IE Mgt Meeting Repts 50-460/80-12,50-513/80-12,50-508/80-11 & 50-509/80-11 on 801009.No Noncompliance Noted.Major Areas Discussed:Enforcement,Ie Bulletins & Insp Program
ML20002A552
Person / Time
Site: Washington Public Power Supply System, Satsop
Issue date: 10/29/1980
From: Bishop T, Engelken R, Haist D, Haynes R, Spencer G, Toth A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To:
Shared Package
ML20002A545 List:
References
50-460-80-12, 50-508-80-11, 50-509-80-11, 50-513-80-12, NUDOCS 8011200117
Download: ML20002A552 (3)


Text

.

.

(/

\\_

U. S. NUCLEAR rec 0LATORY COISIISSIoM OFFICE OF IN3PECTICN AND ENFoRCEME!.T

'50-513/80-12 REcIcn v 50-508/80-11 R psrt No.

50-509/80-11 50-460, 50-513, Docket No.

50-5'J8. 50-509 License No. CPPR-l?4. CPPI 174. CPPR-154. CPPR-155 Licansee:

Washingtnn Dohli<- Dnwav-Sunniv Svstam DA Anv c@o Richland, Washington 993f2 Facility Name:

Washinaton Nuclear Proiects 1 & 4, 3 & 5 Meeting at:

WPPSS Corocrate Office. Seattle Washinaton Meeting conducted:

Octobar o. IcRO Participanth.

_

[(AC,~,dd~--

/e/xc/.q,,

n. n. cage Ken, virector Date signec

/

'S

- -

,, /.,J/a%

R. C. HaynesGoJect Section Chief Date signeo A2d44

oksk T. W. Sishop, Senior Resident Inspector Date signed

~

Y$hm

/blL9/de A.D.Totg7/SeniorResidentInspector cate signed an ua,s.

D. P. !1aist, Reactor Inspector Date' Signed Reviewed by:

d. b w

/o/z.9/4e

'G.

S. Sp6ncer, Chief, Reactor Construction &

Date Signed EngTneering Support Branch Summary:

Management Meetino on October 9,1980 (Reports Nos. 50-460/80-12, 50-513, 50-508/80-11, and 50-509/80-11)

Meeting held'at the licensee's corporate office to discuss results of the licensee's performance evaluation by Region V for the period May 29, 1979 through July 18, 1980 for the WNP 1/4 project and the period August 1979 through August 1980 for the WNP 3/5 project. Areas warranting improvement were identified to the licensee as well as areas to be given increased NRC attention.

T*

eporting requirements of 10 CFR 50.55(e) were also discussed.

RV Form 719 (7)

8011200

/d7

.

.,...

p ec,,,

/

o 1,NITED STATES

',-

'

[% h g,f',g-MUC1. EAR RLGULATORY COMMISs!ON,

<g.M Q ).., f 8,44.;;Udi /r;,e -

REGION V

,

o J

% * \\/ *' f OulTE *02. WALNUT CREEX PLAZA

'/tAttiUT O.'IEEK. CALIFORNIA 94596 s,wa i

SEP 3 01980

?

.

AGE?lDA

.

.

LICE?:SEE: Washingten Public Power Sucoly System FACILITY: Washington Nuclear Projects - Units 1 and 4; 3 and 5

,

DATE AND TIME OF MEETING: October 9, 1980, 10:30 a.m.

..

LCCATIO!!: Kilroy Tcuer No. 2, SEA-TAC Airport, Seattle, Washington

'

SUEJECT: i:RC Regional Evaluation of LiceSee Perfomance for perico of ;4ay 1979 throuan Ju'/1980 (Units 1 anc 4)

anc August 1979 througn-Augu.t 1980 (Units 3 and 5)

,

t 1.

Introduction - R. H. Engelken, Director, Region V 2.

Description of fiRC's Systematic Assessment of Licensee Performance Program - R. H. Engeiken, Direct;or, Region V

,

3.

Iden ification of iiRC Regional Review toarc Memoers, 'viiiP 1 and 4

,

R. H Encaiken, Director, Regica V i

a.

Summary of finnings of-current review - R. C. Haynes, Chief, Projects Section, Reactor Construction and Engineering Support Branch 1) Enforcement 2) Bulletins, reporting 3) Changes to liRC inspection program

,

I b.

Specific areas of concern - R. C. Ilaynes

l t

l

-

f

,

- -.,

-

,-

.-

-,

.

.

?

Agenda-2-4.

Ider.tification of flRC Regional Review Board Members, WNP 3 and 5

- R. H. Engelken, Director. Region 'I a.

Summary of findings of current review - R. C. Haynes, Chief, Projects Section, Reactor Construction and Engineering Support Brancn 1) Enforcement history 2) Bulletins, reporting 3) Changes'in NRC insaection procram b.

Specific areas of concern - R. C. Haynes 5. ' Questions /ccmments

.

56.* Me e

.