IR 05000461/2007401

From kanterella
Jump to navigation Jump to search
IR 05000461-07-401 (Drs), on 01/9/2007 - 01/12/2007; Exelon Nuclear Corporate; 06/04/2007 - 06/08/2007; Clinton Power Station; Routine Security Baseline Inspection - Cover Letter
ML072000336
Person / Time
Site: Clinton Constellation icon.png
Issue date: 07/13/2007
From: Eric Duncan
Plant Support Branch II
To: Crane C
Exelon Generation Co, Exelon Nuclear
References
IR-07-401
Download: ML072000336 (5)


Text

uly 13, 2007

SUBJECT:

CLINTON POWER STATION NRC SECURITY BASELINE INSPECTION REPORT 05000461/2007401(DRS)

Dear Mr. Crane:

On June 8, 2007, the U.S. Nuclear Regulatory Commission (NRC) completed a security baseline inspection at your Clinton Power Station and Exelon Nuclear Corporate Office. The inspection covered one or more of the key attributes of the security cornerstone of the NRCs Reactor Oversight Process. The enclosed inspection report documents the inspection results, which were discussed on June 8, 2007, with Mr. F. Kearney and January 12, 2007, with Mr. G. Kaegi and other members of your staff.

The inspection examined activities conducted under your license as they relate to security and compliance with the Commissions rules and regulations and with the conditions of your license.

The inspector reviewed selected procedures and records, observed activities, and interviewed personnel.

No findings of significance were identified.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at EXEMPT FROM PUBLIC DISCLOSURE May be exempt from public release under the Freedom of Enclosure Contains Sensitive Unclassified Information Act (5 U.S.C. 552) Non-Safeguards Information. Upon separation, this page is decontrolled.

Exemption number: 5 Nuclear Regulatory Commission review required before public release.

Don Funk, RIII/DRS/PSB Name and organization of person making determination.

Date of determination: 06/11/2007 http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

However, because of the security-related concerns contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letters enclosure will not be available for public inspection.

Should you have any questions concerning this inspection, we will be pleased to discuss them with you.

Sincerely,

/RA by D. Funk acting for/

Eric Duncan, Chief Plant Support Branch Division of Reactor Safety Docket No. 50-461 License No. NPF-62 Nonpublic Enclosure: Inspection Report 05000461/2007401(DRS)

w/Attachment: Supplemental Information cc w/encl: Deani Riffle, NSIR/DSO/DDSO State Liaison Officer, State of Illinois C. Williamson, Clinton Site Security Manager cc w/o encl: Site Vice President - Clinton Power Station Plant Manager - Clinton Power Station Regulatory Assurance Manager - Clinton Power Station Chief Operating Officer Senior Vice President - Nuclear Services Vice President - Operations Support Vice President - Licensing and Regulatory Affairs Manager Licensing - Clinton Power Station Senior Counsel, Nuclear, Mid-West Regional Operating Group Document Control Desk - Licensing Assistant Attorney General Illinois Emergency Management Agency Chairman, Illinois Commerce Commission Enclosure Contains Sensitive Unclassified Non-Safeguards Information. Upon separation, this page is decontrolled.