Notice of Violation from Insp on 850901-1004.Violation Noted:On 850831,Centrifugal Charging Pump a Inoperable for 97 H W/O Implementation of Action Statement & on 850930, Worker Entered Controlled Area W/O Protective Clothing
ML20138N454
Person / Time
Site: Wolf Creek, 05000901 Wolf Creek Nuclear Operating Corporation icon.png
Issue date: 12/18/1985
From: Martin R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To:
Shared Package
ML20138N451 List:
References
50-482-85-35, EA-85-127, NUDOCS 8512240006
Download: ML20138N454 (4)


Text

,,

_ _ _

,

- _ - ___ _ _ _ - - _

x.

_

~

s.

~

, p e.? >

y.

_

,'

,

- -

,

.

,

,

x

<

-

%j, '

,

'

'

  1. v c

NOTICE 0F VIOLATION'

y

~$

-

,

'

.

.

~

,

I u/ I.

v lKansasGasLandElectricCompany_

Docket No. 50-482:

'

.

~

m1

~ < Wolf Creek Generating Station License No.~ NPF-42~

'

-

EA 85-127:

' *

-,

,

.g, y 3 y

q

,

,

-]

'

!,

, i

'

e period September 1 through.

._

..

,

i

.During'an'N'RC inspection conducted d'uring.th'

'

NV

~ ;0ctober 4/.1985,afive violations of.NRC. requirements were identified. The most-

',

1significant violation. involved the failure to adhere to~ technical specification n

requirements regarding operable emergency core cooling systems.

In accordance Lwith'the " General' Statement'of Policy and Procedure for NRC Enforcement Actions,"

~

z 310CFRPart-2,AppendixC(1985),theviolations.arelistedbelow:

,

,

,

JA.

tTechnical Specification 3.5.2 requires that "two' independent emergency.

? core cooling systems (ECCSs) subsystems shall be operable with each'

>

>

,

subsystem comprised.of:

La..

OneLoperable centrifugal charging pumpo r

y J

,'

b.

One operab1'e safety' injection pump,

.

c..

-One operable RHR heat exchanger.

,

, di One operable RHR pump, Land

[

,

'e.

AnLoperable flow path capable...."

'

The' action statement for Tech'nical Specification 3.5.2 states:

"with'

l

~

'

'

-

Ione ECCS subsystem inoperable, restore thel inoperable subsystem to operable

<

status within 72-hours or be!in at least hot. standby.within the next '

,

q.i6' hours.and in. hot shutdown within the following 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />."

,

,

,

C'ontrary to th'e above, on August:31,'1985 !it was determined that centrifugal

~

'

, charging pump A.had.been inoperable for 97 hours0.00112 days <br />0.0269 hours <br />1.603836e-4 weeks <br />3.69085e-5 months <br /> without the required action

'

statement being1 implemented.,

~

p

.

'

This.is a Severity Level III Tiolation (Supplement I).

'

.

.B.,

10 CFR Part 50, Appendix-B, Criterion V states:. " Activities affecting quality shall be' prescribed by documented instructions, procedures, or

.

drawings'... and_shall be accomplished in accordance with these

,

instructions, procedures, or drawings...."

.

l Administrative Procedure (ADM)03-101, Revision 4. " Radiation Work Permit

!

'

Program," has been established in accordance'with 10 CFR Part 50,

!

,

i Appendix B.-Criterion V and Section 3.5 states,'in part. "Each individual

_using a radiation work permit (RWP) is responsible to. comply with this

. procedure and applicable instructions from the health physics group."'

j

'

,

l s.i

_d

.

-

!

.

.

.

.

_

W.

e

,

. -.

-

.,

,

..

;

,

-

,m

,

~ -

o

+- m

..

w v.g

.y,

'

,

,

,

w J'-

n.-

..... _n

i

'

'qNotice of Violation-

-

-2-

,

j

^

'

-

~

n

.

-

.

l. 4 "

'

u

~

~

/

iContrary~to{ theta'bove,on' August 30, 1985,'a radiation worker was observed

-

.

.

c enteringia'radiclegically controlled work area without-donning the.

'

7.'

oprotectiveclothing:(cottonliners,rubbergloves,plasticshoecovers,.

o

-

" fand rubberishoe iovers).-delineated in.RWP 850143. which had been established.

,[

-

forithe controlled area by.the.. health physics group.:

'

,

,

' llThisis'.aSeverityLevel:IVviolation(SupplementI).

~

,

C.'.'Teckical-[ Specification 3.3.3.8,requiresthatthe_firedetection-

'

~

'

,o

-

instrumentation for Fire Detection Zone 201 be' operable.

.

..

~_

m

~

.. W iThe action statement for Technical Specification 3.3.3.8 requires that-.

,

f'

awhen the~. fire detection instrument for Fire. Detection Zone 201 (located inside containment) is inoperable, a fire watch patrol must be established

'

'

'

-,!+

to inspect. Fire-Zone -201 at least once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />'_or the containment' air t
temperature must_be monitored at least once per hour at the locations

listed in TechnicaleSpecification 4.6.1.5.

  • $

?Contraryto;theabove,onAugust 13. 1985, with the fire detection instrument:

Ifor Fire Zone 201 inoperable, containment air temperature was not monitored

'

'atLleast once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> between the hours of 0700 and 1459, nor was _a fire watch patrol established to monitor Fire' Zone 201.

This is'a Sev_erity Level IV N olation (Supplement I).

' D.= -

10 CFR Part-50, Appendix B, Criterion V, states: " Activities affecting.

quality:shallThe prescribed by documented instructions, procedures or:

.

,

= drawings.u.. and.shall-be' accomplished in accordance with these instructions,' procedures, or drawings

..."

.

,

. Design Drawing E-IR 8900, Revision 3. " Raceway Notes. Symbols, and Details "

'

,

-

has been implemented in accordance with:10 CFR Part 50, Appendix B,

. Criterion Ve

-

Design Drawing E-IR 8900, Revision 3, provides the methods that are acceptable for installation of conduit at the Wolf Creek Generating Station.

Contrary to the above, on September 26, 1985, flexible conduit 1U1276,

-running betwee'n the rigid conduit mounted on the room wall and terminal

.

box TV-AB05 mounted on the main steam isolation valve (MSIV) AB HV-20,

,

'

was tied with a plastic stay strap to an air line (approximately

" -

3/4" diameter) going to the same. valve. Also, flexible conduit 1U1279, l

~

going to MSIV A8 HV-17, was tied with a plastic stay strap to the conduit

~

connector.(atthevalve)forconduit1U1277. This method of installing

,

"

iflexible conduit is not shown in. Drawing E-IR 8900 as an acceptable installation method.

This is a_ Severity Level IV violation (Supplement I).

.

,.

'

+

.e

. 'f

,

,

y

"

-

Sg,7,

-

-

't

-

e

,

}.'

rG'

,

'

, _

'

y, w m

.

f

'

m m

,37

'~.

n

.

Notice.ofiViolation_-

--3 -

'

'

- -

-

,

,_

_ _

i,.

. *,.

..

l

..

s

g g

..

. E.s ?10;CFR Part 50,LAppendix B,- Criterion V.. states::" Activities affecting -

N

",

quality shall.be, prescribed by documented-instructions.. procedures.-or

'

a:-P

'

Ldrawingsb...-. and shall be: accomplished.in;accordance with these F"

~

'

' instructions, procedures,:or drawings...

."

.

...

s.

.

.

.

.

<

.c

.

^

1 A L ADM 13-102, Revision,4, " Control of Combustible Materials," has been l established inLaccordance with 10 CFR Part 50,-Appendix B, Criterion V.

-

-

b

~ Sec51on5.1of'ADM13-1d2 states"Thepersonrequiringtheuseof3

.

combustible materials in excess of the amounts specified in Table 1.

<

ofLthis procedure will obtain.a permit.for.the handling, use,.and/or

u storage of_those materials from the fire. protection specialist or his

'

'

<

designee.

Storage.must' comply with S?ction 3.1.2."

,,

"

-Table 1 to ADM 13-102 states that1the:ma'ximum~ quantities of4 transient

,

_

,

- combustiblessolids allowed without a perinit will be (at or below)

10 cubic' feet and 100 pounds.

E

';

ContraryLtotheabove,on' September 25, 1985, 19 cardboard boxes, which

,

is in excess of'the amount specified in, Table 1 of Section.5.1 of

~

ADM'13-102, were observed to be unattended and stored on the north end

'

of.the auxiliary building on the 2026' level without the use of.a

,

combustible materials permit.

This is.a Severity Level IV-Violation (Supplement I).

^

v

,

. 2.'.

ADM 01-034, Revision.7, " Housekeeping and Cleanliness Control,".has

.been. established in'accordance with 10 CFR Part 50, Appendix B,

, Criterion V.

The following are excerpts from ADM 01-034:

,

Section_6.2.3:-" Oily ~ mops and wiping rags will be stored in

,

noncombustible containers when not in use."

<

Section 6.-l.4: " Rags,' paper, and other debris shall be placed in

suitable waste containers.

If radiologically contaminated items

>

.

are involved, the decontamination and/or. disposal will be done under

-

the direction of the health physics group."

-

~Section 6.2.2.1: " Combustible waste material will be disposed-i

.of at:least once per working shift in noncombustible covered waste

' receptacles."

!

-

'Section 6.2.2.8i " Oily rags and waste, in small amounts, shall be

'

disposed of in portable metal waste cans with a self-closing cover."

-

,

. Contrary to the above, on September 26, 1985, the following conditions

'were observed in the auxiliary building:

l

'

.

i l

'

!

,.

l l

!

-

!

'

t j

i (,

_

,

n..

, ---,..; - - _., -.,..-

v

.

..

.

..

.,__.---n-,,-.-__

-

-

m,

%

,

,

..

,

,

w:.k f

-

'

}.'

'

'

'

+

'

,

,

.y

.

,

$7y. (

~

'

,

..,

/

VNotiNe off vin 1ation:

"4 -

j

L

.-

-

-

.

...

.

..

4-a.

.~ A metal trash ' container (flapper lid type),' locate'd in ; Room?1509:

-

on'the'2047'slevel and' adjacent to main steam; isolation Dw G

~

Walve' AB HV-20, was: overflowing with combustible trash to the-O m

p. -

-t

' ~

i Lextent that the flapper. lid was'being held open bysthe trash.and-

'M J"

-

a' paper l towel:was on the floor ~ beside the trash' container.

,

-

.

..

-

.,

z=

.-

b.: LIn Room.1412' on the 2026' level and adjacent to main feedwater-

-

-

W, isolation valve AE FV-041,' approximately 20 oil-soaked rags -

>

L(approximately'1'. by 1?:in size).were lying on.the floor.,

~0n'the 1974'ilevel adjacent to Column AJ-A6 in the north-south-

~ *

['*

-

- c. -

corridor on the east side of the building. a trash barrel a'

~ >-m.

(50 gallon openitop drum);was approximately one-half full-of y

- o

'mostly combustibla material.--

~

'

' -

-

'

'

.

-

a

..

-

- d.'. 'On-the 2026' level adjacent to' Column AJ-A13, a trash barrel-

,

'

(50 gallon open top drum) was approximately-two-thirds full of

.

'

mostly. combustible material.

-

'

'

L0nthe2000'11evela'djacenttoColumn.A13-atshesouthendoff

-

e. ' the north-south corridor, an unattended pile of approximately-

,

,

10 rags-(approximately11' by.1' each) was on the floor beside

.

.

an overturned maintenance cart.

.,

,

- f.

.0n the.2047' level adjacent to Column AJ-A9, a trash. barrel l(50 gallon open top drum) was approximately three-fourths full

,

<

  1. '

.

'

of mostly combustible material.

,

,

This is a;5everity Level IV violation;(Supplement I).

-

,

[

Pursuant to.the provisions of 10.CFR 2.201, Karsas Gas'and Electric Company is

.

M hereby required to submit to this Office within 30 days of the date of the

. letter transmitting this-Notice, a written statement.or explanation in reply,

'

/ including for each violation: _(1) the'. reason for the violations if admitted,-

,

,

the~ corrective steps.which have been taken and the results achieved,'

- the corrective steps which will be taken to avoid further violations, and

~#

.

- the date when full compliance will be achieved. Where good cause is shown, consioeration will be' given to extending the response time.

,

>

e FOR THE NUCLEAR REGULATORY COMMISSION

-

/

r

[

f

'{K Robert D. Martin

.

Regional Administrator

,

t

~ Dated at Arlington, Texas,

,this day of December 1985.

[

,

'

c

.

,

n f

t j'

.

. -..

..

---._.~_..,~.__.._____._.-,....m_

.

- -. _... _ _, _... _. _