L-2011-141, Response to NRC Request for Additional Information Regarding Extended Power Uprate License Amendment Request No. 205 and Reactor Systems Issues

From kanterella
(Redirected from L-2011-141)
Jump to navigation Jump to search

Response to NRC Request for Additional Information Regarding Extended Power Uprate License Amendment Request No. 205 and Reactor Systems Issues
ML11137A080
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 05/11/2011
From: Kiley M
Florida Power & Light Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
L-2011-141
Download: ML11137A080 (24)


Text

Florida Power & Light, 9760 S.W. 344 ST. Florida City, FL 33034 MAY 11 2011 L-2011-141 FlPL 10 CFR 50.90 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555-0001 Re: Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 Response to NRC Request for Additional Information Regarding Extended Power Uprate License Amendment Request No. 205 and Reactor Systems Issues

References:

(1) M. Kiley (FPL) to U.S. Nuclear Regulatory Commission (L-2010-113), "License Amendment Request No. 205: Extended Power Uprate (EPU)," (TAC Nos. ME4907 and ME4908), Accession No. ML103560169, October 21, 2010.

(2) Email from J. Paige (NRC) to T. Abbatiello (FPL), "Turkey Point EPU - Reactor Systems (SRXB) Request for Additional Information - Round 2", Accession No. ML111010080, April 11, 2011.

By letter L-2010-113 dated October 21, 2010 [Reference 1], Florida Power and Light Company (FPL) requested to amend Renewed Facility Operating Licenses DPR-31 and DPR-41 and revise the Turkey Point Units 3 and 4 Technical Specifications (TS). The proposed amendment will increase each unit's licensed core power level from 2300 megawatts thermal (MWt) to 2644 MWt and revise the Renewed Facility Operating Licenses and TS to support operation at this increased core thermal power level. This represents an approximate increase of 15% and is therefore considered an extended power uprate (EPU).

On March 31, 2011, a public meeting was held with the U.S. Nuclear Regulatory Commission (NRC) Project Manager (PM), applicable NRC technical reviewers, and FPL representatives to discuss proposed NRC requests for information (RAI) related to the EPU License Amendment Request (LAR). During the meeting, fourteen (14) RAI questions from the Reactor Systems Branch (SRXB) were presented. On April 11, 2011, FPL received an email from the NRC PM containing the final RAI [Reference 2]. The RAI consisted of ten (10) of the questions previously discussed in the above public meeting. The RAI questions and applicable FPL responses are documented in the Attachment to this letter.

In accordance with 10 CFR 50.91(b)(1), a copy of this letter is being forwarded to the State Designee of Florida.

This submittal does not alter the significant hazards consideration or environmental assessment previously submitted by FPL letter L-2010-113 [Reference 1].

This submittal contains no new commitments and no revisions to existing commitments.

Should you have any questions regarding this submittal, please contact Mr. Robert J. Tomonto, Licensing Manager, at (305) 246-7327.

Aoo0 ti OO (

Turkey Point Units 3 and 4 L-2011-141 Docket Nos. 50-250 and 50-251 Page 2 of 2 I declare under penalty of perjury that the foregoing is true and correct.

ExecutedonMay I( ,2011.

Very truly yours,

/'A - 16ý eýr Michael Kiley Site Vice President Turkey Point Nuclear Plant Attachment cc: USNRC Regional Administrator, Region II USNRC Project Manager, Turkey Point Nuclear Plant USNRC Resident Inspector, Turkey Point Nuclear Plant Mr. W. A. Passetti, Florida Department of Health

Turkey Point Units 3 and 4 L-2011-141 Docket Nos. 50-250 and 50-251 Attachment Page 1 of 22 Turkey Point Units 3 and 4 RESPONSE TO NRC RAI REGARDING EPU LAR NO. 205 AND SRXB REACTOR SYSTEMS ISSUES ATTACHMENT

Turkey Point Units 3 and 4 L-2011-141 Docket Nos. 50-250 and 50-251 Attachment Page 2 of 22 Response to Request for Additional Information The following information is provided by Florida Power and Light Company (FPL) in response to the U. S. Nuclear Regulatory Commission's (NRC) Request for Additional Information (RAI).

This information was requested to support License Amendment Request (LAR) 205, Extended Power Uprate (EPU), for Turkey Point Nuclear Plant (PTN) Units 3 and 4 that was submitted to the NRC by FPL via letter (L-2010-113) dated October 21, 2010 [Reference 1].

On March 31, 2011, a public meeting was held with the U.S. Nuclear Regulatory Commission (NRC) Project Manager (PM), applicable NRC technical reviewers, and FPL representatives to discuss proposed NRC requests for information (RAI) related to the EPU License Amendment Request (LAR). During the meeting, fourteen (14) RAI questions from the Reactor Systems Branch (SRXB) were presented. On April 11, 2011, FPL received an email from the NRC PM containing the final RAI with ten (10) of the questions previously discussed in the public meeting

[Reference 2]. The ten RAI questions involve specific piping design configurations, reactor fluence calculations, RCS temperature distributions and cooldown times, heat exchanger fouling factors, RHR system capability, natural circulation characteristics, and core outlet temperature monitoring. These ten RAI questions and the applicable FPL responses are documented below.

SRXB-2.1 Provide plant piping configuration drawings that include scale three dimensional (3D) drawings or isometrics with dimensional information and piping and instrumentation diagrams (P&IDs) that describe the feedwater piping associated with the CheckPlus installation. Scaled 3D drawings comparable to Figures 1 and 2 in ER-748 Revision 1 that illustrate the Alden Laboratory test configurations are preferred in place of isometrics that cover the plant piping configuration comparable to the Alden Laboratory figures but the overall response to this RAI is for configuration information that describes piping, valves, flow straighteners (if any), feedwater flow meters, and any other components from the feedwater pumps to at least 10 pipe diameters downstream of each feedwater flow meter.

The following Unit 3 and 4 P&ID and Isometric drawings are provided for the piping associated with the LEFM CheckPlus installations. These drawings are actually portions of engineering modifications which are ongoing, but reflect the expected configuration information requested. This ongoing work, in some cases, results in more than one version of the same drawing due to different modification packages affecting the same piping runs. For Unit 3, dimensions for the LEFM spool pieces do not exactly match the dimensions shown in Cameron's ER-748 Rev. 1 or Alden Laboratory Test Report No. 2009-100-C 1229, Rev. 0. The spool pieces were moved slightly downstream, but within the specified manufacturer's tolerances, due to installation interferences. For Unit 4, the installation matches the dimensions shown in Cameron's ER-752 Rev. 1 and Alden Laboratory Test Report No. 2009-101-C1229, Rev. 1. These vendor diagrams were provided in Attachment 8 of the EPU LAR No. 205 submittal package.

Unit 3: Unit 4:

P&ID 5613-M-3074 Sheets 1, 2, 3 P&ID 5614-M-3074 Sheets 1, 2, 3 Isometric 5613-P-817-S Sheets 1, 2, 3 Isometric 5614-P-770-S Sheets 1, 2, 3, 4 See attached figures for a full set of these Unit 3 and Unit 4 drawings.

Turkey Point Units 3 and 4 L-2011-141 Docket Nos. 50-250 and 50-251 Attachment Page 3 of 22 SRXB-2.2 Section 2.8.4.3 discusses reactor vessel neutron fluence calculations performed to support the pressure and temperature limits and cold over-pressure mitigation system setpoint confirmation. Describe how the fluence calculations account for uprated core operation.

In determining the projected fast neutron (E > 1.0 MeV) fluence for the reactor materials, a plant-specific calculation was performed for fuel cycles that have been completed, and fluence projections for future operation were generated based on an assumed mode of operation. Specifically, spatial power distributions and core power level for uprated core designs were used to determine the neutron exposure during future operation. The uprated core designs were based on expected fuel management strategies for the uprate (core power level, core loading, cycle length, core power distributions, loading patterns, etc.).

SRXB-2.3 Assumption 2 in Section 2.8.4.4.2.2 states that the reactor coolant system (RCS) is assumed to be at a uniform temperature during residual heat removal (RHR) system operation and that there are no "hot spots" that could cause an unexpected increase in the bulk RCS temperature. Discuss why the uniform temperature assumption was made. Justify this assumption with respect to the core, upper plenum, upper head, and the pressurizer for both RCPs running and not running. Include a discussion of the implications where RCS temperature is not uniform and equal to average RCS temperature in the hot legs. Include drain down of RCS inventory and emptying the pressurizer in this discussion.

The uniform temperature assumption identified in Licensing Report (LR) Section 2.8.4.4.2.2 is used for the RCS cooldown analyses. The cooldown analyses performed confirm the performance of the RHR system in cooling the plant for various plant shutdown evolutions under EPU conditions. The RCS is modeled as a lumped heat source with a conservative, single-valued heat capacity. This analytical approach has been used and refined over many years and the code results are consistent with actual plant cooldown performance from many reactor-years of PWR plant operation. The consistency of the analyses to actual plant performance has confirmed that individual heat loads associated with specific RCS components (e.g., core, upper plenum, upper head, or pressurizer) do not need to be differentiated in the cooldown model. The lumped RCS heat capacity provides an appropriate representation of the RCS latent heat load on the RHR system during cooldown. Thus, uniform temperature distribution in the RCS is assumed.

The cooldown analysis is intended to accurately characterize the cooldown capabilities of the plant under EPU conditions. It is not intended to address the discrete temperature profiles of the RCS components and piping during RHR system operation. Although the actual fluid temperatures vary throughout the RCS, forced circulation via a Reactor Coolant Pump (RCP) provides for adequate mixing and acts to reduce temperature differentials across the system.

The continued operation of a Reactor Coolant Pump (RCP) during the early stages of the RHR cooldown process improves effective mixing of the reactor coolant and thermal homogeneity within the primary system. With one RCP in operation, one RCS volume is recirculated in less than one minute. Since a typical cooldown rate

Turkey Point Units 3 and 4 L-2011-141 Docket Nos. 50-250 and 50-251 Attachment Page 4 of 22 is approximately 1 0F/minute, a single RCP running assures a relatively constant RCS temperature throughout the system, including the upper plenum, and upper head regions. PTN's procedures require one RCP to remain running down to 180'F to provide added assurance of uniformity of RCS temperature. For cooldown scenarios in which the RCPs are not available (such as Loss of Offsite Power), the operation of the RHR pumps provides for mixing capability. The RHR cooldown analysis commences in Mode 3 (350'F) when the RHR system is aligned to the RCS and continues to Mode 5 (200'F) or Mode 6 (140'F), depending on the case being analyzed.

In these cooldown scenarios, pressurizer level is procedurally maintained and the pressurizer is not drained. This is conservative since it maximizes the water mass and, therefore, the RCS heat capacity. The cooldown analyses also model core decay heat and an appropriate value of RCP heat input, consistent with the RCP normal operating procedures during plant cooldown, in which the last operating RCP is secured below 180'F.

SRXB-2.4 Section 2.8.4.4.2.3 identifies a higher heat load that often extends cooldown time, yet, in the case of normal cooldown, time is 28 hours3.240741e-4 days <br />0.00778 hours <br />4.62963e-5 weeks <br />1.0654e-5 months <br /> versus the lower heat load cooldown time of 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />. Explain since the expectation is that an increased heat generation rate would result in a longer cooldown time. The potential concern is that the analysis methodology used for normal cooldown may be applicable to other conditions and an understanding is necessary to assess predicted plant behavior for other conditions.

LR Section 2.8.4.4 states that, in addition to the increased initial core power level, the updated analysis for the EPU also includes other system and component design input changes, all of which affect the cooldown results. These additional changes include seasonally adjusted best-estimate values of the maximum Intake Cooling Water (ICW) system supply temperature and auxiliary plant heat loads that more accurately reflect the actual operation of the plant. The analysis assumes that the maximum ICW temperature (which occurs in the summer) does not occur concurrently with the maximum auxiliary heat load (which is from the spent fuel pool). Note that PTN refueling outages normally occur in the spring or fall. See Table 1 below. The previous cooldown analysis did not consider these refinements in the analysis inputs. Hence, despite the increased core decay heat rate, these additional changes in the cooldown analysis input parameters for the EPU resulted in a net reduction in the reported cooldown time for the worst case normal two-train plant cooldown (EPU Case A in Table 1) when compared to the results of comparable case in previous analysis.

Turkey Point Units 3 and 4 L-2011-141 Docket Nos. 50-250 and 50-251 Attachment Page 5 of 22 TABLE 1 Turkey Point EPU RAI SRXB-2.4 Normal Two-Train Plant Cooldown**

Reactor Power Rating Current Extended Power Uprate Cooldown Analysis Power 2644 MWt Input Parameters and Results 2346 MWt Case A Case B Maximum ICW Temp. ('F) 95 92 97 Auxiliary Heat Load 26.0 26.85 21.87 (MBtu/hr)

RHR Cut-in Time (Hrs. after 7.5 7.5 7.0 Shutdown)

Time to Cooldown to 200'F 30.0 28.2 26.8 (Hrs. after Shutdown)

    • 2 RHR pumps, 2 RHR HXs, 2 CCW pumps, 3 CCW HXs, 2 ICW pumps, & 1 RCP Under the most restrictive operating parameters and in the unlikely scenario that a plant cooldown is initiated with less than all of the cooling equipment available, RCS cooldown would continue to be possible, albeit at a much slower rate. The potential for cooldown times in excess of 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> under certain conditions is currently being evaluated under the Turkey Point corrective action program. This performance is consistent with the current licensing basis of the plant.

SRXB-2.5 Sections 2.8.4.4.2.3 and 2.8.4.4.2.5 state that there are no safety-related design criteria for normal plant cooldown times and, therefore, the calculated cooldown times are acceptable. Yet Section 2.8.4.4.2.5 also states a Technical Specification (TS) time limit for achieving cold shutdown of 6 + 30

= 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> after reactor shutdown and states that the 28 hours3.240741e-4 days <br />0.00778 hours <br />4.62963e-5 weeks <br />1.0654e-5 months <br /> applies.

Explain the rationale for concluding that calculated cooldown times are acceptable since there are stated to be no safety-related design criteria in contrast to using these results for meeting TS and other cooldown criteria.

The current licensing basis for Chapter 14 events for Turkey Point defines safe shutdown as hot standby. Thus, cooldown to cold shutdown is not addressed for these events. Cold shutdown is addressed for Appendix R. Accordingly, various cooldown scenarios were addressed in the EPU LAR, two of which are considered quality-related analyses consistent with FPL Quality Assurance Topical Report (QATR) requirements: normal plant TS cooldown to cold shutdown within 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> and an Appendix R cooldown to cold shutdown within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />.

The Appendix R cooldown is discussed in LR Section 2.5.1.4, Fire Protection. As stated in LR Section 2.5.1.4, the cooldown analysis performed for the Appendix R cooldown demonstrates that cooldown to cold shutdown would be accomplished within 63.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br />, meeting the 72 hour8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> acceptance criteria. The normal plant TS cooldown, as indicated in FPL responses to SRXB-2.3 and 2.4, assumes availability of two trains, i.e., the normal two-train plant cooldown presented in Table 1 above.

Turkey Point Units 3 and 4 L-2011-141 Docket Nos. 50-250 and 50-251 Attachment Page 6 of 22 The designs of the CCW and RHR systems in the Turkey Point plant contain redundant pumps and heat exchangers arranged in parallel cooling trains for system reliability and maintainability. Under the most restrictive operating parameters and in the unlikely scenario that a plant cooldown is initiated with less than all of the cooling equipment available, RCS cooldown would continue to be possible, albeit at a much slower rate. The potential for cooldown times in excess of 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> under certain conditions is currently being evaluated under the Turkey Point corrective action program. This performance is consistent with the current licensing basis of the plant.

SRXB-2.6 There appears to be no information that addresses the effect of the EPU on heat exchanger fouling factors. Address the behavior of heat exchanger fouling factors due to the higher heat load, longer cooldown times, and greater differential temperatures.

Heat exchanger fouling factors typically are a function of water chemistry and cleanliness, which will not change due to the EPU conditions. The fouling factors are not affected by heat load, cooldown times, or differential temperatures, based on the following considerations. The analysis assumes that during normal plant cooldown using the RHR System, the flow rate of reactor coolant through the RHR heat exchanger is throttled as needed to meet two operating limitations: (a) a maximum RCS cooldown rate of 50'F per hour, and (b) a maximum CCW supply temperature of 125'F. This throttling of the RHR flow rate typically is required early in the cooldown transient when favorable heat exchanger conditions exist (i.e., high heat exchanger AT). These same limitations were considered in the previous cooldown analysis for the current power rating of the Turkey Point plant.

As a result of the similar throttling of the RHR flow rate that is assumed to occur early in the cooldown transient for both the current and uprated power ratings, the maximum heat loads and differential temperatures for the RHR and CCW heat exchangers are unaffected by the power uprate and there is no effect on heat exchanger fouling factors.

LR Section 2.8.4.4 states that the CCW and RHR heat exchanger heat transfer rates (U and UA values) assume fouling factors that are consistent with the maintenance program for these heat exchangers. These maintenance programs contain surveillance and cleaning procedures that ensure the continued design basis heat transfer performance for these heat exchangers. In addition, PTN Technical Specification Action 4.7.2 requires that it be verified at least once every 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> that two CCW heat exchangers and one CCW pump can remove design basis heat loads. Hence, due to the rigorous heat exchanger maintenance program in effect at PTN, the marginally longer plant cooldown times associated with the EPU conditions are not expected to have a significant effect on the heat exchanger fouling factors.

SRXB-2.7 The end of Section 2.8.4.4.2.3 states "The EPU has no effect on the ability of the RHR system to remove residual heat at reduced reactor coolant system inventory, and therefore the PTN (Turkey Point Nuclear Power Plant) will continue to meet the current licensing basis requirements with respect to NRC Generic Letter 88-17." Justify this conclusion in light of the increased

Turkey Point Units 3 and 4 L-2011-141 Docket Nos. 50-250 and 50-251 Attachment Page 7 of 22 decay heat generation rate that must be removed after shutdown. Include the effect on temperature, RHR flow rate including any limitations on flow rate as a function of RCS water level, and potential hot leg vortexing in your justification.

The core decay heat level associated with the EPU conditions will initially be greater due to the higher core power. The early stages of plant cooldown using the RHR system will be performed with the normal RCS water inventory (i.e.,

main coolant loops filled). However, within a period of less than two days, when the RCS water level could be reduced for plant inspection and maintenance, the decay heat generation rate will be less than one percent of the full power heat load and, therefore, not significantly different than that associated with the current licensed power level of the Turkey Point plant at two days after shutdown. Thus, the RHR flow rate required to remove decay heat at that time will also not differ significantly and will remain within current PTN procedure and Technical Specification limits.

GL 88-17 required utilities operating PWRs to implement improved analyses, procedures and equipment designs that are intended to avoid perturbations on the RCS and supporting systems while in a reduced inventory situation. PTN responded to GL 88-17 with programmatic features that ensure that the RCS will be maintained in a stable and controlled condition during reduced inventory operation. Specifically regarding reduced inventory operation, the design flow rate and operating temperature of the RHR system that will exist during plant cooldown and the level of coolant that is maintained in the main RCS loop piping during reduced inventory conditions in response to GL 88-17 are unchanged under EPU conditions. Other system parameters that are relevant to vortex formation in the RHR suction line (i.e., pipe diameter, water level and fluid flow rate and velocity) also are unchanged as a result of the EPU.

There has been no change to the licensing basis of the plant for reduced inventory operation as a result of the EPU. PTN Technical Specification 3/4.9.8.2 remains applicable to refueling operations with low water level under EPU conditions.

Therefore, it has been concluded that the EPU has no effect on the ability of the RHR system to remove residual heat at reduced reactor coolant system inventory, and PTN will continue to meet the current licensing basis requirements with respect to NRC Generic Letter 88-17.

SRXB-2.8 Section 2.8.7.2 states that a minimum subcooling margin of 50'F is maintained during natural circulation cooldown until RCS temperature is below 350'F. What temperature sensors are used to determine RCS temperature and where are they located within the RCS? If hot leg temperatures are used, address the distribution of temperature that is expected in the hot legs. What is used to determine maximum upper head temperature during natural circulation cooldown? Compare the upper head temperatures predicted to exist during natural circulation cooldown for the existing power level and the proposed power level. Include saturation temperature at the uppermost upper head elevation in the comparison.

Turkey Point Units 3 and 4 L-2011-141 Docket Nos. 50-250 and 50-251 Attachment Page 8 of 22 As directed by Turkey Point's Emergency Operations Procedures (EOPs),

subcooled margin during a natural circulation cooldown is monitored using the Core Exit Thermocouples (CETs). The CETs are terminated in the upper support column where they provide the most direct indication of upper head fluid temperature.

For purposes of a natural circulation cooldown the primary concern with respect to upper head temperature is to ensure voiding does not occur in the upper head region due to temperature differences that could potentially develop if the upper head is cooled at a significantly slower rate than the RCS. After the St. Lucie cooldown event that resulted in the formation of a steam bubble in the upper head region and in support of responses to NRC Generic Letter (GL) 81-21, the Westinghouse Owners Group (WOG) performed analyses of the natural circulation cooldown capability for Westinghouse 2, 3, and 4 loop plants to prevent void formation in the upper head. The results of these analyses classified plants into two categories with cooldown rate limits to prevent head voiding based on classification type. These cooldown rates were incorporated into the WOG Emergency Response Guidelines (ERGs) which provides the guidance for creating plant specific EOPs.

To ensure the temperature of the upper head does not significantly deviate from the RCS, the RCS cooldown rate is limited to 25°F/hr by the EOPs for natural circulation cooldown. This 25°F/hr cooldown rate is the rate recommended for a Thot plant as classified by the ERGs to prevent head voiding caused by significant deviations between the cooldown rates of the upper head and RCS. For both the current power and proposed power levels, the RCS cooldown rate remains limited to 25°F/hr.

Additionally, during a natural circulation cooldown one of the primary means of heat removal from the upper head and associated fluid is through the use of Control Rod Drive Mechanism (CRDM) cooling fans. For the proposed increased power level, the heat removal ability of the CRDM fans is unaffected and can adequately cool the upper head as shown in LR Section 2.8.4.1.2. Therefore, the upper head cooldown rate at the current power level and the proposed power level is the same. Therefore, both head cooldown rate and RCS cooldown rate remains unchanged due to the proposed increase in power.

SRXB-2.9 Provide representative RCS natural circulation temperatures that have been observed during operation of the Turkey Point plant and compare these to selected natural circulation temperatures provided in Section 2.8.7.2.2.3.

Since the PTN stretch power uprate in 1996, there have been multiple unit trips including a dual unit trip on 2/26/2008 but no cases of a natural recirculation cool down from full power to RHR system entry conditions (350TF). There was only one case of a partial natural circulation cooldown which occurred on 10/31/2005 while Unit 4 was in Mode 3 at 400TF to the RHR system entry conditions. This cooldown event took place over six hours or more and was punctuated by a variable cooldown rates such that actual plant performance data is would not be representative of data provided in LR Section 2.8.7.2.2.3.

Turkey Point Units 3 and 4 L-2011-141 Docket Nos. 50-250 and 50-251 Attachment Page 9 of 22 SRXB-2.10 Is the Table 2.8.7.2-1 620.8°F core outlet temperature an average value or the peak value located immediately above the hottest region of the core?

The core outlet temperature of 620.8°F is the average temperature of the water directly exiting the core. After this water gets mixed with the flow which bypasses the core, the temperature of the water which enters the hot leg is reduced. The maximum average hot leg temperature established for EPU conditions is 616.8°F. This is provided in LR Table 1.1-2.

References

1. M. Kiley (FPL) to U.S. Nuclear Regulatory Commission (L-2010-113), "License Amendment Request No. 205: Extended Power Uprate (EPU)," (TAC Nos. ME4907 and ME4908), Accession No. ML103560169, October 21, 2010.
2. Email from J. Paige (NRC) to T. Abbatiello (FPL), "Turkey Point EPU - Reactor Systems (SRXB) Request for Additional Information - Round 2," Accession No. ML111010080, April 11, 2011.

Drawings Unit 3 P&IDs (PC/M #s) 5613-M-3074 SH 1 5613-M-3074 SH 2 (PC/M 09-015) 5613-M-3074 SH 3 Unit 3 Isometrics (PC/M #s) 5613-P-817-S SH 1 (PC/M 09-015) 5613-P-817-S SH 2 (PC/M 09-015) 5613-P-817-S SH 3 (PC/M 08-078)

Unit 4 P&IDs (PC/M #s) 5614-M-3074 SH 1 5614-M-3074 SH 2 (PC/M 09-019) 5614-M-3074 SH 3 (PC/M 08-093)

Unit 4 Isometrics (PC/M #s) 5614-P-770-S SH 1 (PC/M 08-093) 5614-P-770-S SH 2 (PC/M 08-093) 5614-P-770-S SH 3 (PC/M 08-093) 5614-P-770-S SH 4 (PC/M 09-019)

...... S ---------- ---T -------------a -------------T -------------7 -------------T------ ------- -- -----------

11 vl.or-m-s 1gs -------- tam


----------- -------------- 14.

AID


------------ A


------------------------------------------------- -------- AID A

it A ALI I do A A .4 Ile W j - - - - - - 5L I-A 132 1

__R AA_/3 r Al All 7----

T_

yo m - .

-774 - -1 1 Al 711 lif-A R

A A A 31C A 3e IA.

it4 56A.- 1. 3 A.

iwAA.

14 F POD

.1 Ln__ -1 iXkEkR -T 3 AFONE &WEBSTEENGWEERING COR X., Via MA 3 WI-) SHM Fr. LAUDERD 4 r2 9 7r' (IARW 2 At L. 117ý SYSTEM H PPL FEEDWATER TAI.-A) ALE,FLORý1'4 1 2 A

L--------------1------------- I -------------Z__ ------------I ------- All 4 T------------- 1 ------------- i ------------- 1 ---------- I ----------- I - - 1


- - I - - - - - - - - - -

'I7 7-677776666666666666666p 333-3--

3-12 urT--3 7 7 43 .....

- 11761D 73.3333-333 -

3

' -33333 ~ 3-3/1'-3-DI

.. -- . 76 T

-223 -

3 - 3 37~~~3 k 33 S3H 133 I7-/37E

.' 333 36 C3 7 -3 L~~ 3/' 3-23 3 /3 (7 7i

-3 233 I II 33T 33737 33337633-3 ~ 2-333 Q3'-333

[~4 33 11..31 I. L. F _ 33.33 211-63 3 p.,3333- 337333373333 73-'773/333 6 D 3 337-33333736 333373

'- E-t- 33333333 3-333 3 ID~'

37333 1-122 333~~~1 373 7. /3 _ __ _ _ __ _ - f. . Ell-__

C~~

-3 ~ .13332 33333-33~2 33333 33 I I 73E 33333733333332373 W3333'."33 7-733333337 SAETY336-36 REATD 3633 3666666636~66 ~ 37 B]DETI/L2(NOTE 7) M LII 7733.66 33333767772~7366 33773.6(F-5)3 66636663636D 6666 3.736 33633--373 77 3 2 3 26663'66676 7633 POD63736 T.Ill7763773666 1_1_ _ _ __II ULERUIT3BEHE R' 27 09-0157333~~3 03337 3

2~~ý 142-¶2t3 2---13--

k- -t-~}tni 5- 3 3 A - ------- ~

  • ~ AI IfIN

- 4 221 3

m /--- e A51--33 tI73334034ia f--

vii It - 7:} -- F3--------2 3333---I

  • ~~ ~~ F-Lj~i~¶

~ ~ ~

m3 3

~

w a Il

~~ " 3 70/i K

I I IW 31333*

3-C--A 033 1 .2 1.,3 I

-235 IT - 11 -C- - ---------

SLIG-d'-CIRS EU RESTRAINTS y SINGEACTINGN cis YDIRECTION OF STEM A CONITFTNUEDONG" STBE ACTING ANGER M"

Co SHELT2 r.. GOUED ' ELDED

'N~~'#Wol. NAHT 1"'ýABSTANCHIR CO[ORDINATE SYSTEM SAR1GN. NODE ND.

COCNTINUEDON GLOBAL SU-OR ANALYEET Z

REFERENCEP&I0 NO.513--M'-3DT

'J5 RErERENCE OPERATING DIAGRAMNO.5613-N-3074 Sl IL SH 1, 2 L 3 23PIPING FROMFEED'ATER PUMPS 3PIA AND 3PIB TO HIGH SA POINT HEATERS 3E6A AND 3E6B AND FROMABOVE HEATERS A1 ." TO CONTAINMENT PENETRATIONSP-27A, P-27B, AND P-27C

'Cl-* AND TO STRESS PROBLEMS AFW-DO3, F.R-2, C-2 AND DCI I+( #*I THIS DRAWINGMADEFROM 79-14 WALKDOWNINDEX*

09 * (* FOR STRESS PROBLEM FW-21 REV.

C~' -REFERENCE B"*561P314RV DGCUMENTS, I T5177-DO9-P-TOO 517S--

7-8-P- 320REV IRV D ý 7 5610-P-182 REV. I

<6.

' 56 i0-P-222 REV. 12 X=C

-008-SISIALYANLZEBIPN 11U coAXDR -- OPERATING SOS E AND PRESSURE P

" 1 3"- - ID PIPE LINE LINE5 NS3LATION

" 4, F.R SUPPARMATERIAL NSPEC SIZE __A ___

." 51 ~ 9T SE NRC 51A- -RICS

-IA-I-NS I A SRE 6R S pH AIDS6 SE A RIDSULPO AA _-

GENERAL NOTES

  • ' AIHE RS AN lA',IG S6'd-p-U NIA CRET NB UNDR'

.I-, ,~~~~AH "A-, P IBIN *H#C E O TH S -IS-I-NEII Im SE A RB -L I5s-0-6-FVO01 3'*

'- N ALL ELRBOA ANSUMED 1ED HBBOR IN UN.ESS OTHERWISO SPECIFIED Q41) A 2. PAR A. rA'SPIPE SUPPORT DETAILS SEEDRAWING SERIES 5613'HN9T 3- NOESICS N.ES E. I-O5

  • OCM TCAIED O2 AREAlAYTICALANCORSA

-~

N 1

RE LI'5.

H (*) ~~ ~ ~ ~SERIE S SN VR DRAWING THIN ~

-T-P NTIpC0-05SALB SUPERS 4:

EIS 5613-P-3114RE DRNTED 14 SC TEI.

ViH {)

6. SECCALCULATION *ToR-102-RNI FOTEQUIPMENT ROTIOST.

N v", QLE PH 5

S A TTHIN OF N

? A N3 N 5 N *1 PHAH A- " .

S.

~~~~~~A-SHEET

- HEAIDSN THG STALL NHI-IU p) BE8I6 ISUAD 0-1 INSHL SHEETSNTPAA HL COORDINRATIO EC)RIT)UNA AND 14)

WORKED TCS13. ED H ITS ATIH ALLPCSOTHEC

r17 N.

ASH "L" IO E KS C Ep,~

I ~

Ali*2 .' ASTRESS 3 ". "+A B.PIPING SHOWN ADSU IHLMCN ONTHININOMETRIC RCALCULNTIANDN TANACEEN IA RS-AUAPNO-CA-BSBBI0.

-IN-I-N9-EVALUATED NCNIHOMA TIT UNDER 3H r-i-,~

I.FO 'T" T

  • DB. R AAl~l M ANDINSS-IA DRI B SPRCCHICUVI5NN I] fTRq RAEEECC S&LHLJ40 HL SPEC

-EAX, A loe IARAD7L

~,AAU~

MA. P T

  • ~ I'

-I ALLNPIPEIS IRSULNICA RACTABNS 1IAPM. SPEC M-B.

.. ................ 0901 PH S 0S-DI / CONSTRUCTION.N.T.S

'AtJ A' L HORSONHIN ET B-BI SHALLIDC COORDINATED WITH PER FLAS Pz.E FORNED-6

  • BCF'O SO T AgK- S WANUAL SEC.{RAFVL I ELNG T.'D

'T5x H PER DR-106 / CONSTRUCTION NOTES

'A1.P-S.T'EIPERAN-DIN. /* - AEIRCa THIBPCER-IBSI SHALL REECORDINATED WITA PE-S

.I O '~ .. I . ORPHASE 7 ATRH 0T-B I.5 AT RIGH '2' . TAEPIPINGINSULATION SHALL REREMOVED ANDRESTOBED NSPER THIN l 3' 3. TAISSUPPORT IS TOBCINNTALLED DRIBBNG IMPLEMENTATION OHPET D'NG C. a PERIS-IDA BIT SB HOT O CONSTRACTARILITH PUTPOSES IT TNTREINSTALLED S4 pR*

' ~' 55 N

>RRING

'Tpj'PIP W.~a IMPLEMENTATIONJ MDNYSTEM CR STRESS RHPCTBN-DIN CALULCALRION WUITROUT IMPACB TOBRE A

CASPP- LASPP, aCONTINUED PR6. SEEDECHTEE SPECARS PT NROC RES IN-R BSAM PERU` PIPESCUD NINCD MAE TIRIF DES TEMPR 45B RCIRB DEIG TEM CEF ARI STE-wOB 0A PIPIN mU F.DNOTETRICINS E NSAUýXM OO DESGN 6DOPSI RES- DSIG PFESý 51] S A A 56LU-M-TI SH I 05-015DWG

ARIN. IN S-LIB-d-c I OF STEM

  • -W~m'--.-.'.--'.*IREETI~W p

ANCHOR $TAN. O

~ o~~GROUTEB ANHO f~o~ ýS WELCDEJDN Z=-ON "*T*OE0OS ' p * '*kHOL GLOBAL COORDINATE SYSTEM1 MARK N NO NO.

~GGSSPESSURE EINTEPR IGON PSIG Et., PROS 0 CIS TYP.2ILCE . PIPING SHOWR ISOMETRICHASON THIS BEEN 5H PA 11 1Z=-0.0780' STENOS UT-EOAL-ATBO STOES UNDER CALCULATION ONIE SIR

'9 CNTINUED OH3 RIa 003 0 ONJ CONTINUED 5.~-

R-*C AL A5IFM*N,

  • RRO p. 11mF 54/O 10 SHC all-PHI-SPCUO-IC4GII

~~ ~~ ~ ~ ~ ~ ~ ~ ~ ~~~~~~~~C i~ +s+ ... ... 09....

-0....15 FZVTRSSTM51--17S0-1 EDNNU iOlN: l; HE7LOTID ONANH NOTE--S IC -_$20905.

0901 /

COSRUTO OPROVEI 35 AC S TEUNDO7RTUTSIE CN/AIME, PIIN SO ET BRACING_______Ch CrDSPRING RE

__N_, ___N_, __DMO

__R _I ___

I , ,

SINGLE ACTING IN yRESTRAINTS DIREcrIOR OFSTEM To TRANSMITTER O-ATER) SA TOUSL e SPRING sE PEROll CORSI.

NOTETo ANIT GR-'FDWEA _;WELDED CRN0518 GLEMAL COORDINATE SYSTEMT I POT WPALTSIG SI'WELDHNBER WHIPRESTRAINT rWELD SYNHAL E 24e434 r. - ELI..LET UUE/..,

ATIC V ."E VALVE S

c A cR. OV5 D.G I E-.1-.C 1ý1

'VP. ZIUT SEET SH 4 ECR242434 z w, I ' E1LIAOO IIIA, cRN oss PER OR. 5185 Nn v,

3,ý ETAIL A C TINUE. CI AE Y11. 0 PIACLS SHEET4 PER TINUEDON C. Oslo ON CONTINUED GENERAL NOTES

,cs.XT 2

1. ALL ISI INFORPATIO, WELDNUHJERS T LEC"TIGN$,

ZONES.LINENHONERS & P11PRESTRAINT LOCATIONS AREF*I SI REFrERENCE ONLY.

ZONENBPER. LIRE R,*EN.R 3-10 14'-FWA-2302 ADV, S-IllO 1R-TVE,-S04

  • -lll 14 -FC-2 306 zC-TT..C. ON SHEET5 a THISSHEET SHALLRECODRIDI NTE1O ANDWORKED WITH ALLOTTER GREETS IN DRAWING 9613-P-8I7-S.

Pcm 00-078 / CONSTRUCTION NOTES PER A

WR ON THIG PTMPP-OTB SNALLBE COE]ORNATED WISHPEN a BEEFp&LHIPE WELDSTANDARD O 7 IDR WELDINGA SDV-0W ENE PREPARATIO ]S ANDINSTALLATIION INSTRUCTIONS.

Ec 242434 CONTINUE.

ON CRHOD5 IL INSTALL SEWFE-S-49SAFE-3S4-IRANDFE-3-478 ULTRASONIC FLOW SHEET1i H'IJElRSAT LI]CALIONtS SREW',N.

4. TPSTHLL NTWCENTRAL TUWING, SWAGELDK VALVESANDFITTINGS AT EACINEVLEFMULTRASONIC FLOWMETER, SEE DETAIL N
5. VERIFYVALVEANDEOUIPMENT TAGS/NAPTPLAPHS FOR VALVESAND PE.R FLOVPETERS LISTEDAIOVEAREPRESENTANDINFORMATION D5165 .1A.

"azý COPTAINED WITHINIL UP TODATE.

6 AFTERCOMPLETION OFALL LErH METERS, REMOVE TEMPORARY PIPING SUPPIOTS. I PLACES' CRNGSLBS FARREMOVAL TO OF PIPING FOR THEINSTALLATION OF THELEFMSEE DECHTEL )EPREITIDN DVG.PTN-DB-078-L- L SHEET A THEPIPINGINSULATIDN SRALLBE REI'OVEDANDRESTORED AS PER

'A INHULATION SPECN-P68.

9. TUHING SNALL BE SUPPORTED AS PER SPECC-R1V.

I1. FIELDTOLEAVECAPIN PLACEUNTILTHEIPPLNEAIArI IF THE TRAsMITrERINSOALLATIAN TN A LATER REVIGIIMI.

"U11-1 PCM 08-078 / CONSTRUCTION NOTES <CONT'D) 1I. INSTALLATION WILL BE PERFOARNEP IN ACCORDANCE VITHVENDOR CLASS PE, A 11, INSTALLATION OF PIECES 1111- BE 11 FOLLOW& DOCTUPET V0009A4"CAMERON FLOWMEASUREMENT OVSTEK" DESIGNPIE T HP. Aso FE 47 (S/N 29019)

,,:3:4.8 SIR -- CPMR.I . PCM 08-078 / BILL OF MATERIALS TLEFT)

PER o5loS cRN DESIGN NAX. UP.TENP, 16DD PRESS, 411 PSIG

.% EA PRESS, 1600PSIG 13,ED IONITTSPOUL PIECESIN PIPINGWE SHOWN r-1 RI)-T-1 `7.IA* AE WPALLANP I OC-

- PER Ec a.z- PCM 08-076 BILL 13F MATERIALS (CONT'll) (LEF-CRNC05 --- sP iA-iWi-Ž~s T,7.

PER if, Dslos-

-77 TU KEY POINI NUCLEAR POWER PLANT I EBECHTEL POWER CORPIRATION UNIT G3AETS OF & REV FEEDWAT ER SYTTEM 5613-P-E17-S/08-078 I GUTSIDE CONTAINMENT SYSTEM NEI.74 I APPR-ED rAvs- SIRrSS PRSBLENM FAW-2 S-SH3-OB-078,d.g

-T - - - -- - - - - -- - - - - - - - - - -- - -T -T-------------7------------- I----- -T - - - - -- - - - - - - -i - - - - - - - - - - - - -T " --- T ------------- a-4- 4141 AV44344 443134(1043343477


--------- ---- --- 3-------

4/7441434344r

-- - - - - - - --- --- -347 4-

-- 4--- - j-- -------

3,4-4-4/7 I ~ ~ ~ '1 447443 24 74 31Re" 434 77 7 - ~4-2-7 -4 1/2- 4--1.

3- = . I D 4-144174 4-0s I----------

-412T4/I 2,1,

)  ;;4 4-3433-4/4 I 2-3"/ 4-34-144 4 - 4

-4 7 I IA

  • ~ ~~~~~ 4-4--

.4 .¶7 1 7 4 4

~ 3/ a'/ .4413442443433344

(

-4 L4}44 41-4347 1.4 ~ 7E 3U .457-444 71--41.44143-.4117434

&14-4

>4 7l~ 314743/43 34314444324 4343-4474.44143 I/43 I/Ot 44 1/4' S 4 r 44~

4C

~ ~ ~ 4RN 1 -TE NE4 NRTA.3474144414 ME1434 43 3- 1444314 17544-354 4~~~~~5 444473  %.7437-E7437-4-341443 6 Z1 34 1/4 3144 4-23-747 44-3-4/4I FPOD 14 l 4-M-4 14 41-3 iA744-44144PER14/34N-6343344344P.3M-1-444.

1741-3 44-43144434-3.4.

437431443473(434 44 3

4 3 4 1

34 43 3

4 3

4 11/47 41I 4 1/43 4.4 44V47

.444-Sl 3344-33444ŽAL'.

~ 1143354443 4 7 I

L T .

3 3 ý-4 3

~IN./ .V )I-4'~

4 E

4 4IDn f FFT.

44 uCt R U341734 4 43WEBSTER

ýSTTIE LAUDERDALE, CORP ENGIN3EERING FLORIDA 4 - -343ES4444434434 15 02 - Ill 11-IMI IPI/I AS-EXILT

  • KV Ab* *IL 19q*-$-*

- TE R1. - - -S 1i1 I............. i 4 I -- - - - - - - I - - 5 I- I--

o r 1 - ------------- ------------- - - ------------- -

t


T--- ------------T T T 46*_

6, *s TO6 5 0616616-5 0q 0 Actt 0

TO6-

-~~4 I16 o 7 H/A 14-"/'N IN 60-6-661 66~~ ..

14ý 4766 6706/6 66-06061-6-7 7-20-206645

.- 6-227 077-11 2310-1 7-00 7/.-N73 0473 0~O7 Jog~ J~f 66-7 7 0 7 A..-

O ETAI IOT

-6 76 , 0106*76 ~

0260 ~ 606--200770 ETA 715 To 66Po 7/6/6 <6/

65IOl 0/6 In o -

IF-56 657

-PO- -6 107 6 04647606FI 0'.- - p66 027076606T - .... /440076 7 007000~1 0-0-06 07+ T6O-006 46 . \405*~jJ-f 06 650-0 I/C 064-06 0 OI6-6-60 760670147.366-

.64o T64 66666A02 l7/6lI/6. 60060 66 IA.6 6-W-0 I ID -7002

-6651 S76666

~

l 6-TOP4 06676266672607 671 7102600

.'Ei.

026-5-76040602~~~514ý

~~ 7 6 j '~~~

- /6--

0T2O"600166 0

0 2075666 6 76 6 67 0 6660000 ON7 06T 7 5-AN6 20 6 7 67611/ 76. Q 606 &F6 00667P6176776026612 I,-11

1. TETAIL 2 (NATEA)W 666 7601 R 170767667727.70006007676

. P.- 61-07 0-1 ) -J0O.5626

01. 0 P- p-, 67565760 1677616 02766 067 077 5 6 0664 5704 F0 Donf

. z'- =

I0560205.5565665I.,=- 0 Iý 1- 1'.- 1 o 10, 1 1-1. . . ILI, WA 1 6/66/67-T 1*1,*50711764640.

1- -- C. 5160~2-PýM6 00

'p,,/. 0710) 6

-,PCHI P, IURKEY POINTNUCLEARUNI4 BECHTEL 67 17-07-66 0516(60/060--j 66 77-60-0676026-070N AT 1-u-9755 20 0 76 - 7606 0 0P7 ý I, R66 0 Iý.-- 7076--T g54t *lO lip 0- *J,16-660577-0 -76 7 76 760 561F4-0-30S4 074 677120 66 0*

  • ~-*6~6 j-.4 ......

I11 AI-ILTt ON -

~

27 0 36 *0

~

14-761666 670057776600 70670P0-60 IN D- 0057-756-6

-60 17

'p I622 PL FEET/0ATERSYSTEM

-7 / 069-0679 67 06 1ý 1 -1 - 60~~~~~ 66 66 66 6506766


- - - I . . ..

NESRSI RETRAINTSo V, 9ACUCCN INCIN DIRECTDN OFSTN, 44 S.UCCEl. D...DLE S""CA

-. UCIDA HANCEA C .AROUTEO S WELDED s UN " CRT *LY IDA AN TE , IARK NO.I NDE NO, REFERENCE P&IDNO.5614-1M-3074 SHEETS 1. 2 & 3 REFERENCE OPERATING DIAGRAM NO. 5614--M-3074 SH 1. 2 &L PIPINGFROM FEEDWATER PUMPS4CPA AND 4P1 THROUGI0IH HTP. HEATERS4E6A AND 4EGB TO CONTAINMENT PENETRATIONS P-27A. P-27B. AND P-27C THIS DRAWING MADEFROM 7D-1 UALKDOWN INDEX FOR STRESS PROBLEM FW-1 REFERENCEDOCUMENTS: 56G0-P-217 REV. 0 5610-P-21T REV. I SEISMICALLY ANALYZED PIPING HYDRO DESIGN I O OPERATING

\CNTNUE N~IS REGIONDRESS PS *FPESS. POSOTEMMPA F -TEMP PE`SS. P5IG ISIDELD NUMBTER 110ASUT WELD SYIDDOL 564- 7890S PIPE LINE LINE INSULATION MATERIAL SPEC SIZE

  • 4CT~~CRGD NR-04 PNTATIONF CI.27CD N A0- CRC 4- 1- IN NANND I GEIIERAL NO "OS A. NACEEr4=. PIZ7.CZ` . CI
11. IAC i NI NCTDI DUD ASO CIN?ŽAE ON .4 N3. 'CCC, CUITUCSNE- INC-IAA CPDA

- -11 UDND4CE IN M N .19CONTIUEDOA I SAC 00414 .0 Al NINN =.14.D00 IS.

A ,5 SPl- T 08.09 BILOFMTEIL PIPE.

SSSIDECL C CC A PCM 08-093 / CONSTRUCTION NOTES DEIC TECT AAs\

DsCN IRIh DEC PES:18 SG .S .

E.

- N

--- -- -- N- NE.

IL .- 1. 1-

-C

1. IN

-I E-1 UU.

11MW I-E S- ISOPýTSQ/

'_fti_ Gýýj R Na. -1 IT.- IAIS I-,-

.1 SSSI444~CC040SCA01450CA50ISNCISID IT

'./R -NUC.0NIT.440C4-54

-4, 1.0 SIILE .TUPREY POINT NUCLEARPOWER PLANTUNIT4 RE-CHTEL9010CR CORPORATION CCC  ! .0--04SDDAAOI144414001.0I CCUCDC40.SI 0100 .. ,.NCJ0 -- . *^oFEEOFAT1ER FROM FR HEOAERTO Pýl P SYSTEM C6O lID l I NC IC ID PIPINGISOMETRIC 0 "

-P-770-S-SH 1-08-3-R-I.DNG

-OLLdC' r-. ROWFx*-NC WE.yRSTROOWIS . RO ACTINUEO BEO.TEKORT~

  • ,ANCOR I. -iOLEAT STEN E Et"-5:sSR "* 5 CLOBAL COORAISREE SYSTEM Z IZ NOE O SI3WELD NUMBER 70W.1P RESRRT-. l WELD SYM.OL
  • -* ~ ~~ SCONTINUD BELOW *ZJE ~

S. NUMBER'S LINE. & WHIP GENERAL RESTRAINT NOTES LDCATIDPS*

V~~~1 -I LL LOTINFAORMATION, AI WELD WUMBERS & LCAETIONS. IHATH EARE OCLL, FOR IS[ REFERENCE AK ISIE A I EONTINUET OW ISO U0 0 CO RT TBTIOD ITHE 1 E 0 L 3 NT)

R0 ) FG GCRA.

4.

END 6< * ~-. I RKOWTOTS I.SHEETSTEL PEENLR pROCESS PEW00-090 SMALL MUAL (SPU)

WEEOOWOIWCTEO EONRELVIN EITHPEW oo2 CONTROL TUOTNG, OUTGELORK VALVES 0N0 ELTINCOAT 3)NTLL NEVs A, METER.SEED7ETAIL LEERULTRYSONIR ELTV

/6 0 ENEAYTERCMLETTEN CF"ALL..EFMNETEVO. BEHAVE TEYPORARR PIPING

) ICORREMOVAL CE"PIPINGEONEYEISSTALLATI[OR CEORELEERSEE CLASS, P20  : A BECTEL CEHOTITION CCC. PTN-P-OO-OCD-OCA.

TEAP:

DESIOS (D -,

,F ,.i 091 1 1L.DIREC0T OF HISN H 08-093 7.TF*pIPING INSULATION*

SHALNLO CEOLL RE BEORADINATDG REMYVUEA PEN IH, C CO ANII VECYOREO PER LATER 0ESIN PESS:v' C 3. UBIO ord~ oS SNALL CH BE CIN S'JPPORTED PROCE RINSTVLLO'IDON SPEI SNU00PER MAUT'NO R OPECE-OAI.

FOOR (SPM)C NGE X TND WELDI~

4 F** ,* 1s.

  • w OP.BRZSzz De E p k4AX;IP+

IW~~~~~~k'.~~~~2 "NT~ITTEW OCPEREORRE] IN ACCORDANCE VE-,O7 R A-TO t RLLVTHON WTLL -A-I-.

CEHEADER.

ELOC MEASSREMENST OSTER CONTDCENTERLINE ILATERT "CATIER NE ANOCUMENT LEP ULTRASONIC FLO METE.SE DETIL IEEN7 /*ORE STRESS UNOER TRUC 5E140 EALANTED FO 0803,SLLO ATRAL 0 L[TYCCT[RN CEELORB PIS0RCAW ONS ON K

P]0N00AL TNC IPS. SLOW pIpIN TO. FEK.A COWSTRUIIET ON UOERT.TE 800O PRRNSOE TOmpONRAR W.PPORTS 000N/OR 18008, 0000 1 -001- 000) 000000 0100 000/ON SLEOCR, SOT UP ON TO NSAT DE00GNPRESS COMPOREIM VALE TUSSIN OREAEDL 000NG.

RpLSAPE ALL/OR S. NSOTy REPLACE RoB

  • 0-l ROTW 01

- 005800. 0000800 0(500 00.

mROO

~ ~~~~~

oN 000 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~

0G 800SHALL ~

ONPRERIPNGSSPETCI ~ ~ ~ TB j B0E805800S0UPPORTED08Y88R1 ASPOVD C-rI 021.O UV NC TRAHSNIT-PRVEOSOSAR DNA LATER0PE LN T UNIT V LEE MT E R P OWER C RPOR A T ION R TURKEY P OINT NUCLEAR POWER PL AN STOECT TEA BFSEE SPINTRECOWAT-ER F RC L DRSNEC 74 OUTSIDECONTAINMENT * , r -- /

  • r*

SYSTEMR NO.

.. . . ... . . ... 1500 1000

. 00OW 0 ISOOTILC 0 0 CeI.- I NO

[ *~~614-P-770-S-SS 2_O8-093_RN-l.WG

0OL~7 LS

.IM-.I-flM~IM ,.,~MMI~T~a I ,TI ~1 IOCM *MlTIEI~I " IA~*~.IMT**IE

' IC V TD

~s ~I

  • SINGILE OLBLEt ACTENC DIRECTION INWOE CESTEMp~

?*'*__ o- A -,e~j,'

SANCHORa ROUTED ELDED xI-p O I-Rj.ý r-4I ,' 5 - GLOBAL C ,I.COORDINATE SYSTEM

.o M MOTE, NO. OEE 00

. AIO T I "10, I~S1.ELDNODDER WE RESTROIST S TL OO SWN- , COHNE CONTINUED BELOW 44SI VESIS*OE N OTRI, 'NSTLL VALVESIG ,' DW PIPE A EL -C.

N 4')

INC-P-2 AR O5 R

- - C TNICCUEC0SIA" 7-.S 5 I JSR.ELO W

8.S PROLE I 5 CLASS A E C CI~fJC ESI.TPR ESS -COASI.

!/CONTINUED D.l AUAUU OW.C.CESS.

EP 4D*

PRA~ 1CCSPSI.

  • C*=O/kEE E TLoro SN207 E4*B L* TON-V.EOIU -AAV 'HWERS,_4_N I .1 tHS lE
13. pllA' CCH EHOWN SDR.WIGN 'SEN' 'CLU* STRESS PROBLEMI VRE-C I .SE0II CtRSNCFO CON*N~EC ON ~J ~ NI CI M A o 2N C.C.D T S 1

T I 5

. LW NTOLEVETCAIN T S 42) LI 2 MOPW. RET.EMP TICITF

  • . ,
  • ON
  • V150R* 4.
  • RST*LU*T*0ONTNUE I N O C.O F L NA EIC EO C STIHO L MW SCi'

-2 4"114~~.R ELBOW4I*I ABV I l l I I ~ CR A G ERM I SRE T E N E 8 03 C N T UC IN SCC MANIEN PENETRAETIONSYSTMS SEEO~t PROCECS REIE SPECIA AND F-M APE tELB STItil CIUA G(-) 56IT-T-70D-ELS IE tCRC /

RA ONE C A C5 EIFYAND W RMCI E VAITDCTAGC O IT" OTESJIOTG TCCCIM CIGE.OR*TNI TATE NUT ERA LIMN[ ATC-D P/ L TLMHNTINUE 5

TRIO S DR O NEELL BE RE C E

LINSA NU TWE ED O TTR ALL I ,

- ON CI SAI T CC-M NT D DTrTEC SHEETS ITN CCAOISG 5AINE-PT-N7.--I 01 SEEM EVALUATED UMICICEERESIRENS . I N~O TE'.

MALIESEMTC NTNI TC WTO EM F~ NETRONS RTECIO 1 I Oo~A1W

  • of T TO fl SYSTM NO. I4 OUITEMSCITDE TON aiMENT

- MAlET.CCCI

.... . .. . . .... . .. .. . . V S 0NO [ G WO 0O* D C N NM 5 14- P - 7 70 - /08 - 09 C IIA E GNI E-SOW PP-G I SO ETIC 14-P-770-P-SC

v I 1c. D9-1 KMALL CONSTRWIZON NOTES 'NASEH NOTES CONSTRUCTION F-Pif i2-4 -CMf,ý.'0. N T.

SEEPEN0-1.9 LEFT Coll Qkb N CON -ED-"' DETAIL A AWý LEFT CONS1 NX)"

T-Cro,' ITEDTEE .9 .19

-m N.

C TINJED ATRIONT

-019 PCM 08-188 Pcm 09-019 HASE I &-I SNEE RCSTNANTS MCT ONI:F SIC.

NOTE-DE.I. IMStATE AtlZED 'I AýPERýEL IS N!4býiD M, IF-Aiý &ý D AN.M

ýC-For V--- ST.-

GLO- COWDI-CSYSTEM ra GENERAL NOTES N.. -US ON

= 9 - E cOORON"TIO WETSI 4 s, 0' SEE0 PMýENUI& WE ON ýV04O1.MIA-770-5 541.

SHOiN ONTNIS ýN- BEENVALUATED TtIl VNESý If -019 / BILL OF MATERIALS jaýa!L-vsL-.

1-11 11 ITT "Ll 11 Tm D.o.

DIM-MAL DISPIAMý' '1_D' CDAND(m p MaJ I 5610-217-S PEN 08-188 BILL OF MATERIALS

-- T-PTIVN

ý--- -- m

.A ý",YAf iý 11 _F11-DATE s-c -j--BECHTLL-PD9LR-CZPffGllGI4---

N JER ND U111T 4 -T 1 11 NA1. -1 -1. MAINFEEUVTC ii. cw - T

-Raýco SYSTEM NP,74 OUT [JýI`ESC.ýXýI.MENT I 5614-P-7 PING ISOM