L-2009-066, Notice of Legal Names Changes Update Effective 04/16/09
| ML090850432 | |
| Person / Time | |
|---|---|
| Site: | Point Beach, Seabrook, Duane Arnold |
| Issue date: | 03/24/2009 |
| From: | Nazar M Florida Power & Light Energy Point Beach, Florida Power & Light Energy Seabrook, Duane Arnold |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| L-2009-066 | |
| Download: ML090850432 (2) | |
Text
FPL Energy AN FPL GiRouP COMPANY MAR 2 42009 L-2009-066 U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555
Subject:
Duane Arnold Energy Center Docket No. 50-331 Point Beach Nuclear Plant, Units 1 and 2 Docket Nos. 50-266, 50-301 Seabrook Station Docket No. 50-443 Notice of Legal Name Changes The purpose of this letter is to provide a courtesy notice to the Nuclear Regulatory Commission (NRC) of a legal name change to the licensees for the Duane Arnold Energy Center (DAEC),
Point Beach Nuclear Plant, Units 1 and 2 (Point Beach), and Seabrook Station (Seabrook).
Effective April 16, 2009, the legal names of the following licensees will be changed as follows:
Old Company Name New Company Name FPL Energy Duane Arnold, LLC NextEra Energy Duane Arnold, LLC FPL Energy Seabrook, LLC NextEra Energy Seabrook, LLC FPL Energy Point Beach, LLC NextEra Energy Point Beach, LLC These changes are to the legal names of the licensees only and do not change the corporate structure for any of the licensees for DAEC, Point Beach, or Seabrook. All other information and business aspects of each company will remain the same. While the legal names of each company will be changed, no physical changes are being made to DAEC, Point Beach, or Seabrook, there will be no changes to the day-to-day operation of those facilities, and there will be no changes to the current design or licensing bases of those facilities.
Requests for administrative license amendments to reflect the legal name changes for each licensee will be submitted to the NRC at a later date.
Should you have any questions regarding this matter, please contact Mitchell S. Ross, Vice President and Associate General Counsel, at 561-691-7126.
PO Box 14000 e Juno Beach, Florida 33408-0420 a (561) 691-7171 Fax: (561) 691-7177
L-2009-066 Page 2 Sincerely your Mano K. Nazar Senior Vice Preside and Chief Nuclear Officer FPL Energy Duan mold, LLC FPL Energy Poin each, LLC FPL Energy Seab ook, LLC cc:
Regional Administrator, Region I, USNRC Regional Administrator, Region III, USNRC Project Manager, Duane Arnold Energy Center, USNRC Resident Inspector, Duane Arnold Energy Center, USNRC Project Manager, Point Beach Nuclear Plant, USNRC Resident Inspector, Point Beach Nuclear Plant, USNRC Project Manager, Seabrook Station, USNRC Resident Inspector, Seabrook Station, USNRC