L-2004-046, Inservice Inspection (ISI) Program Missing Pages from FPLs Letter L-2004-046, Dated March 11, 2004
| ML041340277 | |
| Person / Time | |
|---|---|
| Site: | Turkey Point |
| Issue date: | 04/29/2004 |
| From: | Jones T Florida Power & Light Co |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| L-2004-046, L-2004-103 | |
| Download: ML041340277 (29) | |
Text
FPL jgpR 2 9 2004 L-2004-103 10 CFR 50.55a U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 Re:
Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 Fourth-10 Year Interval Inservice Inspection (ISI) Program Missing Pages from FPL's Letter L-2004-046. Dated March 11, 2004 FPL's letter L-2004-046, dated March 11, 2004 submitted to the Commission the Fourth 10 year Interval Inservice Inspection (ISI) Program, Plan and Schedule.
The Document Control Desk Staff discovered that the attached pages were missing from L-2004-046,. Accordingly, these pages were transmitted to Document Control Desk electronically on April 9, 2004. This letter is for completion of records on the subject submittal.
If you have any questions please contact Walter Parker at (305) 246-6632.
Sincerely, Terry 0. Jones Vice President Turkey Point Nuclear Plant Attachment cc:
Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, Turkey Point Plant 00'12 an FPL Group company
DATE: 04/15/04 REVISION:
0 TURKEY POINT - UNIT 4 INSERV5CE INSPECTION LONG TERM PLAN CLASS 2 COMPONENTS PACE: 407 RESIDUAL HEAT RMOVAL SYSTEM OUTSIDE CONTAINMZNT 4-090 INSPECTION INTERVALt PLAN STATUS
SUMMARY
EXAMINATION AREA NUMBER IDENTIFICATION ASHE SEC. XI CATEGY NDE XTEH NO METH C-F-3 PT C9.99 FTRST SECOND PERIOD PERIOD
- - - - O U T A a E 1 2 3 1 2 3 THIRD PERIOD 1 2 3 XNSTRUCTIONS
- CALBRATION BLOCK' 245200 U"-8I-2408-11 ELBOW TO PIPE 4_ - - -
245240 SR-631 F-A VS-3 5614-H-504 OH. 11, SPRING HANGER P1.20 N4311.00-E10205.00 245260 SR-631 IA C-C PT 5614-H-504 8H. 11, XNTEGRAL ATTACHMENT C3.20 N4311.00-E10205.00, Saddle 4
on bottom of pipe 245300 S"-SI-2408-12 PIPE TO ELBOW C-F-3 C9.99 PT 4
245400 8"-SI-2408-13 C-F-3 PT ELBOW TO PIPE C9.99 4
245500 Ot-5I-2408-14 PIPE TO ELBOW C-F-3 C9.99 PT 4
245600 8"-8I-2408-15 ELBOW TO VALVE MOV-4-B72 C-F-3 C9.99 PT 4 -
245650 MOV-4-872 No examination required VALVE 4
DATE: 04/15/04 REVISION:
TURKEY POINT -
UNIT 4 0
INSERVICZ INSPECTION LONG TERM PLAN CLASS 2 COMPONENTS PAGE: 408 RESIDUAL BEAT REMOVAL SY8TEN OUTSIDE CONTASISMNT 4-090 INSP2
SUMMARY
EXANINATION AREA NUMBEA IDE21TIFICATZON 245700 S8-S1-2408-16 VALVE MOV-4-872 TO ELBOW ECTION INTERVALV As=E SEC. XI CATEGY NDE ITEM NO METH PLAN STATUS FIRST ISECOND THIRD PERIOD PERIOD PERIOD UT AG E -
1 2 3
-1 2
3 1 2 3
INSTRUCTIONS
- CALIBRATION BLOCK"
- '*tT-41**
'T I
4 -
245740 SA-532 SPRING HANGER VT-3 II 5614-H-504 SB. 12, N4311.00-E1019B.17 F1.20 4-245760 SR-632 XA INTEGRAL ATTACHMENT C-C C3.20 PT 5614-H-504 OH. 12, N4311.00-Z10198.17, On-attachbmnt 4 -
245800 81-SI-2408-19 ELBOW TO PIPE C-F-1 CS.11 PT UT
- UT-41**
.4-245900 8"-SI-2408-17 PIPE TO ELBOW C-F-1 PT CS.11 UT
- UT-41"*
4-X 246100 8'-SI-2408-18 ELBOW TO PIPE C-F-1 PT C5.11 UT
- UT-41**
4-
DATE: 04/15/04 TURXEY POINT - UNIT 4 PAGE: 409 REVISION:
0 INSERVICB INSPECTION LONG TERM PLPN CLASS 2 COMPONENTS RESIDUAL KXAT REMOVAL SYSTEM OUTSIDE CONTAINMENT INSPECTION NVAIR..
PLAN STATUS ASME FIRST SECOND THIRD SEC. XI PERIOD PERIOD PERIOD
SUMMARY
- - - - O Z -
INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3
1 2 3
1 2 3
"CCALIBRATION BLOCKI" (RZF. DWG.
NO. 5614-P-504-8 SR. 2) 247300 80-SI-2409-1 C-F-3 PT VALVE 4-863A TO ELBOW C9.99 247400 8"-SI-2409-2 C-F-3 PT ELBOW TO PIPE C9.99 247450 8R-633 P-A VT-3 5614-H-504 S8. 5, DOUBLE ACTING F1.20 N4289.50-E10241.42 RESTRARIN 4
247455 SR-633 ZA C-C PT 5614-H-504 SH. 5, INTEGRAL ATTACH)MET C3.20 N4289.50-B10241.42, Three attachments 247500 9"-SI-2409-3 C-P-3 PT PIPE TO TEE C9.99 4
247600 8"-SI-2409-4 C-F-3 PT TEE TO VALVE 4-863B C9.99 247700 89-BI-2409-5 C-P-3 PT TEE TO PIPE C9.99 247800 9w-0I-2409-6 C-F-3 PT PIPE TO TEE C9.99 4- -
DATE: 04/15104 REVISION:
0 TURKEg POINT - UNIT 4 PAGE: 410 INSERVICE INSPECTION LONG TERM PLAN CLA8S 2 COMPONENT8 RESIDUAL MEPT RPMOVAL SYSTEM OUTSIDE CONTAINMENT 4-091 INSPECTION INTERVLLA ASME
. SEC. XI
SUMMARY
EXAMINATION AREA CATEGY NDE NUMBER IDENTIFICATION ITEM NO METH 247900 8"-8I-2409-7 C-F-3 PT TEE TO PIPE C9.99 PLAN STATUS SECOND I.
INSTRUCTIONS
- CALIBRATION BLOCK" I
4-248000 8"-SI-2409-0 C-F-3 PT 4
PIPE TO ELBOW C9,99 4 -
II 248100 9"-SI-2409-9 C-F-3 PT ELBOW TO vALVE C9.99 4-10-8B7 4
248150 4-10-887 No examination required VALVE 4 -
248200 8"-SI-2409-10 C-F-3 PT VALVE 4-10-887 TO C9.99 4
DATE: 04/15/04 REVISION:
0 TURKEY POINT - UNIT 4 IN8ERVICE INSPECTION LONG TERM PLAN CLASS 2 COMPONENTS PAGE: 413 SAFETY INJECTION PUMP B SUCTION i 4-093 INSPECTION INTERVAL_
PLAN STATUS ASME SEC. XI
SUMMARY
EXAMINATION AREA CATEGY ND NUMBER IDENTIFICATION ITEM NO HE (REF. DWG.
NO.
5614-P-502-S OH. 4)
DE CTH FIRST SECOND PERIOD PERIOD
-O U T A G E 1
2 3 1
2 3 THIRD PERIOD 1
2 3 INSTRUCTIONS
- CALlBRXTION DLOCK**
249200 6*-0I-2402-1 TEE TO PIPE C-F-3 C9.99 PT 4
249240 6"-s1-2402-ILD LONQITUDWNAL SEAM WELD PT 4 -
249260 6"-SI-2402-2LU LONGITUDINAL SEAM WELD PT 4- -
249300 6"-SI-2402-2 PIPE TO ELMOW C-F-3 C9.99 PT 4
249400 6'-SI-2402-3 ELBOW TO PIPE C-F-3 C9 99 PT 4 -
249440 6"-SI-2402-3LD LONGITUDINAL SEAM WELD PT 4-249460 6"-8I-2402-4LU LONGITUDINAL SEAM WELD PT 4 -
249500 6"-SI-2402-4 PIPE TO VALVE 4-886D C-F-3 C9.99 PT 4-
DATE: 04/15/04 REVISION:
TURXEY POINT - UNIT 4 INSERVICE INSPECTION LONG TERM PLAN CLA8S 2 COMPONSNTS PAGE: 414 0
SAFETY INJECTION PUMP B SUCTION-4-093 INSPECTION XNTERVALr.
A8ME
. SEC. XI SUMMWRY XMAWAnTION AREA CATEGY NDE NUMBE IDENTIFICATION ITDE NO METH 249550 4-866D VALVE PLAN STATUS FIRST SECOND PERIOD PERIOD
-O U T A G E 1
2 3
- 1 2 3
THIRD
- PERIOD, 1
2 3 INSTRUCTIONS "CALIBRATION 3BL0C**
I 4 -
249600 6"-01-2402-5 C-F-3 VALVE 4-686D TO ELBOW C9,99 PT I,
4 249700 6"-SI-2402-6 ELBOW TO REDUCER C-P-3 C9.99 PT 4-
DXTE: 04/15/04 REVISION:
0 TURKEY POINT - UNIT 4 INSERVICE INSPECTION LONG TERM PLAN CLASS 2 COMPONENTS PAGE: 415 RESIDUAL MEAT REMOVAL SYSTEM TOI RFUELING CANAL 4-094 INSPECTION INIREVAL..
PLAN STATUS ASME S
SEC. XI CATEGr ITEM NO NDE METH.
FIRST SECOND PERIOD PERIOD O
U T A G E 1 2 3 1
2 3 THIRD PERIOD 1 2 3 INSTRUCTIONS "CALIBRATION BLOCK"*
SUMMARY
EXAMINATION AREA NUMBER IDENTIFICATION (REP. DWQ.
NO. 5614-P-575-S SH. 1) 249900 6"-BI-2403-1 TEE TO PIPE C-F-3 C9.99 PT 4 -
250000 6"-BI-2403-2 PIPE TO ELBOW C-F-3 C9.99 PT II 4-250100 61-SI-2403-3 ELBOW TO PIPE C-F-3 C9.99 PT 4-250150 4-ACH-95 DOUBLE ACTING RESTRAINT F-A P1.20 VT-3 5614-H-575 SH. 8, N4306.01-E10188.e4 4
250200 6"-SI-2403-4 PIPE TO ELBOW C-F-3 C9.99 PT 4-250300 61-8I-2403-5 ELBOW TO PIPE C-F-3 C9.99 PT 4
250400 6"-81-2403-6 PIPE TO PIPE C-F-3 C9.99 PT 4-250450 4-ACH-94 DOUBLE ACTING RESTRAINT F-A F1.20 VT-3 5614-H-575 SH. 7, N4294.76-E10193.38 4-
DATE: 04/15/04 PEVISION:
0 TURIX POINT - UNIT 4 INSERVICE INSPECTION LONG TERM PLAN CLASS 2 COMFONENTS RESIDUAL HEAT REMOVAL SYSTEM TO REFUELING CANAL 4-094 PAGE: 416 INSTRUCTIONS
- CALIBRATION BLDCRK-
- SVMMARY EXAMINATION AREA NUMBER IDENTIFICATION 250500 6-SI-2403-7 PIPE TO ELBOW INSPECTION. INrERVAL_
ASME SEC. XI CATEGY NDE 1TEM NO FETH C-F-3 PT C9.99 PLAN STATUS FIRST SECOND THIRD PERIOD PERIOD PERIOD T AG E --
1 2 3 1
2 3 1
2 3
4 -
250600 6"-SI-2403-8 C-F-3 PT ELBOW TO ELBOW C9.99 4
250700 6"-8I-2403-9 C-F-3 PT ELBOW TO PIPE C9.99 4 -
___________________________________________________________4_____________________________________
250740 4-ACH-93 F-A VT-3 5614-H-575 SH. 6, DOUBLE ACTING F1.20 N4288.05-Z10191.55 RESTRAINT 4
250760 4-ACH-92 F-A VT-3 5614-H-575 SH. 5, DOUBLE ACTING F1.20 N4288.05-E10177.84 RESTRAINT 4
4 250800 60-81-2403-10 C-F-3 PS PIPE TO ELBOW C9.99-250900 6"-8I-2403-11 C-F-3 PT ELBOW TO PIPE C9.99 4---------
250950 4-ACH-91 F-A VT-3 5614-H-575 SH. 4, DOUBLE ACTING F1.20 N4286.B8-E10169.09 RESTRAINT 4
DATE: 04/15/04 TURXY POINT - UNIT 4 PAGE: 417 REVISION:
0 INSERVICE INSPECTION LONG TERM PLAN CLASS 2 COMPONENTS REBIDUAL HEAT REMOVAL SYSTEM TO REFUELING CLNAL 4-094 INSPECTION INTERVAL_
PLAN STATUS I
I ASEFsR8T SECOND THIRDl SEC. XI PERIOD PERIOD PERIOD
SUMMARY
EXAMINATION AREA CATEGY NDE 0
A E ---
INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3
1 2
3 1
2 3
- CA?.BRTION BWC.C" 251000 6'-BI-2403-12 C-F-3 PT PIPE TO PIPE C9.99 4 -
___________________________________________________________4_____________________________________
251100 6"-SI-2403-13 C-F-3 PT 4
PIPE TO ELBOW C9..99 II 4 -
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _,_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __4 _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
251200 6"-SI-2403-14 C-F-3 PT ELBOW TO PIPE C9.99 251230 4-ACH-90 P-A VT-3 5614-H-575 SH. 3, DOUBLE ACTING F1.20 N4268.55-E10170.76 RESTRAINT 4
251250 4-ACH-89 F-A VT-3 5614-H-575 SH. 2, DOUBLE ACTING F1.20 N4268.55-E10182.76 RESTRAINT 4
251270 4-ACH-88 P-A YJT-3 5614-H-575 SR. 11, ANCHOR 11.20 N4268.55-EI0199.43 4 -
251300 6"-SI-2403-15 C-F-3 PT PIPE TO ELBOW C9.99 251400 6"-SI-2403-16 C-7-3 PT ELBOW TO PIPE C9.99 4-
DATE: 04/15/04 REVISION:
0 TURKEY POINT - UNIT 4 INSERVICE INSPECTION LONa TERM PLAN CLASS 2 COMPONESTS PAGE: 418 RESIDUAL HEAT RZMOVXL 8YSTEM TO REFUELINO CANAL 4-094 SUMYARY EXAMINATION AREA NUMBER IDENTIFZCA)TION 251500 6"-0I-2403-17 PIPE TO PIPE INSPECTION INTERVAL_
SEC. XI CATEGY NDE ITEM NO METH C-F-3 PT C9.99 FIRST PERIOD O
1 2 3 SECOND THIRD PERIOD PERIOD U T A a E -
INSTRUCTIONS 1
2 3
1 2
3
- CALIBRATION BLOCK" PLAN STATUS I
4 -
251550 4-ACH-96 DOUBLE ACTING RESTRASr F-A F1.20 VT-3 5614-H-575 SH. 1, N4268.55-E10200.76 4-251600 6"-SI-2403-10 PIPE TO rELOW C-7-3 C9.99 PT 4-251700 6"-SI-2403-19 ELBOW TO PIPE C-F-3 C9.99 PT 4 -
I 251750 4-ACH-97 F-A VT-3 5614-H-575 OH. 10, SPRING HANGER F1.20 N4268.55-E10202.30.
4 -
251800 6"-SI-2403-20 PIPE TO ELBOW C-F-3 C9.99 PT 4-251900 6"-SI-2403-21 ELBOW TO VALVE 4-734 C-F-3 C9.99 PT 4-252000 4-734 VALVE No cxamination required 4-
DATE: 04/15/04 TURKEY POINT -
UNIT 4 PAGZ: 419 REVISION:
0 INSERVICE INSPECTION LONG TERM PLAN CLASS 2 COMPONENTS CONTAINMENT SPRAY PUMP A DISCHARGE
'4-095 INSPECTION. INTERVAL PLAN STATUS A8ME FIRST SECOND THIRD SEC. xi PERIOD PERIOD PERIOD SUMMMY EXAMINTION AREA CATEGY NDE
- 0 U T A F E
-- -NTRUCION NUMBER IDENTIFICATION XTEM NO METH 1
2 3
1 2
3 1
2 3
- 'CALIBRATION BWLOC*
(RE.
DWG. NO. 5614-P-510-S SH. 1) 253100 6"-CS-2401-1 C-F-3 PT PUMP FLANGE TO ELBOW C9.99 4
___________________________________________________________4_____________________________________
253200 6"-CS-2401-2 C-F-3 PT ELBOW TO ELBOW C9.99 253300 6"-CS-2401-3 C-F-3 PT ELBOW TO PIPE C9.99 4 -
253350 SR-653 F-A VT-3 5614-H-510 8H.
4, SPRING HANGER F1.20 N4326.50-E10214.25 4
253360 4-8R-653 IA C-C PT 5614-H-510 OH. 4, INTEGRAL ATTACHMENT C3.20 N4326.50-10214.25, One attac1ment 4
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __4 _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _r_ _ _ _ _ _ _ _
253400 6"-CS-2401-4 C-F-3 PT PIPE TO VALVE C9.99 MOV-4-860A 4
253450 MOV-4-880A VALVE 4
253500 61-CS-2401-5 C-F-3 PT VALVE MOV-4-880oa TO C9.99 ELBOW 4
DATE: 04/15/04 REVISION:
0 TURKEY POINT - UNIT 4 INSERVICZ INSPECTION LONG TERM PLAN CLAS 2 COMPONENrS PAGE: 423 CONTAINMENT SPRAY PUMP B DISCHARGE 4-096 INSPECTION InTERAL_
PLAN STATUS ASME SEC. xi CATEGY
.ITEM NO FIRST SECOND PERIOD PERIOD NDZ OUTAGE MZTH 1 2 3 1 2 3 THIRD PERIOD 1 2 3
.SUMMlARY MXAMINATION AREII MM=DE ZDETIFIC&TION
- INSTRUCTIONS t**CRLIMTXON BWOCK**
I-(RZF.
DVW. NO. 5614-P-Sl1-8 OH. 1) 255000 6w-CS-2402-lA C-F-3 PT FLNGE TO REDUCING C9.99 ELBOW 255050 6"-CS-2402-1 REDVCING ELBOW TO ELBOW C-F-3 C9.99 4 -
255100 6"-CS-2402-2 ELBOW TO PIPE C-F-3 C9.99 PT 4 -
255140 8R-652 F-A VS-3 5614-H-511 OH. 6, SPRING HANGER 71.20 N4333.94-810210.72 255160 SR-652 IA C-C PT 5614-H-511 SH. 6, INTEGRAL ATTACHMENT C3.20 N4333.94-El0210.72, On&
attachment 235200 6"-CS-2402-3 PIPE TO VXLVE 4-S80B C-F-3 C9.99 PT 4 -
255250 4-8803 VALVE No examiantion required 4
255300 6"-CS-2402-4 VALVE 4-880B TO PIPE C-F-3 C9.99 PT 4-
DATE: 04/15/04 REVISION:
0 TURKEY POINT -
UNIT 4 INSERVICE INSPECTION LONG TERM PLAN CLASS 2 COMPONENTS PAGE: 424 CONTAINMENT SPRAY PUMP 3 DISCHARGE, 4-096 INSPECTION INTERVAL_
PLAN STATUS ASKS SEC. XI CATEGY ITEM NO FIRST SECOND THIRD PERIOD PERIOD
- PERIOD, NDS
- -O UTA E -
METH 1 2 3 1 2 3
1 2 3
SUMMA.RY E7AMIINATION AREA NUMBER IDENIFICATION INSTRUCTIONS
- "CALIBRATION BLOCK" 255400 6"-CS-2402-5 PIPE TO VALVE 4-890B-C-P-3 C9.99 PT 4
255450 4-990B VALVE No examination required
.4 II 4
255500 6"-CB-2402-6 VALVE 4-890B TO PIPE C-F-3 C9.99 PT 4
255600 6"-CO-2402-7 PIPE TO ELBOW C-F-3 C9.99 PT 4-255640 8R-651 DOUBLE ACTING RESTRAINT F-A F1.20 5614-H-511 OH.
5, U4339.50-R10210.72
. 4-255660 8R-651 IA C-C PT 5614-H-511 8H. 5, INTEGRAL ATTACHMENT C3.20 N4339.50-E10210.72, One 4 -attachment 255700 6"-CS-2402-8 C-F-3 ELBOW TO VALVE 4-8913 C9.99 PT 4
255750 4-8991 No examination required VALVE 4
DATE: 04/15/04 REVISION:
0 TURKEY POINT - UNIT 4 INSEVICE INSPECTION LONG TERM PLAN CLASS 2 COMPONENTS PAGE: 425 a
, N
- j CONTAINTr SPRAY PUMP 9 DISCHARGE 4-096 INSPECT Si
SUMMARY
EXAMINXTION AREA CA NUM9ER IDENTIFICATION Il ION NTERVAL.
ASME 6EC. Xi LTEGY IEH NO FIRST PERIOD NDE
- 0 METm 1
2 3
PLAN STATUS SECOND THIRD PERIOD PERIOD IU T A aGE-1 2 3 123 INSTRUCTIONS
- "CALIBRATION DLOC**
255800 6"-CS-2402-9 VALVE 4-891B TO PIPE C-F-3 C9.99 PT 4
255900 6"-CS-2402-10 PIPE TO ELBOW C-F-3 C9.99 PT 4 -
256000 6"-CS-2402-11 C-F-3 PT ELWOW TO PIPE C9.99 4--
256100 6"-CS-2402-12 PIPE TO ELBOW C-F-3 C9.99 PT 4
256200 6"-CS-2402-13 ELBOW TO PIPE C-P-3 C9.99 PT 4-256240 4-SIH-7 SINGLE ACTING RESTRAINT F-A F1.20 VT-3 5614-H-511 SH. 4, N4335.08-E16214.93 4-256250 SR-650 F-A VT-3 5614-H-51 SH. 3, DOUBLE ACTING 1.20 N4324.00-Z10214.93 RESTRAINT 4
256260 4-8IH-6 DOUBLE ACTING RESTRAINT F-A F1.20 VT-3 5614-H-511 OH. 2 and 5614-H-506 SH. 2, N4315.21-E10214.93 4
DATE: 04/15/04 REVISION:
0 TURKEY POINT - UNIT 4 INSERVICE IN8PECTION LONG TERM PLAN CAS8 2 COMPONENTS PAGE: 426 CONTAINMENT SPRAY PU1MP B DISCH1ARGE, 4-096 INSPECTION INTERVLL_
ASME SEC. XI CATEGY NDE ITEM NO METH PLAN STATUS FIRST SECOND THIRD 5UMMARY NUMBER 256300 EXAMINATION AREA IDENTIFICATION 6"-CB-2402-14 PIPE TO ELBOW 1 2 3
31 2 3
1 2
3 I
IN6TRUCTIONS "CALIBRATION BLOCK" C-F-3 C9.99 PT I
4-256400 60-CS-2402-15 C-Y-3 PT ELBOW TO PIPE C9,99 II 4-256500 6"-CS-2402-16 C-P-3 PT PIPE TO ELBOW C9.99 4
256600 6"-CS-2402-17 C-F-3 PT ELBOW TO PIPE C9.99 4
256700 6"-CS-2402-18 C-F-3 PT PIPE TO ELBOW C9.99 256725 6"-CS-2402-19 C-F-3 PT ELBOW TO PIPE C9.99 4-.
256750 4-SIH-5 F-A VT-3 5614-H-511 SH. 1, SINGLE ACTING F1.20 N4313.50-E10199.68 RESTRAINT 4
DATE: 04/15/04 REVISION:
0 TURKEY POINS - UNIT 4 PAGE: 427 INSERVICE IN8PECT5ON LONG TERM PLAN
'CLASS 2 COMPONENTS CONTAINMENT SPRAY PUMP B DISCHARGE X 4-096 INSPECTION INTERVAL_
ASME SEC. XI
SUMMARY
EXAMINATION AREA CATEGY NUMBER IDENTIFICATION ITEM NO (REY. DWG. NO. 5614-P-517-S SH.
NDE METH PLAN STATU8 FIRST SECOND THIRD PERIOD PERIOD PERIOD O V T A G E -
1 2
3 1
2 3 1
2 3 INSTRUCTIONS
- QLIBRATION BLOCK*"
256775 4-96-Al ANCHOR F-A F1.20 VT-3 5610-C-167, Detail 31 4 - -
256800 4-96-Al IA INTEGRAL ATTACHMENT C-C C3.20 PT II 5610-C-167, Detail 3 4 --
DATE: 04/15/04 PEVISION:
0 TURXEY POINT -
UNIT 4 INSERVICE INSPECTION LONG TERM PLAN CLASS 2 COMPONENTS PAGE: 428 HIGH HEAD SAFETY INJECTION OUTSIDE CONTAINSENT INSPECTION INTERVALt PLAN STATUS Al mEs:C. XI
'EGM
.2( NO FIRST SECOND PERIOD PERIOD NDE
--OUTAGE METH 1
2 3
1 2
3 THIRD PERIOD
- -NSTRUCTIONS 1
2 3
-- CALIDRATION ULOK**
SUMMARY
EXAMINATION AREA CAI NUMBER IDMIFICATION 1TI
-(REF. DWO.
NO.
5610-P-246) 256802 2"-SI-2401-1 BRANCH CONNECTION TO PIPE C-F-1 C5.30 PT 4-X 256003 2"-51-2401-2 PIPE TO ELBOW C-F-1 CS.30 PT 4-256804 2"-SI-2401-3 ELBOW TO PIPE C-F-1 C5.30 PT 4
256805 2-SI-2401-4 PIPE TO ELBOW C-F-1 C5.30 PT 4
256806 2"-S1-2401-5 ELBOW TO PIPE C-F-1 C5.30 PT 4 -
256807 2"-01-2401-6 PIPE TO VALVE 4-899S C-F-1 C5.30 PT 4 -
256808 4-B99S No examination required VALVE 4--
256809 2*-51-2401-7 VALVE 4-8998 TO PIPE C-F-1 C5.30 PT 4-
PAGE: 429 1
DATE: 04/15/04 REVISION:
0 TUR)= POINT -
UNIT 4
=SERVICE INSPECTION LONG TERM PLAN CLASS 2 CO0PW0NDT8 HIGH HEAD SAFETY INJECTION OYTSIDE CONTAINMZNT 4-097
\\
INSFECTION INTERVAL~
VSUMMARY
EXAMINATION AREA NUMBER IDENTIFICATION 256810 2"-SI-2401-8 PIPE TO VALVE 4-899T ASME SEC. XI CATEGY XTEH NO C-F-i C5.*30 PLAN STATUS FIRST SECOND PERIOD PERIOD
-o U T A G E -
1 2 3
1 2
3 THIRD PERIOD 1 2 3
-'CALIBRATION BLOCKX 4 -
256811 4-B99T VALVE No examinaetioni required 4
(REF.
DWG.
NO.
5614-P-572-S SH. 3) 256813 30-SI-2401-1 FLANGE TO ELBOW C-F-1 C5.21 PT
'UT
- UT-47**
4 -_
S 256814
- 3"-SI-2401-2 C-P-1 PT
- tJT-47**
ELBOW TO PIPE C5.21 UT 4 -
256815 3"-SI-2401-3 2" BRANCH CONNECTION C-F-1 C5.41 PT 4 -
X 256816 3"-0I-2401-4 PIPE TO VALVE 4-879C C-F-1 PT C5.21 UT
- UT-4709 4
256818 4-879C VALVE No examination required 4
256820 3--SI-2401-5 C-F-1 VALVE 4-879C TO VALVE C5.21 4'888C PT
- UT-47**
4-
DATE: 04/15/04 REVISION:
0 SURKEY POINT -
UNIT 4 PAGE: 430 INSERVICE INSPECTION LONG TERM PLAN CLASS 2 COMPONENTS HIGH HEAD SAFETY INJECTION OUTSIDE CONTAINMU 4-097 INSPECTION INTERVAL_
AgMS SEC. xi CATEGY NDE ITEM NO MZTH PLAN STATUS FIRST SECOND THIRD PERZOD PERIOD PERIOD
- OUTAGE--
1 2
3 1
2 3
1 2
3 SUMMQRY EIAMINSTION AREA NUMBER IDENSIPICATION 256822 4-888C VALVE SNSTRUCTIONs
- CALIERAITON BLOCK**
No wxamination required I
4-256824 3"-SI-2401-6 C-F-1 PT
- UT-47**
VALVE 4-888C TO ELBOW C5,21 UT 4 -
256828 3-SIH-56 F-A VT-3 5614-H-572 SH. 16, DOUBLE ACTING P1.20 N4381.78-E1029076 RESTRAINT 4X 256829 3-SIH-56 IA C-C PT 5614-H-572 SH. 16, INTEGRAL ATTACHMENT C3.20 N4381.78-E1029076, One attachment 256832 3"-SI-2401-7 C-F-1 PT
- UT-47**
ELBOW TO PIPE C5.21 US 4 -
256836 3"-SI-2401-8 C-F-1 PT
- UT-47**
PIPE TO REDUCER C5.21 UT 256840 4"-0I-2401-1 C-P-1 PT
- 'UT-48 / PSL-61-*
REDUCER TO TEE C5.21 UT 4
256844 41-SI-2401-2 C-F-i PT
- VT-48 / PSL-61-^
TEE TO PIPE C5.21 UT 4 -
DATE:.04/15/04 TURXEY POINT - VNIT 4 PAGE: 431 REVISION:
0 INSERVICE INSPECTION LONS TERM PLAN
'CLAS8 2 COMPONENTS HIGH HEAD SAFETY INJECTION OUTSIDE CONTAXNMENT 4-097 INSPECTION INTERVAL.
PLAN STATUS ASME FIRST SECOND THIRD SEC. Xi PERIOD PERIOD PERIOD.
SUMMARY
EXAMINATION AREA CATEGY NDE 0 U T A 0 E -
INSTRUCTIONS NUMBER IDENTIFICATION XTEM NO METH 1 2 3 1
2 3
1 2
3
- CALzBRATION BLOCK**
256848 4"-61-2401-3 C-F-1 PT
- UT-48 / PBL-61**
PIPE TO TEE C5.21 UT 4 -
256852 4"-0I-2401-4 C-F-1 PT
- UT-48 / PSL-61**
TSE TO PIPE C5.21 UT, 4 -
~---
~~~---
~---- r ---- -
~~~~~~~~
256856 4"-0I-2401-5 C-F-1 PT
- VT-48 / PSL-61**
PIPE TO ELBOW C5.21 UT 4 -
X-256860 4"-SI-2401-6 C-F-1 PT
- UT-48 / PSL-61**
ELBOW TO PIPE C5.21 UT 4
256864 3-SIH-60 P-A VT-3 5614-H-572 SH. 17, DOUBLE ACTING F1.20 N4376.73-EI10290.09 RESTRAINT 4 -
256868 4"-SI-2401-7 C-F-1 PT
- UT-48 / PSL-61"*
256872 4"-SI-2401-8 C-F-1 PT
- UT-48 / POL-61**
256876 3-SIH-61 P-A VT-3 5614-H-572 SH. 18, DOUBLE ACTING F1.20 N4376.73-EiO280.93 RESTRAI 4
X
DATE: 04/15/04 REVISION:
TURXEY POINT - UNIT 4 PAGE: 432 INSERVICE INSPECTION LONG TERM PLAN CLAUB 2 COMPONEN1S I
0 HIGH HEAD SAYETY INJECTION OUTSIDE CONTAXNMZNT 4-097
SUMMARY
ElAHrNATION AREA NUMBER IDENTIPICATION INSPECTION INTERVAI-ASME SEC. XI CATEQT NDE STEM NO METH C-F-I PT C5.21 UT FIRST PERIOD
- - - - C 1 2 3 PLAN STATUS SECOND THIRD PERIOD PERIOD DU T AG E --
1 2 3 1
2 3 INSTRUCTIONS
- CALiBRATION uLOX**
- UT-40 / P8L-61-4 256B80 41-8I-2401-9 PIPE TO ELBOW 4-_
256894 4"-0I-2401-10 C-F-i PT
- UT-48 / PBL-61**
ELBOW TO PIPE C5.21 UT 4 -_ -
256888 4"-SI-2401-11 C-F-1 PT
- -UT-48 PSL,61**
PIPE TO ELBOW C5.21 UT 4
256892 4"-SI-2401-12 C-F-1 PT
- -UT-48 / PSL-61**
ELMOW TO PIPE C5.21 UT 256896 4'-SI-2401-13 C-F-1 PT
- UT-48 / PSL-61**
PIPE TO ELBOW C5.21 UT 4
256900 4"-SI-2401-14 C-F-1 PT
- ^UT-48 POL-61**
ELBOW TO PIPE C5.21 UT 4
256904 8R-656 VT-3 5614-H-572 OH. 6 and 33, DOUBLE ACTING N4368.23-Ei10278.13, RESTRAINT 4
support is part of 8R-656 in Zone 4-097 256908 8R-660 F-A VT-3 5614-H-572 OH. 19, DOUBLE ACTING F1.20 N4361.73-E10278.13 RESTRAINT 4
DATE; 04/15/04 REVISION:
0 TURKZ POINT - UNIT 4 INSERVICE INSPECTION LONG TERM PLAN CLASS 2 COMPONENTS PAGE: 433 HIGH HEAD SAFETY INJECTION OUTSIDE CONTAINMENT 4-097 INSPECTION INTERVAL_
ABXZ
. SEC. XI SUMM"RT EXAM INITION AREA CATEGY NUMBER IDENTIFICATION ITEM NO 256912 4-8OH-59 F-A DOUBLE ACTING
- F1.20 RESTRAINT PLAN STATUS FRST SECOND PERIOD PERIOD OU T A E -
1 2
3 1
2 3
THIRD PERIOD I
NDE Vr-3 I
N INSTRUCTIONS 2 3
- CALIBRATION BLOCK" 5614-X-572 OH. 20, N4354.73-E10278.13 I
4 256916 4"-8I-2401-15 C-F-1 PT
- UT-48 / P6L,-61**
PIPE TO ELBOW C5.21 UT
,I 4
256920 4"-81-2401-16 ELBOW TO PIPE C-F-1 C5.21 PT
- UT.48 / PaSL-61"*
4 -
256924 4"-81-2401-17 PIPE TO ELBOW C-F-1 C5.21 PT UT
- 'UT-48 / P8L-61**
4-.--
I 256928 4"-81-2401-18 ELBOW TO PIPE C-F-1 PT C5.21 UT
- UT-48 / PSL-61**
4-256932 4-8SH-61 DOUBLE ACTING RESTRAINT F-A Fl.20 VT-3 5614-H-572 SH. 21, N4343.73-E10278.13 4
256936 4-8SH-62 DOUBLE ACTING RESTRAINT P-A F1.20 5614-H-572 8H. 22, N4329.65-E10278.13 4 -
_____2694__-___-_-______________________________________________C_____________-F-____________PL__
256940 41-8I1-2401-19 C-F-1 PT
-*tT-48 / P8L,61**
PIPE TO ELBOW C5.21 4
DATE: 04/15/04 REVISION:
TURXES POINT -
UNIT 4 PAGE: 434 0
INSERVICE INSPECTION LONG TERM PLAN CLASS 2 COMPONENTS HIGH HEAD SAFETY INJECTION OUTSIDE CONSAINMENT 4-097 INSPECTION INTERVAIL ASE SEC. XI CATEGY NDE ITEM NO METH PLAN STATUS FIRST SECOND THIRD PERIOD PERIOD PERIOD
-O U T A G E -
1 2 3
1 2 3
1 2
3
SUMMARY
EXAMINATION AREA NUMBER IDENTIFICATION 256944 4"-SI-2401-20 ELBOW TO PIPE
- 'CALIBRATION 3LC=**
- UT-48 / POL-61i'
_.4_-
4 -
_____2694___-____-_-__________-___________________________________________________-_______________
256948 4"-SI-2401-21 C-F-1 PT
-**UT-46 / POL,61**
PIPE TO ELBOW C5.21 UT 4-256952 4"-SI-2401-22 C-F-1 PT
- UT-48 / PSL-61**
ELBOW TO PIPE C5.21 UT 4 -
256956 4-SIH-63 VT-3 5614-H-572 SH. 17 and 23, DOUBLE ACTING N4324.65-E10274.13, RESTRAINT 4
Support is part of 3-SIH-60, earlier in
- Zon, 4-097 256960 4-SXH-64 F-A VT-3 5614-H-572 SH. 24, DOUBLE ACTING F1.20 N4324.65-E10260.21 RESTRAINT 256964 4-SIH-65 F-A VT-3 5614-H-572 SH. 25, DOUBLE ACTING F1.20 N4324.65-E10254.21 RESTRAINT 4
x 256968 4"-SI-2401-23 C-F-1 PT
- UT-48 / PSL-61**
PIPE TO ELBOW C5.21 UT 4-
DATE: 04/15/04 REVISION:
0 TsuRKY POINT -
UNIT 4 XNSERVICE INSPECTION LONG TERM PLAN CLASS 2 COMPONENTS
/1 HIGH HEAD SAFETY INJECTION OUTSIDE CONTAINMENT 4-097 INSPECTION INTERVAL ASME SEC. XI
SUMMARY
EXAMINATION AREA CATEGY NDE NUMBER IDENTIFICATION ITEM NO YESH 256972 4"-SI-2401-24 C-F-1 PT ELWBOW TO PIPE C5.21 UT FIRST PERIOD
-C 1
2 3 PLAN STATUS SECOND THIRD PERIOD PERIOD UTAGE-1 2 3 1
2 3
PAGE: 435 XNSTRUCTIONS
- "*LIDRATION BLOCK"
-"UT-49 / PSL-61"4 256976 4"-BI-2401-25 C-F-1 PT
- UT-48 / PSL-61**
PIPE TO ELBOW C5.21 Ur 4 -
256980 4"-0I-2401-26 C-F-1 PT
- UT-40 / PSL-61**
ELBOW TO PIPE Cs.21 UT 4-(REP. DWG. NO. 5614-P-572-S SH. 4) 257016
' 4-BIH-66
.F-.
VT-3 DOUBLE ACTING F1.20 RESTRAINT 5614-H-572 NH. 26, N4328.98-ER0244.38 I,
4 -
257020 4-SIH-32 F-A vT-3 5614-H-572 OH. 27, SINGLE ACTING F1.20 N4328.98-El0232.96 RESTRAINT 4
257024 4-SIH-31 F-A VT-3 5614-H-572 SH. 28, DOUBLE ACTING F1.20 N432.98-E10220.38 RESTRArNr 4
257028 4'-0I-2401-27 C-F-1 PT
- UT-40 / P6L-61**
PIPE TO ELBOW C5.21 UT 4
257032 4"-0I-2401-28 C-F-1 PT
- UT-48 / PSL-61*"
ELBOW TO PIPE C5.21 UT 4-
DATE: 04/15/04 REVISION:
0 TURXBY POIN - UNIT 4 PAGE: 436 INSERVICE INSPECTION LONG TERM PLAN CLASS 2 COMPONENTS HIGH HEAD SAFETY INJECTION OUTSIDE CONTAINMZNT 4-097 INSPECTION IwRmmAL_
ASME SEC. XI 8UMMARY EXAMINATION AREA CATEGY NDM NUMBER IDENTIFICATION ITEM NO MESH 257036 4"-SI-2401-29 C-F-1 PT PIPE TO ELBOW C5.21 UT FIRST PERIOD
-- 0 1 2 3 PLAN STATVS SECOND PERIOD U T A O E 1 2 3 THIRD PERIOD.
1 2 3 INSTRUCTIONS "CALIBRATION BLOCK**
- UT-48 / PSL-61" 4
257040 4'-OI-2401-30 C-F-1 PT 4
- UT-48 / POL ELBOW TO PIPE C5.21 UT 4 -
~~-----------------------~-r-~--~-------------------------~------------------~~~~~~~----
257044 8R-661 F-A VT-3 S614-H-572 SH. 29, DOUBLE ACTING F1.20 N4330.44-Z10201.55 RESTRAINT 4
257049 4"-SI-2401-31 C-F-1 PT
- UT-48 / PSL-61**
PIPE TO ELBOW C5.21 UT 4 -
257052 4--SI-2401-32 C-F-1 PT
- UT-4s / PSL-61**
ELBOW TO ELBOW C5.21 UT 257056 SR-662 P-A VT-3 5614-H-572 SH. 30, DOUBLE ACTING P1.20 N4330.44-ZIO200.05 RESTRAINT 4
257060 40-SI-2401-33 C-F-1 PT
- UT-48 / POL-61**
ELBOW TO PIPE C5.21 VT 257064 4"-SI-2401-34 C-P-1 PT
- UT-48 / PSL-61**
PIPE TO PIPE C5.21 UT 4 -
DATE: 04/15/04 REVISION:
0 TURKEX POINT - UNIT 4 PAGE: 437 NSXERVICE INSPECTION LONG TERM PLAN CLASS 2 COMPONENTS HIGH HEAD SAFErr INJECTION oUTSIDE CONTAXNMENT
- A-0g7 I
SUMMaRY EXAMINATION AREA NUMBER IDENTIFICATION 257068 4"-BI-2401-35 PIPE TO ELBOW INSPECTION INTERVAL ASME 8EC. XI CATEGY NDE ITEM NO METH C-F-l PT C cs.21 UT FIRST PERIOD
-- 0 1
2 3 PLAN STATUE SECOND PERIOD U S A 3 E 1
2 3 THIRD PERIOD.
1 2
3 INSTRUCTIONS
- CAIMTSON SLOC(**
- UT-48 / PBL-61**"
1 4 x 257072 4"-0I-2401-36 C-F-1 PT 4
- UT-48 / PSL-61**
ELBOW TO PIPE C5.21 UT 257076 4"-SI-2401-37 C-F-1 PT
- UT-48 / PSL-61**
PIPE TO ELBOW C5.21 uT 4
257080 4"-SI-2401-38 C-F-i PT
- UT-48 / POL-61-*
PIPE TO VALVE 4-867 C5.21 UT 257082 MOV-4-867 No examhnation required, VALVE no valve body welds 4 -
257084 4"-sI-2401-39 C-F-l PT
- UT-48 / P8,-61**
VALVE MOV-4-867 TO CS.21 UT PIPE 4
257086 sR-664 F-A VT-3 3614-H-572 sH. 34 DOUBLE ACTING FP.20 RESTRAINT 257098 4"-SX-2401-40 C-F-l PT
- UT-4s / PS-61**
DATE: 04/15/04 REVISION:
0 TURXZY POIN?
- UNIT 4 INSERVICE INSPECTION L4N TSERM PLAN CLASS 2 COMPONENTS HIGH HEAD SAFETY INJECTION OUTSIDE CONTAINMSNS A-no, PAGE1: 438 INSTRUCTIONS
"'CAX.NBR1TION BLXOnK**
i*'UT-48 / POL-61*4
.INSPECTION INTERVAL_
AimE SEC. XI CIATEGY NDE ITEM NO METH PLAN STATUS FIRST SECOND THIRD PERIOD PERIOD PERIOD OUTAGa 1 2 3 1
2 3 1
2 3 SUMMA~RY EXAMNA~TION 1.REA NUMBER IDENTIFICATION 257092 4"-81-2401-41 ELBOW TO PIPE C-F-i PT C5.21 UT 4 -
257096 4"-0I-2401-42 C-F-1 PT
-*UT-46 / PSL,61**
PIPE TO ELBOW C5.21 UT 4
257100 4"-SX-2401-43 C-F-1 PT
- UT-48 / PBL-61^>
ELBOW TO PIPE C5.21 UT 4 ---------
(REF. DWO. NO. 5614-P-783-8 SH. 1) 257104 4"-8I-2401-44 PIPE TO ELBOW C-F-1 PT
- UT-45, UT-44-*
C5.21 UT 4 -
2 5 C -
PT 257108 41-01-2401-45 C-F-1 PS
- !VT-45**
PIPE TO TER C5.21 UT 257116 4"-0I-2401-47 C-F-1 PT
- UT-45**
TEE TO PIPE C5.21 UT 4
257118 8081-H-003-08 F-A VT-3 5614-H-783 OH. 7, DOUBLE ACTING F1.20 N4339.50-EI0206.58 RESTRAINT 4
DATE: 04/15/04 REVISION:
0 TURXZY POINT - UNIT 4 IN8EVICE INSPECTION LONO TSRM PLAN cLaSS 2 COMPONENTS HIGH HEAD SAFETY INJECTION OUTSIDE CONTAInauT 4-097
- SUMOMARY NUMBE 257120 EIAMINATION ARPEA, IDE2NTIFICATION 40-SI-2401-48 PIPE TO ELDOW INSPECTION INTERVXL ANN SEC. XI CATEGY NDE
,ITEM NO METH C-F-1 PT C5.21 UT MIEST PERIOD C
1 2 3 PLYN STATUS SECOND THIRD PERIOD PERIOD D UX
-A G B --
1 2 3 1
2 3 PAGE: 439 INSTRUCTIONS
- CALIBRTION BLOCK"
- UT-45**I 4 -
257124 4"-SI-2401-49 C-F-1 PT
- UT-45**
EL9OW TO VALVE MOV-4-843A C5.21 UT 4-257126 MoV-4-843A No examination required VALVE 257128 4"-SI-2401-50 C-F-1 PT
- UT-45**
VALVE MaV-4-843A To C5.21 UT ELBOW 4
257132 4"-SI-2401-51 C-P-1 PT
- UT-45**
ELBOW TO PIPE C5.21
'UT 4-257136 8081-H-003-06 F-A VT-3 5614-H-783.8H.
6, DOUBLE ACTING F1.20 N4336.74-E10207.02 RESTRAINT 4
257137 8081-H-003-06 IA C-C PT 5614-H-783 NH.
6, INTEGRAL ATTACHMENT C3.20 N4336.74-E10207.02, one attachment 257140 4"-SI-2401-52 C-F-1 PT 2"
BRANCH CONNECTION C5.41 4-X
-