Text
f
.
U.S. NUCLEAR HEGULATORY COMMISSION HEGION III Report Nos.
50-546/u2-01; 50-547/82-01(DPRP)
Docket Nos.
50-546; 50-547 License Nos. CPPH-170; CPPH-171 Licensee:
Public Service of Iridiana Post Office Box 190 New Washington, IN 47162 Facility Name: Marble liill Nuclear Generating Station, Units 1 and 2 Inspection At: Marble 11111 Site, Jefferson County, IN Inspection Conducted: January 1 - 31, 1982
1f to Q ~{
Inspector:
J. J. Ilarrison
%
A Approved Hy:
J. F.
Streeter, Acting Chief IP 62 Heactor Projects Section 2C Inspection Summary Inspection during the period of January 1-31, 1982 (Report Nos. 50-546/
82-01; 50-547/82-01(DPRP)
Areas Inspected:
Inspection by the IE Hegional Resident Inspector of activities at the ' site to verify that the activities being performed complied with the NHC Confirming Stop Work Order, dated August 15, 1979, and were within the scope of the Graduated Hecission of the Order as identi fied in letters dated July 7, 1980 (authorization for PSI to resume receiving inspection activities). November 13, 1980 (authorization for two fi rms, Cherne and Commonwealth-Lord JV, to resume receiving inspection activities), December 5, 1980 (authorization for two firms, Cherne and Commonwealth-Lord JV, to resume construction activities with certain conditions being specified), and March 27, 1981 (authoriza-tion for Newberg-Marble 11111 to resume receiving inspection and construction activities with certain conditions being specified).
The inspection also consisted of reviewing construction activities being conducted by the civil contractor. This inspection involved a total of 100 inspector-hours on site by oi.' NHC inspector, including 28 inspector-hours onsite during off shifts.
Hesults: No items of noncompliance or deviations were identified.
0203230602 820224 PDRADOCKOS000g G
F
.
DETAILS 1.
Principal Persons Contacted Public Service of Indiana (PSI)
- S. Shields, Senior Vice President Nuclear Division B. Petro, Executive Director - Nuclear Project Management
- L. Hamsett, Executive Director - Nuclear Quality Assurance N. Heichel, Contract Manager Civil G. Warner, Civil Construction Engineering Supervisor
- C. Beckham, Quality Engineering Manager B. Morrison, Superintendent - Civil Quality Engineering
- J. Wolfe, QA Administrative Assistant Cherne Contracting Corporation (CCC)
J. Mortell, Vice President - Nuclear Projects A. Sirard, Project Manager A. Dolgaard, QC Manager T. Francis, Assistant Project Manager Newberg-Marble Ilill (N-Mil)
D. Stegemoller, Vice President - Power Construction L. Elliott, Project Manager C. Barbour, Project QA Manager Westinghouse Electric Corporation C. Markham, Site Manager Authorized Nuclear Inspect or ( ANI)
A. Clark,llartford Steam Boiler (ANI-PSI)
- Denotes those present at the exit meetings.
The inspector also contacted and interviewed other licensee and contractor personnel.
-2-b
(
.
2.
Functional or Program Areas Inspected a.
Construction Activities Inspection of con.struction activities were performed by the Hesident Inspector to assure that work in Category 1 areas was being performed within the scope of the NRC Confirmatory Order dated August 15, 1979, and Graduated Hecission to the Order by NRC lett ers of July 7, November 13, December 5, 1980, and March 27, 1981.
The activities observed were within this scope.
Also,during this reporting period, the Resident Inspector observed the following:
(1) Civil - The chipping,cvaluation and repair of defective concrete areas in the Auxiliary, Fuel, and Unit 1 Containment Buildings. The Resident Inspector observed the work and inspection activities as detailed in Newberg Procedures:
WPN-25, Conc ete Patching, Revision 8 WPN-25-02, Concrete Patch and Repair Area Evaluation, Hevision 5 WPN-41, Concrete Curing, Revision 2 QCP-10.04, Concrete Curing Inspection, Revision 2 QCP-10.06, Post Placement and Patching Inspection, Revision 5 Also during the month the Resident Inspector observed concrete placement activities.
Inspections were conducted for preplacement and post placement activities to the following Newberg Procedures:
WPN-13, Installation of Embedded Items, Revision 12/13 WPN-34, Production Preplacement Evaluation, Revision 5 WPN-41, Concrete Curing, Hevision 2 QCP-10.02, Concrete Preplacement Inspection, Revision 4 QCP-10.04, Concrete Curing Inspection, Hevision 2 No items of noncompliance or deviations were identified.
-3-
(
_ _.
._
.,.
3.
Exit l
The Resident Inspector met with licensee representatives (denoted under Persons Contacted) periodically throughout this reporting period,co11cetively and individually.
The Inspector summarized the scope and findings for each part of this activity.