MONTHYEARL-2021-073, Environmental Protection Plan Report Request to Renew Industrial Wastewater Facility Permit2021-04-16016 April 2021 Environmental Protection Plan Report Request to Renew Industrial Wastewater Facility Permit L-2020-095, Environmental Protection Plan Iww Permit No. FL0002208 Minor Permit Revision for Chlorine Dioxide2020-06-0909 June 2020 Environmental Protection Plan Iww Permit No. FL0002208 Minor Permit Revision for Chlorine Dioxide L-2018-128, Environmental Protection Plan Report Unusual or Important Environmental Event - Turtle Mortality2018-06-14014 June 2018 Environmental Protection Plan Report Unusual or Important Environmental Event - Turtle Mortality L-2017-160, Environmental Protection Plan Report Minor Permit Revision Request for Blowdown Sample Panel Discharge Iww Permit No. FL00022082017-09-13013 September 2017 Environmental Protection Plan Report Minor Permit Revision Request for Blowdown Sample Panel Discharge Iww Permit No. FL0002208 L-2017-012, Environmental Protection Plan Report2017-01-24024 January 2017 Environmental Protection Plan Report L-2016-069, Environmental Protection Plan Report - Request to Renew Industrial Wastewater Facility Permit2016-03-29029 March 2016 Environmental Protection Plan Report - Request to Renew Industrial Wastewater Facility Permit ML15313A3992015-10-0707 October 2015 St. Lucie, Units 1 and 2 - Submittal of Environmental Protection Plan Report Providing Additional Information Requested Regarding Biological Plan of Study L-2015-260, St. Lucie, Units 1 and 2 - Submittal of Environmental Protection Plan Report Providing Additional Information Requested Regarding Biological Plan of Study2015-10-0707 October 2015 St. Lucie, Units 1 and 2 - Submittal of Environmental Protection Plan Report Providing Additional Information Requested Regarding Biological Plan of Study ML15313A4742015-09-30030 September 2015 St. Lucie, Units 1 and 2 - Biological Plan of Study Implementation, Common and Sci Names ML15313A4652015-09-30030 September 2015 St. Lucie, Units 1 and 2 - Biological Plan of Study Implementation, Sea Turtle Data ML15313A4412015-09-30030 September 2015 St. Lucie, Units 1 and 2 - Biological Plan of Study Implementation, Taxonomy QA Info ML15313A4402015-09-30030 September 2015 St. Lucie, Units 1 and 2 - Biological Plan of Study Implementation, Sampling Dates All ML15313A4392015-09-30030 September 2015 St. Lucie, Units 1 and 2 - Biological Plan of Study Implementation, Lab Sorter QA Scans ML15313A4382015-09-30030 September 2015 St. Lucie, Units 1 and 2 - Biological Plan of Study Implementation, IP Volume Filtered ML15313A4372015-09-30030 September 2015 St. Lucie, Units 1 and 2 - Biological Plan of Study Implementation, IP Numbers ML15313A4222015-09-30030 September 2015 St. Lucie, Units 1 and 2 - Biological Plan of Study Implementation, Gill Net Soak Time ML15313A4212015-09-30030 September 2015 St. Lucie, Units 1 and 2 - Biological Plan of Study Implementation, Gill Net Length Data ML15313A4202015-09-30030 September 2015 St. Lucie, Units 1 and 2 - Biological Plan of Study Implementation, Gill Net Batch Weight Data ML15313A4192015-09-30030 September 2015 St. Lucie, Units 1 and 2 - Biological Plan of Study Implementation, Gill Net Num Col-Meas ML15313A4032015-09-30030 September 2015 St. Lucie, Units 1 and 2 - Biological Plan of Study Implementation, Beach Seine Length Data ML15313A4022015-09-30030 September 2015 St. Lucie, Units 1 and 2 - Biological Plan of Study Implementation, Beach Seine Batch Weight ML15313A4012015-09-30030 September 2015 St. Lucie, Units 1 and 2 - Biological Plan of Study Implementation, Beach Seine No. Coll-Meas ML15313A4002015-09-30030 September 2015 St. Lucie, Units 1 and 2 - Biological Plan of Study Implementation, Addendum to Final Report and List of Contents L-2015-260, St. Lucie, Units 1 and 2 - Biological Plan of Study Implementation, Common and Sci Names2015-09-30030 September 2015 St. Lucie, Units 1 and 2 - Biological Plan of Study Implementation, Common and Sci Names L-2015-260, St. Lucie, Units 1 and 2 - Biological Plan of Study Implementation, Sea Turtle Data2015-09-30030 September 2015 St. Lucie, Units 1 and 2 - Biological Plan of Study Implementation, Sea Turtle Data L-2015-260, St. Lucie, Units 1 and 2 - Biological Plan of Study Implementation, Taxonomy QA Info2015-09-30030 September 2015 St. Lucie, Units 1 and 2 - Biological Plan of Study Implementation, Taxonomy QA Info L-2015-260, St. Lucie, Units 1 and 2 - Biological Plan of Study Implementation, Sampling Dates All2015-09-30030 September 2015 St. Lucie, Units 1 and 2 - Biological Plan of Study Implementation, Sampling Dates All L-2015-260, St. Lucie, Units 1 and 2 - Biological Plan of Study Implementation, Lab Sorter QA Scans2015-09-30030 September 2015 St. Lucie, Units 1 and 2 - Biological Plan of Study Implementation, Lab Sorter QA Scans L-2015-260, St. Lucie, Units 1 and 2 - Biological Plan of Study Implementation, IP Volume Filtered2015-09-30030 September 2015 St. Lucie, Units 1 and 2 - Biological Plan of Study Implementation, IP Volume Filtered L-2015-260, St. Lucie, Units 1 and 2 - Biological Plan of Study Implementation, IP Numbers2015-09-30030 September 2015 St. Lucie, Units 1 and 2 - Biological Plan of Study Implementation, IP Numbers L-2015-260, St. Lucie, Units 1 and 2 - Biological Plan of Study Implementation, Gill Net Soak Time2015-09-30030 September 2015 St. Lucie, Units 1 and 2 - Biological Plan of Study Implementation, Gill Net Soak Time L-2015-260, St. Lucie, Units 1 and 2 - Biological Plan of Study Implementation, Gill Net Length Data2015-09-30030 September 2015 St. Lucie, Units 1 and 2 - Biological Plan of Study Implementation, Gill Net Length Data L-2015-260, St. Lucie, Units 1 and 2 - Biological Plan of Study Implementation, Gill Net Batch Weight Data2015-09-30030 September 2015 St. Lucie, Units 1 and 2 - Biological Plan of Study Implementation, Gill Net Batch Weight Data L-2015-260, St. Lucie, Units 1 and 2 - Biological Plan of Study Implementation, Gill Net Num Col-Meas2015-09-30030 September 2015 St. Lucie, Units 1 and 2 - Biological Plan of Study Implementation, Gill Net Num Col-Meas L-2015-260, St. Lucie, Units 1 and 2 - Biological Plan of Study Implementation, Beach Seine Length Data2015-09-30030 September 2015 St. Lucie, Units 1 and 2 - Biological Plan of Study Implementation, Beach Seine Length Data L-2015-260, St. Lucie, Units 1 and 2 - Biological Plan of Study Implementation, Beach Seine Batch Weight2015-09-30030 September 2015 St. Lucie, Units 1 and 2 - Biological Plan of Study Implementation, Beach Seine Batch Weight L-2015-260, St. Lucie, Units 1 and 2 - Biological Plan of Study Implementation, Beach Seine No. Coll-Meas2015-09-30030 September 2015 St. Lucie, Units 1 and 2 - Biological Plan of Study Implementation, Beach Seine No. Coll-Meas L-2015-260, St. Lucie, Units 1 and 2 - Biological Plan of Study Implementation, Addendum to Final Report and List of Contents2015-09-30030 September 2015 St. Lucie, Units 1 and 2 - Biological Plan of Study Implementation, Addendum to Final Report and List of Contents L-2015-260, Biological Plan of Study Implementation, Water Quality Data - Tables 1-202015-04-30030 April 2015 Biological Plan of Study Implementation, Water Quality Data - Tables 1-20 ML15314A5872015-04-30030 April 2015 St. Lucie, Units 1 and 2 - Biological Plan of Study Implementation, Trawl Distance Data ML15314A5862015-04-30030 April 2015 St. Lucie, Units 1 and 2 - Biological Plan of Study Implementation, Trawl Length Data ML15314A5842015-04-30030 April 2015 St. Lucie, Units 1 and 2 - Biological Plan of Study Implementation, Trawl No. Coll-Meas ML15314A5832015-04-30030 April 2015 St. Lucie, Units 1 and 2 - Biological Plan of Study Implementation, Trawl Length Data ML15314A5812015-04-30030 April 2015 St. Lucie, Units 1 and 2 - Uprate Calibration Log Scans ML15313A4662015-04-30030 April 2015 St. Lucie, Units 1 and 2 - Biological Plan of Study Implementation, Final Report L-2015-146, Florida Power & Light Company - Biological Plan of Study Implementation for St. Lucie Plant EPU Final Report - August 2011 - February 20152015-04-30030 April 2015 Florida Power & Light Company - Biological Plan of Study Implementation for St. Lucie Plant EPU Final Report - August 2011 - February 2015 L-2015-260, St. Lucie, Units 1 and 2 - Biological Plan of Study Implementation, Trawl Distance Data2015-04-30030 April 2015 St. Lucie, Units 1 and 2 - Biological Plan of Study Implementation, Trawl Distance Data L-2015-260, St. Lucie, Units 1 and 2 - Biological Plan of Study Implementation, Trawl Length Data2015-04-30030 April 2015 St. Lucie, Units 1 and 2 - Biological Plan of Study Implementation, Trawl Length Data L-2015-260, St. Lucie, Units 1 and 2 - Biological Plan of Study Implementation, Trawl No. Coll-Meas2015-04-30030 April 2015 St. Lucie, Units 1 and 2 - Biological Plan of Study Implementation, Trawl No. Coll-Meas L-2015-260, St. Lucie, Units 1 and 2 - Uprate Calibration Log Scans2015-04-30030 April 2015 St. Lucie, Units 1 and 2 - Uprate Calibration Log Scans 2021-04-16
[Table view] Category:Letter type:L
MONTHYEARL-2024-010, Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3)2024-01-25025 January 2024 Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3) L-2024-004, Relief Request (RR) 7, Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1) Extension of Inspection Interval for Reactor Pressure Vessel Welds from 10 to 20 Years2024-01-18018 January 2024 Relief Request (RR) 7, Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1) Extension of Inspection Interval for Reactor Pressure Vessel Welds from 10 to 20 Years L-2024-002, Withdrawal of Proposed Alternative to American Society of Mechanical Engineers (ASME) Operation and Maintenance (OM) Code for the Auxiliary Feedwater (AFW) 2C Pump2024-01-0808 January 2024 Withdrawal of Proposed Alternative to American Society of Mechanical Engineers (ASME) Operation and Maintenance (OM) Code for the Auxiliary Feedwater (AFW) 2C Pump L-2023-173, Quality Assurance Topical Report (FPL-1) Revision 30 Update2023-12-15015 December 2023 Quality Assurance Topical Report (FPL-1) Revision 30 Update L-2023-179, Unusual or Important Environmental Event - Turtle Mortality2023-12-14014 December 2023 Unusual or Important Environmental Event - Turtle Mortality L-2023-168, License Amendment Request Supplement to Revision 2 for the Technical Specifications Conversion to NUREG-1432 Revision 52023-12-12012 December 2023 License Amendment Request Supplement to Revision 2 for the Technical Specifications Conversion to NUREG-1432 Revision 5 L-2023-155, Supplement to Response to Request for Additional Information, Revised NextEra Common Emergency Plan, and Revised Site-Specific Emergency Plan Annexes Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-06542023-11-28028 November 2023 Supplement to Response to Request for Additional Information, Revised NextEra Common Emergency Plan, and Revised Site-Specific Emergency Plan Annexes Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, L-2023-162, Response to 50.69 2nd Round of Rals2023-11-21021 November 2023 Response to 50.69 2nd Round of Rals L-2023-131, Subsequent License Renewal Application - Second Annual Update2023-09-28028 September 2023 Subsequent License Renewal Application - Second Annual Update L-2023-136, Supplement to License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors2023-09-26026 September 2023 Supplement to License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors L-2023-122, Corrections to the 2022 Annual Radiological Environmental Operating Report2023-09-20020 September 2023 Corrections to the 2022 Annual Radiological Environmental Operating Report L-2023-127, Correction to the 2022 Annual Radioactive Effluent Release Report2023-09-18018 September 2023 Correction to the 2022 Annual Radioactive Effluent Release Report L-2023-113, Correction to the 2020 Annual Radiological Environmental Operating Report2023-09-14014 September 2023 Correction to the 2020 Annual Radiological Environmental Operating Report L-2023-118, Response to Request for Additional Information Regarding License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors2023-09-11011 September 2023 Response to Request for Additional Information Regarding License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors L-2023-108, Report of 10 CFR 50.59 Plant Changes2023-09-11011 September 2023 Report of 10 CFR 50.59 Plant Changes L-2023-112, Corrections to the 2021 Annual Radioactive Effluent Release Report2023-09-0606 September 2023 Corrections to the 2021 Annual Radioactive Effluent Release Report L-2023-107, Technical Specification Bases Control Program Periodic Report of Bases Changes TS 6.8.4.j.42023-09-0606 September 2023 Technical Specification Bases Control Program Periodic Report of Bases Changes TS 6.8.4.j.4 L-2023-114, Proposed Turkey Point Units 6 and 7; Seabrook Station; Point Beach Units 1 and 2 - Official Service List Update2023-08-17017 August 2023 Proposed Turkey Point Units 6 and 7; Seabrook Station; Point Beach Units 1 and 2 - Official Service List Update L-2023-098, and Point Beach Units 1 and 2 - Response to Request for Additional Information Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 22023-08-0707 August 2023 and Point Beach Units 1 and 2 - Response to Request for Additional Information Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 2 L-2023-105, Preparation and Scheduling of Operator Licensing Examinations2023-08-0303 August 2023 Preparation and Scheduling of Operator Licensing Examinations L-2023-099, Pump Relief Request 10 (PR-10), One-Time Request for an Alternative to the American Society of Mechanical Engineers (ASME) Operation and Maintenance (OM) Code for the Auxiliary Feedwater (AFW) 2C Pump2023-07-26026 July 2023 Pump Relief Request 10 (PR-10), One-Time Request for an Alternative to the American Society of Mechanical Engineers (ASME) Operation and Maintenance (OM) Code for the Auxiliary Feedwater (AFW) 2C Pump L-2023-102, Relief Request PSL2-15-RR-01, Proposed Alternative to ASME Section XI Code Examination Requirements for Reactor Vessel Bottom Area and Piping in Covered Trenches2023-07-26026 July 2023 Relief Request PSL2-15-RR-01, Proposed Alternative to ASME Section XI Code Examination Requirements for Reactor Vessel Bottom Area and Piping in Covered Trenches L-2023-097, Subsequent License Renewal Application Revision 1 - Supplement 62023-07-13013 July 2023 Subsequent License Renewal Application Revision 1 - Supplement 6 L-2023-076, In-Service Inspection Program Owner'S Activity Report (OAR-1)2023-07-11011 July 2023 In-Service Inspection Program Owner'S Activity Report (OAR-1) L-2023-087, Florida Power & Light/Nextera Energy, Results of the Safety Culture Program Effectiveness Review, March 20, 2023 (ADAMS Accession No. ML22340A452)2023-06-29029 June 2023 Florida Power & Light/Nextera Energy, Results of the Safety Culture Program Effectiveness Review, March 20, 2023 (ADAMS Accession No. ML22340A452) L-2023-082, Subsequent License Renewal Application Revision 1, Supplement 52023-06-14014 June 2023 Subsequent License Renewal Application Revision 1, Supplement 5 L-2023-074, Addendum to 2021 Decommissioning Funding Status Reports / Independent Spent Fuel Storage Installation Ctsfsi) Financial Assurance Update2023-06-0202 June 2023 Addendum to 2021 Decommissioning Funding Status Reports / Independent Spent Fuel Storage Installation Ctsfsi) Financial Assurance Update L-2023-071, NextEra Energy Quality Assurance Topical Report (FPL-1) Revision 29 and Florida Power and Light Company Quality Assurance Program Description for 10 CFR Part 52 Licenses (FPL-2) Revision 11, Annual Submittal2023-05-22022 May 2023 NextEra Energy Quality Assurance Topical Report (FPL-1) Revision 29 and Florida Power and Light Company Quality Assurance Program Description for 10 CFR Part 52 Licenses (FPL-2) Revision 11, Annual Submittal L-2023-059, Subsequent License Renewal Application - Aging Management Requests for Additional Information (RAI) Set 4 Supplemental Response2023-04-21021 April 2023 Subsequent License Renewal Application - Aging Management Requests for Additional Information (RAI) Set 4 Supplemental Response L-2023-055, 2022 Annual Environmental Operating Report2023-04-12012 April 2023 2022 Annual Environmental Operating Report L-2023-041, Annual Radiological Environmental Operating Report for Calendar Year 20222023-04-0404 April 2023 Annual Radiological Environmental Operating Report for Calendar Year 2022 L-2023-051, Report of 10 CFR 50.59 Plant Changes2023-04-0404 April 2023 Report of 10 CFR 50.59 Plant Changes L-2023-021, Units, 1 and 2, Turkey Point, Units 3 and 4, Seabrook Station and Point Beach, Units 1 and 2 - Decommissioning Funding Status Reports / Independent Spent Fuel Storage Installation (ISFSI) Financial Assurance Update2023-03-28028 March 2023 Units, 1 and 2, Turkey Point, Units 3 and 4, Seabrook Station and Point Beach, Units 1 and 2 - Decommissioning Funding Status Reports / Independent Spent Fuel Storage Installation (ISFSI) Financial Assurance Update L-2023-042, Periodic Update of Population Data within 10 and 50 Miles of the Plant2023-03-27027 March 2023 Periodic Update of Population Data within 10 and 50 Miles of the Plant L-2023-026, Subsequent License Renewal Application - Aging Management Requests for Additional Information Set 42023-03-27027 March 2023 Subsequent License Renewal Application - Aging Management Requests for Additional Information Set 4 L-2023-028, and Point Beach Units 1 and 2, 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications2023-03-27027 March 2023 and Point Beach Units 1 and 2, 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications L-2023-025, Fleet Relief Request (Frr) 23-01, Proposed Alternative to ASME Section XI Authorizing Implementation of ASME Code Case N-752-12023-03-15015 March 2023 Fleet Relief Request (Frr) 23-01, Proposed Alternative to ASME Section XI Authorizing Implementation of ASME Code Case N-752-1 L-2023-029, and Point Beach Units 1 and 2 Nuclear Property Insurance - 10 CFR 50.54(w)(3)2023-03-10010 March 2023 and Point Beach Units 1 and 2 Nuclear Property Insurance - 10 CFR 50.54(w)(3) L-2023-039, Cycle 27 Core Operating Limits Report2023-03-0707 March 2023 Cycle 27 Core Operating Limits Report L-2023-032, 2022 Annual Radioactive Effluent Release Report2023-02-28028 February 2023 2022 Annual Radioactive Effluent Release Report L-2023-038, 2022 Annual Operating Report2023-02-28028 February 2023 2022 Annual Operating Report L-2023-016, Radiological Emergency Plan - Revision 74 Report of Changes to Emergency Plan2023-02-15015 February 2023 Radiological Emergency Plan - Revision 74 Report of Changes to Emergency Plan L-2023-019, Annual Summary of Commitment Changes Implemented Without Prior NRC Notification for Calendar Year 20222023-02-15015 February 2023 Annual Summary of Commitment Changes Implemented Without Prior NRC Notification for Calendar Year 2022 L-2023-009, Owner'S Activity Report2023-01-31031 January 2023 Owner'S Activity Report L-2022-188, Unusual or Important Environmental Event - Turtle Mortality2022-12-19019 December 2022 Unusual or Important Environmental Event - Turtle Mortality L-2022-185, Turkey Points, Units 3 & 4; Seabrook Station; and Point Beach, Units 1 and 2 - Supplement to License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 22022-12-0909 December 2022 Turkey Points, Units 3 & 4; Seabrook Station; and Point Beach, Units 1 and 2 - Supplement to License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 2 L-2022-175, Application to Adopt 10 CPR 50.69, 'Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors2022-12-0202 December 2022 Application to Adopt 10 CPR 50.69, 'Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors L-2022-180, CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums2022-11-0909 November 2022 CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums L-2022-165, Subsequent License Renewal Application - Aging Management Request for Additional Information (RAI) 4.3.1-1a(second Round) - Class 1 Fatigue Response2022-10-26026 October 2022 Subsequent License Renewal Application - Aging Management Request for Additional Information (RAI) 4.3.1-1a(second Round) - Class 1 Fatigue Response L-2022-160, Station,, Point Beach Units 1 and 2, License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 22022-10-0404 October 2022 Station,, Point Beach Units 1 and 2, License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 2 2024-01-08
[Table view] |
Text
0 Florida Power & Light Company, 6501 S. Ocean Drive, Jensen Beach, FL 34957 FPL April 7, 2009 L-2009-079 10 CFR 50.36.b EPP 3.2.3 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 RE: St. Lucie Units 1 and 2 Docket Nos. 50-335 and 50-389 Environmental Protection Plan Report Approved Minor Revision to Industrial Wastewater Facility Permit No. FL0002208 The attached minor revision to the Industrial Wastewater Facility Permit is being submitted pursuant to the requirements of Section 3.2.3 of the St. Lucie Units 1 and 2 Environmental Protection Plans. The revision was approved on March 11, 2009.
Sincerely, Eric S. Katzman Licensing Manager St. Lucie Plant ESK/CAA Attachment Cooc/
an FPL Group company
St. Lucie Units 1 and 2 L-2009-079 Docket Nos. 50-335 and 50-389 Attachment Environmental Protection Plan Report Page 1 of 4 Approved Minor Revision to Industrial Wastewater Facility Permit F fridDe artent ofrhrleCh Environ men tal Protection I'rr 1lun
~FLOR A: Boh NTrjI irnz Center
'2600 ft:af; Stone Roaad ~-~ ~
TalIalIwsvu, Florida 3,2399-24I00 NMfTCh t 1, 2009 a _YC, 7R I F(f*L~f) N-fAIk11 l~fr. G3orda~n 1. RJohnstrm Vicrc PrrsidentL 8I, Lwie Plant Florida Flower & Li~ght Conipary 6501&Ocean Fbive Jenisen Beacth, Floridto 34957 RE: 'Florida Poiver &- Light Comipany
'51. U360 Power Plantri, St Lt-tcic. County
-)U~PFilec Nos. FL0u02,2og40"OR]WVMR and FLOOW 2 &O(MO9.IWi IVR
- Approv.-I of Nirior Re~visions D & E, fbir Upratc o JUTtf I Ind 2 ,ard Revisf41 Design Flov, for (QL1i;C-lhTowIh Cno h-'ip Watcr SysatCi Dt'.Ir MiviJohnston:
'TlcJ[)ýcanr~trv.:t roctAAvcd two juihor pcnixit ~i-vkisio applications fo IFloridai Power & ILight Coniplmy (F"P&L-)
S.Lucie Plant- The firs# proposc4I inijucN rvisionnis t0 atlilhorizt Ilie inc~rcaae of' nct liowcr output for Urbils Iand 2 Iky 206 mega1watt. "I'lic~sccond rniior rcvi.3ion reviscs tIhe stated desiign flow fibr Iie onm~c-IhIrotah, cooilitg
,6vaift-r :systein frorn I4 ?J{to 141:97 milllionl ivalon.s per day, The IDeparineant has d .crimined Owi Ihcsoý activitiic qlunaiy as miinor moditicatihnti ofihc QperaTions, at the qt. Locie Plant, pursuant 0o [We< 62-620, 200(24), FIkuida Actmi,6istrijlive Lodtr (I' A (.), and can he quiltoizend by mititor pertnit itvisicis Rnq ~uant' to R'Iule 62-620.325(2).
1I.A.C. This~ hltetr aind attachinern constific' a niinor rvft.-inn 'ko the refemiuccd pnIt.
Fmaawalc iJIL: lxml is revi~sed as staiedI in ilia atoac~hmI p criii pages unle-ssFP-&-L decides lo file a timely, Sttrci crit PCtiiiCin .fb 41n adlniniiru' fnivc. heairing u~nder '.cciort 120.57, F10iidrt stautuks. Thc PrOcedures for petiflirolin brr it lhearing are set forth in the aliachrneni titted "Notice of RIellts,'
Ifyou have ony questions regarding this permit revision, plcase 00I)IfCt IV.-,IC Hiftnis, III_ inuihe Indusirial Wis lewal c~rScaftion at (8 50,) 24 5-858 9.
Div isiun o F Wa te r R~c'ro nece Management Al~ttaeinants ct;2 Timi Yo-owell, P.FE, k-l)EP West'in Bamlcs.ch
]ton I-liX, F~PL.
ii ~i.c ~4~it4;A;',e~
St. Lucie Units 1 and 2 L-2009-079 Docket Nos. 50-335 and 50-389 Attachment Environmental Protection Plan Report Page 2 of 4 Approved Minor Revision to Industrial Wastewater Facility Permit NOTICE OF1 lUGHTS A c-Pst wlue stiSM 0tll ihthrclts a'e atf~cTut by this plermit V'eIU io-m ea) :Fo an, ix.itionf adrninisira~iviv prow ediing {fiic!i[t ) i, acorda-iee with Sc.tion 120.57, Florida Statutes. The pefition mt contain the infbrnalion s9d foil1 below ind must he filed (received) in the Office of General Counsel ofthe
!)cuiihnent at 3910 Comnonwteallh 0Bollevard, ,Mail Station 35, iallalassce-, Florida 32399-30(00,, wilhin 14 dapys of teipt of this Pen-nit. A petitioneir, other than the applic.ani, shall mail a copy of h+e lieliliun to the applicant al the address indicated in the ziiachd leiter it the ihnc of filing. Failure so file, a petitirM within this lime, period shall constitul a wal*ier of ;my ri it sricch person may have, o request an adminisihadive
¢lermination (lhearing~) uinder Nectiore l2057* Fkierida Nlaluie.s,.
Tic Pc!ilio, Shall contain the foliuwijig inl:tuadion:
na (a) "L~ti'htl.+ ddress, and itlephone nimfber ofcrach pctitinncr, tic no nic, addres.s and Ic lephnne iml3bcrot t[le pttiiki*ri's itpresientative, if any; the Deprtimint caso identilfication iiunlber and the ciunty in iwhich tlio uetlo lmatllr or activity is ote Wd; (6) A stat.iment of how and[ when u,1cli Il~ilioner reeived notie- of Ihc Deimartrmrent flCi4; (c. A slatevicnt of IkDW vLlch petit ioneq's stostanlial interests are a'fected by the Dcpartment action; (d) A statement of aLL dispttx- is6sses ofrtltU alT facl. 10h arnont, ,rv the petition mttwt so indicte; "
(e) A .tahennln of facts thai like petitiorle mouitluts wn.iTant rev,etra-,l or mndificaiinn of thee iDepartinni actrion; (r) A conciwasterrent of the ulli rnaine -¢cts allqged, as well as 01e rules ind statulcs which entitlt the p.-li!iioir 14iclhef; awl (p) A slalemnirt of the relief souglit by the plitlioujer, s%1"tinjg prCCci'Scy Qic aetiotn that tihe petitioner wianistthe to lake, Ita lictition iz; filed, the adniinittrative hearinh? process is desipted to fonniilate ag*i yarcliol,.
Accordingly, the D013arknwnt'S final a*etikii rt*ty be df01irent from tje. po.; iTio1 t[rken by i! in this ilncnit. Pers0on whlme sulbslanial intereists will be, a5ff*led by any dccxision otthe Depalitiii!ent wit*l regardt tclýc applicaition have 11he!-C611t to ptmition to become a party io (tie lioca-dioig. "111e pelilion tll/ust conform to the reqivenivnIts sp!eieimi above and be ilIed (received) wilIhin 14 days ofireoeipt of his intentI inllthe Office of Genteral C:oui.scl lit the above address of the Depatimnt. Failire to petition withinl the allowed hime frame eonsititues a waiver ofaany Tight slich perzn has to reLicalt a e*arintg vtder Section 120-57, iV.S., and to parIicipatc as Rparty to this proceeding. ALny subsequent jnlervenlicwi will only be at the approval of the presiding officer upon motion filed pursuait oIRuLe 28-5.207, FA.C,
St. Lucie Units 1 and 2 L20-7 Docket Nos. 50-335 and 50-3 89 Attachment Environmental Protection Plan Report Page 3 of 4 Approved Minor Revision to Industrial Wastewater Facility Permit F~LOR1DA DEPARTMENT OF13FNVIONMENTA L.PRcIEI TCT [ON 2600 BLAIR.STONE ROAD TALLAHASSEE~, FLORIDA 323 99-2'100 S-rATEMET41*0r BPIASIS FOR MNOýR, PlRM RVSO VR REPOWETRThIG OF J3ARrow, POW~R uNj P~ernii: NLmbcr. FLOC(22108 Applicat~io r~ite.- Decen be:i 19, 2007 {Revi,4un DŽ)
])hP FI',le Nios.: FLt.000r22O3008-AWWM/R JLamuiay 4, 2008 (Revisiun F)
FL0022)-009IWIIMRAdditionual Infoiruiition; Marcha 18, 2008, October 1, 2008, Jaznriry 21, 2 009 P1Ci111il Wri'lur: fala Non A, Mwi--= and Addms, ofrAppl icant
'Ftixhtl Powecr & Lig-lt Comnpany PoI-fi0016 31x, 14000 J1uno Becach, FTJouida 33408 Foir:
64-51 SOLutb Ocean Drive Icrise.
J~c~cn.,Foida 3314W8
- 13. Vecyxiption of' N'todificajiioii Rtevi Nim3 CUT (D Flie -No.
I-LQ82-2M 99OXVDM-AR-AR The Dexiiijileiit receie~vda 1-iivor pemrit revison appliealilon requstaitkg (lut mpprovif 1< iacrvisc the nc~p wc a Iput foz Uni isEard 2 by a tio!,t of 706 11tmvi)I (MV1W). at Ilie StI. Lulcki plant, The upwrAijcz piojI onsisis of iipgiy d,,s Io vuiwl wn,l.. Thms upgrudes will iti~ckuid refuhis'lrr11bmeni arid" lit rfeacl ajvt~~sto The sten delia e~ 'arii tor, lbe 0onsite ekClrcijuil sysicnis, and 14-- plant.
Colf rtgN.ySIC3M. 1-he extra -[Wrcalri ouIpul wilil Tesu,13 frorm iinpraved pe~rfrnwriac oftb shteini tirbines, awl fr om, u.5in rtore enrichr-d urpiurni rt lul inthe rvcIlc4Ts. All imroi~cveinenil qclivi~ties Nvill oem-ur within ti t.
cýxistiiig b'urldhigs and Structures tyISSleId WithI U33ilS I and 2. No external cnpmtsirciior activific5 ore required for Ih is pr~frct.
Consiviction acli~vities for this project wiall OCeuLW prIftri'ly Chrit'itg two schedkilad u'mtages per wrilt, with cac~h Ouizagc.kviilag approxilmutly 50 ditys. Consi-isrvuionril acvkities roT [he Unit I uprotc wvill baegin during thc planmid 20 10 Sprillp ouktagC CIVd CGI)eIudC ch11,611 the, 2011 F-4ll14 ta&e. GonStrichri-Y activ itios for ilic Uný( 2.
Ltpro to will1 begin duiring~ the Viaitmed 20 1OF-ill out age andl caneICILe during thie 20 12 Spri igj6 outagev. Cni~ain
£inproven1Lrnts also will be. made whilfe the. tw~il arc operating.
tin iI I Lind 2 use once-Clu~otgh cool igj %vaterfioin the Al lantlic Oce~an ti) nrrenlovc hera" flomn the malin condases va tu crcuatig wteisysem.The condenters are. located ill Ceac]) uInit'secondutry systeal, Mmi-t~steanri is coal-ed Woliquidl waier lvxýfom- beirg re:tirocd to 1tChe &lnm Rtrtr sWemleih c ~im-y loop, Cooling water is puroped from ffic AtIonnti Occin 01101.LIh three. offshore intske ci lzures in~to the plant's Intiake eciwit. Thiz water is lhcýn ptaupcd through the imaia nconchscrs for each unit, IlJeated Wooling w~der is rcleased to lbe oiisite dischmrgc ciinal arsd buek Io the Atlantic Ocean th~rouigh cxisflig of chore pipes
St. Lucie Units 1 and 2 L-2009-079 Docket Nos. 50-335 and 50-3 89 Attachment Enviromnmental Protection Plan Report Page 4 of 4, Approved Minor Revision to Industrial Wastewater Facility Permit Florid~a Powver & Light Comprnly Pervi-.i Numbiler FL00022Ctt 81, -14~Civ o-- Pu l;ur .M~
itia of jl~l ovd dilruiers- Cii ttlation of mohln, woler i~s provided by eig~ht circul-alinpg wziltr puitpq (fowv for exti unit)
- oca,;d at ihbe biiakc. No chavl;.. to the ec cnymients are, pwposed fo,, thli,: project.i After ibeurat roe is (~npleted, thc coling ivaur flow rae. wilt Tr~nain unaikagecl, althmigh tLe lernpenraWC 7;Se. aciross the conidenw".r isLuitki1patcd lo y29F ~w v-,r eiee~
cvahhions- rli;mdiecd that 4111s i lte~a rise wilt,Tenaini kithin the i'\i:;iihtherrmal rnixing zot~imissaWih in the NPDES peroit. Undor nurmal operatinlg conJ,1ioins, thc pVnnit limits1 LthtcmIPrj1mtC weOfOX diFC1IargCL1 CGOling waici lo II 3T~ or 301P ab~ove. abicag, ivlkil*ý,eze~ is less, Whten conducti.ng n intmianre on coridickncs and/orr circulartin waltipunips, t he tcmuperawre is liimited to 11 7'f or 321F above amienbtn %V1chtfv,-i~Ie~. Mused on Floi ida Pomei aindlLight's rurout 6,r Sýý I -eic Fllnt, titled "Effects of E--ctimod Walletn Trei ertwore on thec lairinefibata arthc ý1. Lueie PIlntiArrcti dakd July 1980, a diSehargC epr~e~ ~ ra31 iti~crcaic above amrbivifl is not e cxprtcd to rcsult inm~y incm-urable thermal or biologicall impa d on the Ath ntifi Oceanui
$hine ihexrc will be no fficrevisc in L-re coolin~g wtt flow~~ rates Ps a. msul of LChr liriject, thci~e will be no chalnge
- In tle euinrd ratp-3 viatIi min ipiflgervict of aquatit, lie in the. coohirg wvater systerm.
FlftJ I i ~(EIII F Q IFik N.ýo, T'jLQO22j&99'- AVBOMR)
Nkhilv vollecting 4-OflrlnattiOn for Othe St, Lku;ic qs~1te pzoject, FIT Lvcalmnc' kowaut INt the ci,ýGla iinfg wVacitp(unpI per nnni'nee curves Car Unliz, 1, vl 2 wcrc, not lhe saine as kid b-cen pe vio'usly believed. 'Th dcsign flow for the pinmp perfunnance, cur v (Or .1hc~aiwulatiiig wiler Pump -on Unit I is ]21000 gallons per nminul (gprn), whike for 111Ce Ullit 2 pkifilps rlik ,,Lml flow is 122,650 gpnm There arc four citculating ýv wt~v pIumps for each ullit. 111 avdiiic,c iCnoh u, it has Ltwo i cae6ct"oIinp wat cr pitmp sand ea cptunp ij)I ia,. AciV~ "o 11~(X 1pm.h rn~axirnm design flow foy all 12 pinmps is 1;0,-2,600 glpit, or 1,487 MOiD
'11) existinig NIDE~S 1"erinit slate,' 1,hf 11,lXMInMi design flow for it i 12 ptorgi is 1,478 NIGL) Ih [-Lop 1)mnt received a niuinm IJriniit rcisior oppttatios rcqLLsfin~g thatt the destig i ow be colreoted to 1, A ")*Y MODL.
This constitutcs Xevislons D) attd E (Riev. ]B) to the pemlni t All ehanuigt to the Ipermitn are noted in Re~v, F by und~crlinc or stirike-through whc~e clunges have beert infide Jbý thi:s reision.
3