IR 05000454/2003005

From kanterella
Jump to navigation Jump to search
IR 05000454-03-005(DRS) and IR 05000455-03-005(DRS) on 04/08-11/2003, Exelon Generation Company, LLC, Byron Nuclear Power Station, Units 1 and 2. Ti 2515/148, Verification of Compliance with Interim Compensatory Measures Order
ML031710881
Person / Time
Site: Byron  Constellation icon.png
Issue date: 06/20/2003
From: Pederson C
Division of Reactor Safety III
To: Skolds J
Exelon Generation Co
References
IR-03-005
Download: ML031710881 (6)


Text

une 20, 2003

SUBJECT:

BYRON NUCLEAR POWER STATION, UNITS 1 AND 2 NRC SAFEGUARDS INSPECTION OF COMPLIANCE WITH ORDER INSPECTION REPORT 50-454/03-05(DRS); 50-455/03-05(DRS)

Dear Mr. Skolds:

On May 16, 2003, the NRC completed an inspection at your Byron Nuclear Power Station. The enclosed report documents the inspection findings which were discussed on May 16, 2003, with Mr. S. Stimac and other members of your staff.

The inspection examined activities conducted under your license as they relate to safety and compliance with an Order issued on February 25, 2002, which required your site to implement specific measures related to the security of your facility. The inspection utilized Temporary Instruction 2515/148, Inspection of Nuclear Reactor Safeguards Interim Compensatory Measures, to verify implementation of the Order as clarified in your responses dated March 15, 2002, May 24, 2002, and June 19, 2002. Within these areas, the inspection consisted of selected examination of procedures and representative records, observations of activities, and interviews with personnel.

On the basis of the results of this inspection, no findings of significance were identified.

The material enclosed herewith contains Safeguards Information as defined by 10 CFR 73.21 and its disclosure to unauthorized individuals is prohibited by Section 147 of the Atomic Energy Act of 1954, as amended. Therefore, the material will not be placed in the Public Document Room.

In accordance with 10 CFR 2.790 of the NRCs Rules of Practice, a copy of this letter, without enclosure, will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Enclosure Contains Upon Separation This Page is Decontrolled Should you have any questions concerning this inspection, we will be pleased to discuss them with you.

Sincerely,

/RA by R. Caniano Acting for/

Cynthia D. Pederson, Director Division of Reactor Safety Docket Nos. 50-454; 50-455 License Nos. DPR-19; DPR-25 Enclosure: Inspection Report 50-454/03-05(DRS);

50-455/03-05(DRS) ( )

cc w/encl: Site Vice President - Byron Byron Station Plant Manager Regulatory Assurance Manager - Byron Chief Operating Officer Senior Vice President - Nuclear Services Senior Vice President - Mid-West Regional Operating Group Vice President - Mid-West Operations Support Vice President - Licensing and Regulatory Affairs Director Licensing - Mid-West Regional Operating Group Manager Licensing - Byron Senior Counsel, Nuclear, Mid-West Regional Operating Group Document Control Desk - Licensing NSIR/DNS/RSOS cc w/encl w/o : M. Aguilar, Assistant Attorney General Illinois Department of Nuclear Safety State Liaison Officer Chairman, Illinois Commerce Commission Enclosure Contains Upon Separation This Page is Decontrolled