IR 05000460/1982011

From kanterella
Jump to navigation Jump to search
IE Insp Rept 50-460/82-11 on 820628-0702.No Noncompliance Noted.Major Areas Inspected:Allegation Re HVAC Contractor, Licensee Action on Previous Insp Findings & Action on IE Circulars
ML20062H911
Person / Time
Site: Washington Public Power Supply System
Issue date: 07/21/1982
From: Dodds R, Narbut P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To:
Shared Package
ML20062H898 List:
References
50-460-82-11, NUDOCS 8208160208
Download: ML20062H911 (12)


Text

.

.

U. S. NUCLEAR REGULATORY C0ff4ISSION

REGION V

!

Report No. 50-460/82-11 Docket No. 50-460 '

License No. CPPR-134 Safeguards Group i Licensee: Washington Public Power Supply System P. O. Box 968

Richland, Washington 99352 Facility Name
Washington Nuclear Project No.1 (WNP-1)

Inspection at: WNP-1/4" Site Bent'on County Washington Inspection conduc^ted: June 28 ' July 2,1982 Inspectors; ,2 f ,l)02 P. P. Narbut, Reactor Inspector Date Signed Approved by: lM D Or R. T. Dodds, Chief, Relactor Project 7 L Date Signed Section 2, Reactor Construction Projects Branch Summary:

Inspection during the period of_ June 28 - July 2,1982 Areas Inspected: Routine unannou,,ced inspection by one region based inspector

,

of licensee activities including an allegation against the heating ventilation and air conditioning contractor, licensee action on previous inspection findings and examination of licensee action on certain IE Circular The inspection involved 30 inspector-hours onsite by one region based inspecto Results: No items of noncompliance or deviations were identifie !

i j 8208160208 820722

<

PDR ADC0K 05000460 Q PDR

'

,

.

'

i

.

DETAILS

Persons Contacted Washington Public Power Supply System '

'

R. W. Root, Program Director; 1

,

i

  • R. Edwards, Project-Quality Assurance Manage *G. K. Dykemar., Design Engineering Manager .
  • R. F. Mazurkiewicz, Operations Manager

'

  • J. L. Jackson, Construction Manager
  • M. C. Carrigan, Assistant Program Director .

J. Steidle, Senior Quality Assurance Engineer L. C. Oakes, Senior Mechanical Engineer  !

D. McClure, Maintenance Supervisor' ,

, Bechtel Power Corporation (Bechtel)

  • Horn, Field Construction Manager
  • G. K. Frazier, Acting Project Quality Assurance Engineer ,

'

  • C. Kasch, Project Construction Quality Control Engineer United Engineers and Constructors (UE&C)
  • L. Faust, Field Surveillance Quality Assurance W. C. Anderson, Electrical Field Project Superintendant University Nuclear Systems Incorporated (UNSI)
  • S. Cohen, Project Manager
  • B. Sachs, Project Quality Assurance / Quality Control Manager
  • C. Holt, Assistant Project Quality Assurance / Quality Control Manager , Foley Wismer Becker Incorporated (FWB)

( l l R. Anderson, Cable Enginee"  ;

' '

  • Attended exit interview on July 2,198 . Allegation against UNSI i l Allegation: An allegation was received which indicated the UNSI Assistant l

! Quality Assurance / Quality Control Manager did not meet the experience [

requirements of ANSI N 45.2.6 for level 3 qualifications, in particular, -

,

he did not have two years of nuclear experienc '

t i I

'

l i  !

i i i

i i

-

.

-2-Finding: The allegation was not substantiate The inspector examined the Assistant Manager's employment and training history, the UNSI procedure for qualification, the licensee's PSAR committment and ANSI and Regulatory Guide requirements. The inspector also interviewed the Assistant Manage The inspector found that the Assistant Manager exceeded all the ANSI N 45.2.6 requirements for level 3 qualification with the exception of not having two years nuclear experience. At the time of his certification to level 3 by UNSI he had 14 months nuclear experienc However, certain exceptions to the ANSI standard applie The licensee committment in the PSAR was that, for contractors, personnel qualification would be performed in accordance with contractor procedures which were only required to meet the " basic elements" of the ANSI standard. The ANSI standard mitigated its own requirements by stating that the extent to which individual requirements apply would depend upon the nature and scope of the work to be performed. Both the ANSI standard and the UNSI aualification procedure stated that the education and experience requirements should not be treated as absolute when other factors provided reasonable assurance that a person could competently perfor In the inspector's review- of. the Assistant Quality Assurance /Ouality Control Manager's history,-he found no evidence which would indicate the Assistant Manager was.not competent to perfor Certain items were identified by the inspector which were not directly related to the allegation. Those items were: The Assistant Manager's annual eye test certification had expire However, he was promptly recertified during the week of the inspectio The Assistant Manager's certification to level 3 was signed by the Corporate Quality Assurance Manager whereas the UNSI procedure required certification by the Executive Vice President. This item, however, had been previously identified by UNSI Quality Assurance personnel and was documented on Quality Finding Report QFR 82-1-3-3 dated June 2, 1982. UNSI had not completed action on the QFR at the time of inspectio .

. UNSI had previously comitted to perform 100% re-inspection of welds in response to an NRC item of noncompliance. During the inspection, it'was discovered that_UNSI was no longer-planning to perform that re-inspection. The inspector alerted licensee management to this departure from their committment to the NR The UNSI Quality Assurance Manager informed the' inspector that

' UNSI had received a specification change to eliminate quality control from the as-built drawing process. The inspector alerted licensee management that the NRC considers the generation of as-built drawings (which are used as design input for seismic >

analysis confirmation) to be a safety related activity and therefore applicable to the provisions of 10 CFR 50, Appendix B. The as-built drawing program will be inspected in the normal course of future inspections.

3. Licensee Action on Previously Identified Items  !

The licensee submitted five previously identified items as closeable, that is, items for which ;the licensee considered'the necessary actions to close the item had'been completed. The inspector. closed two of the ;

items submitted. Theff ollowing paragraphs include the status of the

-

other three items which were not ready for" closure. At the exit interview t the inspector discussed the items and his opinion that the items should have been recognized as not closeable by the licensee staff. This subject t had been previously discussed in report 50-460/8.2-0 ,

' (0 pen) (460/81-12-01) Enforcement Item: Failure to verify nonconformance report actions were complete prior to closing '

the report The licensee's actions to resolve this item were described in letter i G01-82-49 of February 11, 1982. Ir. the letter the licensee &

'

committed to:

(1) Issue a nonconformance report to document the incomplete action .

P (2) Issue an information letter to UE&C and Bechtel by February 26, 198 ,

(3) To have Bechtel issue a letter of direction to active contractors by March 1, 198 (4) To have UE&C establish a program for reevaluation of all old nonconformance reports for closed contract '

.

-

-4-The inspector verified actions (1) and (2) above.were take Actions (3) and (4) above had not been taken at the time of

"

inspection. Therefore, this item remains ope (Closed) (460/80-13-02) Followup Item: 1 Deficient procedures'for installation and termination of cables The problems identified in the item were that controls were not provided in the contractor's procedure for determining (prior to cable pulls) whether limits would be exceeded on the maximum allowable cable tension, minimum cable bending radius, maximum cable sidewall pressure, and minimum cable rolling temperatur The licensee representatives stated the contractor's procedure and specifications have been revised to resolve the identified problems. The inspector examined the revised procedure QCP-10, Revisicn 7 dated June 9, 1982 and the revised technical specifi-cation 9779-218, Revision 176, Division 16D, Section '6 The procedure references the specification and the specification provides methods of calculating expected cable tension and sidewall pressur The procedure does not specifically require calculations to be performed prior to cable pulls, it requires the maximum allowable tensio'n (a tabular value for a cable type) to be listed on the cable pull packag The procedure infers, by reference to the specification, that calculations of sidewall pressure and expected tension be performe The licensee / contractor representatives stated that controls of minimum cable bending radius are provided by conduit design engineers in the design process and normal quality control surveillance of cable pulls and that minimum cable pull temperature limits are given in the procedure and controlled through quality control inspection required by the procedur The inspector interviewed the cable engineer and determined that the calculations of expected tension and sidewall pressure were being performed prior to cable pull At the exit interview the inspector discussed the contractor's procedure and the lack of a specific requirement to perform the calculations inferred by reference to the specification. Licensee

.

___+-um->

.

.

-5-management acknowltdged that this item could be closed with the understanding that the contractor's procedure as written is considered to require the calculations be performed prior to cable pull c. (0 pen) 460/80-13-03 Followu ) Item: Electrical contractor procedures to be modified to include clannel separation inspections per IEEE 384 This item had been previously followed up in inspection 50-460/81-0 <

The remaining issues were:

(1) The specification drawings for.-the use of fire barriers (when minimum separation criteria could not be met) did not include the dimensional information given in IEEE 38 ;

~

The licensee action on this aspect was to delete the existing fire barrier detail drawings in the specification and to defer new detail drawings until the licensee's study of 10 CFR 50 Appendix R requirements is completed. -This study is currently expected to complete in late 198 This aspect of the item therefore remains ope (2) The specification does not provide separation criteria for flexible conduit or state the type to be use The licensee representative stated the separation criteria given in the specification for conduit applies both to rigid and flexible conduit. Additionally, the type of flexible conduit to be used was added to the specification Section 16D paragraph 2.1.2.1. The specification requires "Greenfield" ,

flexible conduit which is spiral wound metal flexible condui *

i j This aspect of the item is considered close (3) The specification defines "M" division as an associated circuit and a safety related divisio "M" division is not j

defined in the PSAR or FSAR.

, The licensee action was to include a definition of "M" l division in the FSAR submitted to the NRC for docketing.

l The aspect of the item is considered closed.

l l

l I

I t

I

. -

_

.

.

-6-d. (0 pen) 460/80-16-05 Followup Item: Receipt inspection of ASME prepurchased equipment This item as orginally written stated the NRC would inspect receipt inspection of vendor supplied equipmen The licensee's receipt inspection program methodology was inspected in conjunction with an inspection of the receipt tagging in the laydown area (reference report 460/82-03).

The licensee's program depends on quality assurance provisions imposed in the contract to the supplier, that is, the supplier's quality assurance program and UE&C's vendor surveillance progra Receipt inspection at the site is limited to an inspection for item count, damage, and documentation review. There is no program requirement for onsite reinspection or sampling inspection of vendor supplied hardware. The program established by the licensee has been generally recognized as an acceptable method of controlling vendor supplied equipment qualit During this inspection the inspector.. examined the licensee's quality assurance staff surveillances for the last year and determined that no hardware reinspections of vendor items had been performe Responsible Bechtel quality control management personnel stated their contract does not require reinspection or sampling inspection of vendor supplied items. Additionally, site contractors performing installation of vendor hardware are not required to inspect vendor supplied items and in some cases (e.g. JAJ ITI-005) contractor procedures specifically limit contractor personnel to looking at contractor work onl At the exit interview the inspector discussed examples of vendor supplied hardware which had been received at the site with significant deficiencies. The examples were:

. Enforcement Item 80-16-04: Pipe supports not in conformance with drawin . Enforcement Item 80-11-01: Pipe stop attachment welds undersiz . Enforcement Item 82-06-01: Pipe whip restraint welds undersiz . Enforcement Item 80-10-01: Allied Capital welds undersiz .

.

-7-

. Enforcement Item 80-01-02: Undersize welds on pipe support . 50:55(e) Report of August 15, 1979: Defective welds on Superstrut assemblie . 50:55(e) Report of December 7,1979: WKM valve defect . 50:55(e) Report of January 26, 1982: WKM valve material discrepanc . 50:55(e) Report of January 26, 1982: DuBois steel tube defect . 50:55(e) Report of February 10, 1982: Powell Electric breaker connectors misaligne The following related inspection finding was also discussed with licensee management:

. Followup Item 81-10-04: Supplier evaluation appears wea At the exit interview licensee management committed to consider the benefit of instituting an on-site sampling program of vendor supplied items for compliance to drawings and specification requirement This item will be inspected further during a future inspectio e. (Close) (460/79-06-01) Followup Item: IE Circulars 78-08, 78-09, 78-13, 78-15 and 78-16 require followu The inspector examined the licensee's action on these circulars and will report on the examined circulars later in this report. This item is being closed since circular closeout ' actions are tracked separately by NRC and this item is redundan in regards to the licensee's readiness to close this item (presented as closeable), one circular (78-09) was listed with action still required on the licensee's tracking system and one circular (78-16) was not considered closeable by the inspector., The remaining three circulars were closed by the inspecto Additionally, the inspector examined the licensee's revised site Bulletin / Circular /Information Notice tracking system. In general the revised system appears to provide'better control of actions with certain exceptions noted which are discussed later in this report in the discussion of individual circular .

.

-8-The inspector observed that the Supply System corporate procedure defining the interface of responsibilities between the corporate offices and the site for NRC items was deleted during the Supply System reorganization in early 198 The procedure was previously identified as EDP- It will be reissued according to the license The reestablishment of the corporate procedure will be inspected further in a future inspectio (Followup item 50-460/82-11-01)

4. Licensee Action on IE Circulars (Closed) Circular 78-08 Environmental Oualification of Safety Related Electrical Equipment The licensee closed this item with memorandum E14 NSD-7808 dated September 15,1978 in which the licensee evaluated their program as comprehensiv The inspector closed this item on the basis of IE Bulletin 79-01 which supercedes this Circular. The Bulletin remains ope (Closed) Circular 78-13 Inoperability of Service Water Pumps The licensee closed this item based on the information provided in letter E-14 NSP-79-29 dated May 24, 197 The inspector reviewed the licensee's information and closed the circular on the basis of the information presente (Closed) Circular 78-15 Tilting Disk Check Valves Fail to Close with Gravity in the Vertical Licensee letter E14 NSP-79-27 dated May 23, 1979 provides the information that the WNP-l/4 site does not use check valves in vertical runs. The inspector closed the circular on the basis of the information presente (0 pen) Circular 78-16 Limitorque Valve Operators The circular presented operational problems with certain models of Limitorque valve operators. The problem presented was that ,

when used in the manual mode for extended periods of time, the'

valve operators may fail to operate in the motorized mode. The Circular recommended implementing a procedure 'for . verifying the operator was functional with the motor after performing' manual operation _-

7-

. _

,

. .-

=

-9-

.The licensee closed the circular on the basis of letter , , .

E14-NSP-79-30 of May 24,1979 and letters referenced therei >

^

,O The licensee's letter and references suggested that other actions such as design changes to add bypass valves.could be

-

made to eliminate the need for manual operation of Limitorque ,_,

valve operators. However, no such alternative action was -

indicated to have been taken, and cognizant engineering personnel stated no alternative actions had been taken. Therefore, the inspector disagreed with the licensee's' closing of this circula This circular remains ope (Closed) Circular 79-03 Inadequate Guard Training The licensee closed this item on the basis that it was not applicable to power plants. The inspector closed the . item on the basis that the circular was issued to holders of special nuclear material licenses in safeguards Group 1 which does not include WNP-1/4. Therefore, this circular is close (0 pen) Circular 79-04 Loose Locking Nuts on Limitorque Valve Operators The circular stated that certain models of Limitorque operators

~

had become inoperable due to locking nuts becoming 1oose and the operator disengaging. The circular suggested (1) surveying the operators and verifying the lock nuts were staked and (2). verifying assembly and maintenance instructions contain directions for staking the locknut The inspector examined the licensee's survey of valve suppliers and the on-site inspection actions. The inspector closed the first part of the circular on the basis of the licensee's action In regards to the second part of the circular, the licensee had no basis for close out in his file (regarding assembly and maintenance instruction actions).

The inspector examined site copies of the certified vendor instruction (CVI) files and interviewed licensee maintenance personne ..

-

-_

.

.

-10-The CVI files.had staking instructions for some valves and did not for other valves. The inspector examined the valve operator instructions for a sample of three valve manufacturers. Two of the three did not have staking instructions include Engineering and maintenance personnel interviewed indicated that:

.

CVI files were to be transferred to the site but that process had not been finalize .

Maintenance instructions would be prepared from the CVI files

,

but that was a future actio .

Maintenance / operations actions in NRC Bulletins / Circulars /

Information Notices and in manufacturer's notices and service advisories were not currently being clearly administered and that " holes" probably did exit in the information provided to operations / maintenanc This circular was discussed at the exit interview as well as the administration of information to operations / maintenanc This circular and the licensee's actions to provide information to operTtions/ maintenance will be inspected further in a future inspectio (Closed) Circular 79-11 Design / Construction Interface Problem The circular provided the example of a site that had installed a misoriented reactor vessel and requested licensee's examine their Design / Construction interfac The licensee closed the circular on the basis that it was "not applicable" to WNP-1/4 as stated in an internal engineering memorandum dated June 18, 198 Although the inspector did not consider the basis of closure used by the licensee to be adequate, the inspector closed the item on the basis of the past and planned NRC. inspections of the Design /

Construction interfac This item was discussed at the exit interview with licensee managemen . _ . -

o

,

-11- (Closed)- Circular 79-13 Replacement of Diesel Fire Pump l Starting Contactor The licensee closed the circular on the basis that the site did not have the type of fire pump which was the subject of the circula The inspector closed the circular on the basis of the information provided in letter E14 JVH 79-02 (Closed) Circular 79-17 Contact Problens in SB-12 Switches on GE Metalclad Circuit Breaker The circular was closed by the licensee on the basis of letter UE-WD-79-1123 which stated the subject switches would be replace The inspector closed the circular on the basis that nonconformance reports 1-NCR-048-041 and 4-NCR-048-08 were written to identify the specific breakers which required switch replacement. Since NCR's are a controlled, tracked document the inspector closed the circula (Closed) Circular 79-18 Proper Installation of Target Rock Safety Relief Valves The licensee closed this circular on the basis of letter E14 NSP-79-59 of September 20, 197 The inspector closed this item based on its applicability to BWR's versus PWR' (Closed) Circular 79-19 Loose Impeller Locking Device on Ingersol Rand Pumps The licensee closed this item based on letter E14 JVH-79-030 for pumps on Contract 6 The inspector closed this item on the basis of the licensee's letter and after verifying the Contract 62 was the only contract which involved safety related pumps from Ingersol Ran . (Closed) Circular 79-20 Failure of GTE Sylvania Relays The licensee closed this item based on letter WPUE-79-1383 dated November 13, 1979 which stated the subject relays were not used at the WNP-1/4 site. The inspector closed the bulletin on tha basis of the licensee's lette . Exit Interview The peisons identified in paragraph 1 met with the inspector on the date

~

indicated in paragraph 1. The scope of the inspection and the findings were discussed as stated in this report.