2024 Florida Power & Light Company - 10 CFR 50.46 - Emergency Core Cooling System SBLOCA 30-Day Report L-2024-056, Annual Radiological Environmental Operating Report for Calendar Year 20232024-04-17017 April 2024 Annual Radiological Environmental Operating Report for Calendar Year 2023 L-2024-054, 2023 Annual Environmental Operating Report2024-04-0909 April 2024 2023 Annual Environmental Operating Report L-2024-047, Proposed Use of a Subsequent ASME Code Edition and Addenda2024-03-28028 March 2024 Proposed Use of a Subsequent ASME Code Edition and Addenda L-2024-045, Report of 10 CFR 72.48 Plant Changes2024-03-27027 March 2024 Report of 10 CFR 72.48 Plant Changes L-2024-011, and Point Beach, Units 1 and 2 - 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications2024-03-13013 March 2024 and Point Beach, Units 1 and 2 - 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications L-2024-023, Unusual or Important Environmental Event - Turtle Mortality2024-03-0606 March 2024 Unusual or Important Environmental Event - Turtle Mortality L-2024-015, 2023 Annual Radioactive Effluent Release Report2024-02-29029 February 2024 2023 Annual Radioactive Effluent Release Report L-2024-027, Safety Injection Tank Vent Through Wall Leakage2024-02-29029 February 2024 Safety Injection Tank Vent Through Wall Leakage L-2024-029, 2023 Annual Operating Report2024-02-28028 February 2024 2023 Annual Operating Report L-2024-026, Revised Reactor Vessel Materials Surveillance Capsule Withdrawal Schedules2024-02-27027 February 2024 Revised Reactor Vessel Materials Surveillance Capsule Withdrawal Schedules L-2024-010, Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3)2024-01-25025 January 2024 Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3) L-2024-004, Relief Request (RR) 7, Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1) Extension of Inspection Interval for Reactor Pressure Vessel Welds from 10 to 20 Years2024-01-18018 January 2024 Relief Request (RR) 7, Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1) Extension of Inspection Interval for Reactor Pressure Vessel Welds from 10 to 20 Years L-2024-002, Withdrawal of Proposed Alternative to American Society of Mechanical Engineers (ASME) Operation and Maintenance (OM) Code for the Auxiliary Feedwater (AFW) 2C Pump2024-01-0808 January 2024 Withdrawal of Proposed Alternative to American Society of Mechanical Engineers (ASME) Operation and Maintenance (OM) Code for the Auxiliary Feedwater (AFW) 2C Pump L-2023-173, Quality Assurance Topical Report (FPL-1) Revision 30 Update2023-12-15015 December 2023 Quality Assurance Topical Report (FPL-1) Revision 30 Update L-2023-179, Unusual or Important Environmental Event - Turtle Mortality2023-12-14014 December 2023 Unusual or Important Environmental Event - Turtle Mortality L-2023-168, License Amendment Request Supplement to Revision 2 for the Technical Specifications Conversion to NUREG-1432 Revision 52023-12-12012 December 2023 License Amendment Request Supplement to Revision 2 for the Technical Specifications Conversion to NUREG-1432 Revision 5 L-2023-175, Supplement to Exemption Request Regarding Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Final Rule2023-11-29029 November 2023 Supplement to Exemption Request Regarding Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Final Rule L-2023-155, Supplement to Response to Request for Additional Information, Revised NextEra Common Emergency Plan, and Revised Site-Specific Emergency Plan Annexes Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-06542023-11-28028 November 2023 Supplement to Response to Request for Additional Information, Revised NextEra Common Emergency Plan, and Revised Site-Specific Emergency Plan Annexes Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, L-2023-162, Response to 50.69 2nd Round of Rals2023-11-21021 November 2023 Response to 50.69 2nd Round of Rals L-2023-131, Subsequent License Renewal Application - Second Annual Update2023-09-28028 September 2023 Subsequent License Renewal Application - Second Annual Update L-2023-136, Supplement to License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors2023-09-26026 September 2023 Supplement to License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors L-2023-122, Corrections to the 2022 Annual Radiological Environmental Operating Report2023-09-20020 September 2023 Corrections to the 2022 Annual Radiological Environmental Operating Report L-2023-127, Correction to the 2022 Annual Radioactive Effluent Release Report2023-09-18018 September 2023 Correction to the 2022 Annual Radioactive Effluent Release Report L-2023-113, Correction to the 2020 Annual Radiological Environmental Operating Report2023-09-14014 September 2023 Correction to the 2020 Annual Radiological Environmental Operating Report L-2023-118, Response to Request for Additional Information Regarding License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors2023-09-11011 September 2023 Response to Request for Additional Information Regarding License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors L-2023-108, Report of 10 CFR 50.59 Plant Changes2023-09-11011 September 2023 Report of 10 CFR 50.59 Plant Changes 2024-09-09
[Table view] |
Text
January 29, 2021 L-2021-008 10 CFR 50.4 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 RE: St. Lucie Units 1 and 2 Docket Nos. 50-335 and 50-389 Annual Summary of Commitment Changes Implemented Without Prior NRC Notification for Calendar Year 2020 Pursuant to the guidance of NRC Regulatory Issue Summary (RIS) 2000-17, Managing Regulatory Commitments Made by Power Reactor Licensees to the NRC Staff, and NRC endorsed Nuclear Energy Institute (NEI) 99-04, Guidelines for Managing NRC Commitment Changes, attached is a summary of St. Lucie commitments that were changed in accordance with the NextEra Energy Fleet NRC commitment management procedure during calendar year 2020.
Please contact Richard Sciscente at (772) 467-7156 if there are any questions regarding this submittal.
Sincerely, Wyatt Godes Licensing Manager St. Lucie Plant WG/rcs Attachment (3 Pages)
Florida Power & Light Company 6501 S. Ocean Drive, Jensen Beach, FL 34957
St. Lucie Units 1 and 2 L-2021-008 Docket Nos. 50-335 and 50-389 Attachment Annual Summary of Commitment Changes Implemented Without Prior NRC Notification for Calendar Year 2020 Source Document(s) Brief Commitment Summary Change Summary &
Bases for the Change Florida Power & Light Upon NRC approval of WCAP- Change Summary (FPL) letter L-2017- 17788, Comprehensive This commitment has been 210 dated December Analysis and Test Program for rescinded.
20, 2017, Updated GSl-191 Closure, the Bases for the Change Final Response to completed in-vessel blockage The commitment is appropriate for NRC Generic Letter analysis for St. Lucie will be rescission since the NRC revised 2004-02 reviewed and if warranted, a their approach to the post LOCA in-reanalysis will be performed vessel debris methodology outlined within six months following in WCAP-17788. In lieu of WCAP approval of the WCAP-17788 approval, in June 2019 the NRC methodology. issued a technical evaluation report (TER) which concluded that post-LOCA debris inside the reactor vessel is of low safety significance (ML19073A044).
Additionally, in September 2019 the NRC issued guidance for demonstrating compliance with 10 CFR 50.46(b)(5) drawing upon the WCAP-17788 methodology for evaluating the effects of in-vessel debris (ML19228A011 ).
In a December 2019 audit report (ML19217A003), the NRC requested supplemental information that was provided by FPL via letter L-2020-165 dated December 4, 2020, Supplement to Updated Final Response to NRC Generic Letter 2004-02. This supplement included no new commitments.
St. Lucie Units 1 and 2 L-2021-008 Docket Nos. 50-335 and 50-389 Attachment Annual Summary of Commitment Changes Implemented Without Prior NRC Notification for Calendar Year 2020 Source Document(s) Brief Commitment Summary Change Summary &
Bases for the Change FPL letter L-92-39 For Unit 1: With one instrument Change Summary dated February 21, bus inverter not connected to Extend AOT from 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> to 7 1992, Generic Letter its associated DC bus Follow days.
91-11 Response. Unit 2 120 VAC Inverter Power Bases for the Change AOTs (restore in 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />) The time limits for inverter restoration are similar to actual Technical Specification limits that may be extended provided risk is within the limits provided by RG-1.174 and RG-1.177. The change implements a risk-informed extension of the time limits for inverter restoration.
The requirements for Generic Letter 91-11 continue to be met as the change in commitment still imposes time limitations for an out of service safety related inverter. Surveillance requirements are not changed.
A safety evaluation within the approved commitment change checklist assessed a single instrument bus being maintained on its bypass bus with a loss of offsite power event and a worst-case additional single failure. The impact of the instrument bus to de-energizing for 10 seconds while the associated emergency diesel generator starts and loads does not impact the ability for the reactor protection system or the engineered safety features actuation system to actuate and perform their design functions.
St. Lucie Units 1 and 2 L-2021-008 Docket Nos. 50-335 and 50-389 Attachment Annual Summary of Commitment Changes Implemented Without Prior NRC Notification for Calendar Year 2020 Source Document(s) Brief Commitment Summary Change Summary &
Bases for the Change FPL letter L-2016-067 Per L-2016-067, St. Lucie Change Summary dated March 29, 2016, Nuclear Units 1 and 2 St. Lucie has not implemented the Schedule committed to meeting the automatic trip function of the Commitment Change generic schedule provided in OPCPS. St. Lucie has selected to to NCR Bulletin 2012- the current revision of the NEI use the risk-based analysis option 01 - Design Industry OPC Initiative -- to justify elimination of the Vulnerability in Revision 1, dated March 2015, automatic trip function of the Electric Power or any subsequent revisions OPCPS and rely on the alarm Systems issued by NEI. function and subsequent operator actions.
FPL letter L-2018-196 Per L-2018-196, St. Lucie dated November 12, revised the OPC Bases for the Change 2018, Revised implementation schedule per The most recent iteration of the NEI Implementation Revision 2 of NEI OPC OPC Initiative (Revision 3)
Schedule for Open Industry Initiative to extend the incorporates an option for plants to Phase Condition monitoring period before perform a risk evaluation under (OPC) implementing the automatic trip certain boundary conditions to function. support manual response to an OPC. This option provides alternatives to enabling the automatic isolation of OPC. St.
Lucie deleted the trip function of the OPCPS and now relies on the Control Room alarms and operator manual actions upon detection of an OPC.