Information Notice 2005-09, Official Exhibit - ENT000527-00-BD01 - NRC Information Notice 2005-09, Indications in Thermally Treated Alloy 600 Steam Generator Tubes and Tube-to Tubesheet Welds (Apr. 7, 2005)

From kanterella
Jump to navigation Jump to search
Official Exhibit - ENT000527-00-BD01 - NRC Information Notice 2005-09, Indications in Thermally Treated Alloy 600 Steam Generator Tubes and Tube-to Tubesheet Welds (Apr. 7, 2005)
ML12340A713
Person / Time
Site: Indian Point  Entergy icon.png
Issue date: 04/07/2005
From: Hilland P
Division of Inspection and Regional Support
To:
Atomic Safety and Licensing Board Panel
SECY RAS
References
RAS 23330, 50-247-LR, 50-286-LR, ASLBP 07-858-03-LR-BD01
Download: ML12340A713 (7)


United States Nuclear Regulatory Commission Official Hearing Exhibit

Entergy Nuclear Operations, Inc.

In the Matter of:

(Indian Point Nuclear Generating Units 2 and 3)

ASLBP #: 07-858-03-LR-BD01 ENT000527 Docket #: 05000247 l 05000286 Submitted: August 20, 2012 Exhibit #: ENT000527-00-BD01 Identified: 10/15/2012 Admitted: 10/15/2012 Withdrawn:

Rejected: Stricken:

Other:

UNITED STATES

NUCLEAR REGULATORY COMMISSION

OFFICE OF NUCLEAR REACTOR REGULATION

WASHINGTON, D.C. 20555 April 7, 2005 NRC INFORMATION NOTICE 2005-09: INDICATIONS IN THERMALLY TREATED ALLOY

600 STEAM GENERATOR TUBES AND TUBE-

TO-TUBESHEET WELDS

ADDRESSEES

All holders of operating licenses for pressurized-water reactors (PWRs), except those who have

permanently ceased operations and have certified that fuel has been permanently removed

from the reactor vessel.

PURPOSE

The U.S. Nuclear Regulatory Commission (NRC) is issuing this information notice to inform

addressees about recent operating experience with degradation in steam generator tubes and

tube-to-tubesheet welds. It is expected that recipients will review the information for

applicability to their facilities and consider actions, as appropriate, to avoid similar problems.

However, suggestions contained in this information notice are not NRC requirements; therefore, no specific action or written response is required.

DESCRIPTION OF CIRCUMSTANCES

Catawba Nuclear Station, Unit 2, has four Westinghouse Model D5 recirculating steam

generators. Each steam generator has approximately 4,600 tubes fabricated from thermally

treated Alloy 600 (Figure 1). During fabrication of the steam generators, a portion of the U-

shaped tubes are inserted into a thick plate called a tubesheet. The tubesheet is approximately

21 inches thick and has two holes for each tube (one hole on the hot-leg side of the steam

generator and one hole on the cold-leg side). The lower end of the tubes were tack-expanded

into the tubesheet for approximately 0.70 inch (Figure 2). This tack expansion is performed to

facilitate welding of the tube to the primary side of the tubesheet. In the case of Catawba

Unit 2, this region is frequently referred to as the tack roll region since the tack expansion was

accomplished by mechanically rolling the tube into the tubesheet. The tack expansion forms a

temporary expansion transition (i.e., a roll transition in the case of Catawba). Following

welding, the tubes were hydraulically expanded for the full depth of the tubesheet. The

transition from the expanded portion of tube within the tubesheet to the unexpanded portion of

the tube at the top of the tubesheet is referred to as the expansion transition region of the tube.

In 2004, at Catawba Unit 2, Duke Energy (the licensee) conducted steam generator tube

inspections. At the time of the inspections, Catawba Unit 2 had operated for approximately

14.7 effective full-power years and the licensee had never identified any cracklike indications in

the steam generator tubes or welds.

As part of the inspection, the licensee planned to use a rotating probe to inspect approximately

25 percent of the tubes in each of the steam generators from 2 inches above the top of the

tubesheet to 9 inches below the top of the tubesheet. During the rotating probe examinations in

the tubesheet region in steam generator B, the licensee found three discrete circumferential

indications in an overexpanded region of one tube. Overexpanded regions such as this are

sometimes called bulges or tubesheet anomalies. These terms are used to distinguish

overexpanded regions of the tubes from regions that have been expanded above the top of the

tubesheet, which may also be referred to as overexpansions. The indications were located

approximately 7 inches below the top of the hot-leg tubesheet. The indications began from the

inside diameter of the tubes and are approximately 30 degrees in circumferential extent. The

overexpanded region extended for approximately 6 inches and the diameter was estimated to

be approximately 0.003 inch greater than the diameter observed in the remainder of the

expanded region. Overexpansions in the tubesheet region are a result of expanding the tube

into a region of the tubesheet which is not perfectly round. This out-of-round condition is the

result of anomalies introduced into the tubesheet during the drilling process (e.g., when the drill

bit wanders). As a result of identifying these circumferential indications, the licensee increased

the scope of the rotating probe examinations in the tubesheet region to include all tubes in all

four steam generators with overexpanded regions in the hot leg. The licensee inspected these

tubes from 2 inches above the top of the tubesheet to the tube end. A total of 1344 tubes in the

hot-leg tubesheet region of all four steam generators have overexpanded regions.

During these additional rotating probe examinations, no additional indications were found in the

overexpanded (bulged) regions; however, several indications were found at the tube ends

(tube-to-tubesheet weld) and one indication was found in the tack expansion region. At the

tube ends, the licensee identified approximately 12 indications in steam generators A, B, and D.

These indications were in the tube-to-tubesheet weld and were not visible during visual

inspections of the weld. The indication in the tack expansion (the region of the tube expanded

into the tubesheet to facilitate welding) was approximately 0.70 inch above the tube-to- tubesheet weld and was circumferentially oriented. It was estimated to be 330 degrees in

circumferential extent and 100 percent through-wall.

Based on these results, the licensee expanded the scope of the rotating probe examinations in

the tack expansion region to include 100 percent of the tubes in steam generator B and 20

percent of the tubes in steam generators A, C, and D. These tubes were inspected from the

tube end to approximately 2 inches above the tube end (which bounds the locations where the

tube end indications were identified).

In steam generator B, 9 tubes were found to have indications in the tack roll region. These

indications were circumferentially oriented and consisted of either single or multiple cracks. No

indications were found in the tack roll region in steam generators A, C, or D. In the tube-to- tubesheet weld region, 188 tubes in steam generator B, 1 tube in steam generator A, and

7 tubes in steam generator D contained indications in the tube-to-tubesheet weld. No

indications were found in the tube-to-tubesheet weld region in steam generator C. Six tubes in

steam generator B were identified with tube end (i.e., tube-to-tubesheet weld) indications that

extended into the tube material. The indications in these tubes were axially and

circumferentially oriented and consisted of either single or multiple cracks. The licensee plugged the tube with the circumferential indications in the overexpanded region

and the tubes with indications in the tack roll region. In addition, the licensee plugged the six

tubes with indications in the weld region that extended into the tube material.

BACKGROUND

In the U.S., only a few cracks (or cracklike indications) have been detected in steam generator

tubes fabricated from thermally treated Alloy 600. Prior to 2004, most (if not all) of these

indications occurred at two plants and were attributed to nonoptimal tube processing. These

cracklike indications occurred in the region of the tube where it passes through the tube support

plates. Additional information concerning this type of cracking is given in NRC Information

Notice 2002-21, Supplement 1, Axial Outside-Diameter Cracking Affecting Thermally Treated

Alloy 600 Steam Generator Tubing.

DISCUSSION

The findings at Catawba Unit 2 are noteworthy because they indicate that degradation can

potentially be occurring at various locations within the tubesheet region of thermally treated

Alloy 600 tubes. The findings are also noteworthy because potential cracklike indications were

first found in manufacturing anomalies (e.g., bulges or tubesheet anomalies) rather than at

other tube locations such as the expansion transition or U-bend region. Historically, rotating

probe inspections have focused on the expansion transition region on the hot-leg side and the

U-bend region of tubes with short-bend radii. Inspections focused on these areas due to the

high operating temperature and residual stress in these regions. The recent experience at

Catawba shows the importance of monitoring all tube locations (such as bulges, dents, dings, and other anomalies from the manufacture of the steam generators) with techniques capable of

finding potential forms of degradation that may be occurring at these locations (refer to Generic

Letter 2004-001, Requirements for Steam Generator Tube Inspections). The Catawba

experience also highlights the need to inspect all regions with high residual stress. Such

inspections will provide added assurance that any degradation at these locations will be

promptly detected.

The inspection of the tube-to-tubesheet weld and the repair of any indications detected in these

welds are not governed by the surveillance requirements in the Catawba Unit 2 technical

specifications. However, indications in the parent tube adjacent to the tube-to-tubesheet weld

are governed by the plant technical specifications. Since the weld is designed at many plants

to serve as part of the reactor coolant pressure boundary (i.e., it is a structural weld), the

findings at Catawba illustrate the importance of inspecting the parent tube adjacent to the weld

and the weld itself for degradation. Evaluating the results of these inspections is important for

verifying the weld and the parent tube will continue to satisfy its design basis. Alternatively, redefining the reactor coolant pressure boundary using a different method of evaluation for the

tube-to-tubesheet joint may demonstrate that degradation in this region is not safety significant.

Recent steam generator tube leaks at several plants with thermally treated Alloy 600 or Alloy

690 tubing (H.B. Robinson, Palo Verde, Shearon Harris) also show the need for thorough inspections and robust inservice inspection programs regardless of the tube material or steam

generator history. Information Notices 2004-17, Loose Part Detection and Computerized Eddy

Current Data Analysis in Steam Generators, and 2004-16, Tube Leakage Due to a Fabrication

Flaw in a Replacement Steam Generator, provide additional details on some of these leakage

events. Although corrosion-related degradation in plants with thermally treated tubing has been

minimal, the recent operating experience at plants with thermally treated steam generator tubes

indicates that damage by loose parts or damage incurred during manufacture of steam

generator tubes can result in primary-to-secondary system leakage. This experience also

shows the importance of being alert to all potential tube degradation mechanisms and to

aggressively examine eddy current inspection signals that may be associated with tube

degradation.

CONTACT

S

This information notice requires no specific action or written response. Please direct any

questions about this matter to the technical contact listed below or the appropriate Office of

Nuclear Reactor Regulation (NRR) project manager.

/RA/

Patrick L. Hiland, Chief

Reactor Operations Branch

Division of Inspection Program Management

Office of Nuclear Reactor Regulation

Technical Contact:

Kenneth J. Karwoski, NRR

301-415-2752 E-mail: kjk1@nrc.gov

Attachments: 1. PWR Recirculating Steam Generator Figure 1

2. Tube Installed in the Tubesheet Figure 2 Note: NRC generic communications may be found on the NRC public Web site, http://www.nrc.gov, under Electronic Reading Room/Document Collections.

ML050530400

OFFICE OES:IROB:DIPM TECH EDITOR EMCB:DE SC:EMCB:DE C:EMCB:DE

NAME OTabatabai PKleene KKarwoski ALLund WHBateman

DATE 04/05/2005 02/23/2005 03/07/2005 03/16/2005 03/17/2005 OFFICE D:DE OES:IROB:DIPM C:IROB:DIPM

NAME MMayfield/CG for/ EJBenner PLHiland

DATE 03/23/2005 04/06/2005 04/07/2005

IN 2005-09 Attachment 1 Steam outtet

Steam

separators

Feedwate r inlet

U-bend portion

of tube

Downcomer annulus

Tube bundle

Tube supports

Tube sheet

Primary inlet Primary outlet

(Hot Leg) (Cold Leg)

PWR Recirculating Steam Generator

Figure 1

IN 2005-09 Attachment 2 I Tube Installed in the Tubesheet I

I Tube I I Expansion Transition I

ITop of Tubesheet I

ITubesheet I

I Not to Scale

Figure 2