_ - - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
F 6 l991 i
,
Docket Nos. 50-445/91-03 50-446/91-03 License No. NPF-87 Construction Permit No. CPPR-127 EA 91-015 TV Electric ATTN:
W. J. Cahill, Jr., Executive Vice President, Nuclear Skyway Tower 400 North Olive Street, L.B. 81 Dallas, Texas 75201 Gentlenen:
This refers to the enforcement conference conducted at Region IV's request in the Region IV office on February 19, 1991.
This meeting related to apparent violations of NRC requirements identified in NRC Inspection Report 50-445/91-03; 50-446/91-03, dated February 1, 1991, and was attended by those on the attached Attendance List.
The subjects discussed at this meeting are described in the enclosed.".: sting Summary.
It is our opinion that this neeting was beneficial and has provided a bette, understanding of the concerns identified during the inspection.
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,
.
Title 10, Code of Federal Regulations, a copy of this letter will be placed in the NRC's Public Document Room.
Should you have any questions concerning this matter, we will be pleased to ditcuss them with you.
Sincerely
.
Origind Signed By:
Samuel J. Collina Samuel J. Collins, Director Division of Reactor Projects Enclosure:
Meeting Sumary w/ attachments cc w/ enclosure:
(see next page)
i ne 12ol RIV:DRP/B CM C:DRP/B E
.f b
f
.x g{l CEJohnson;df DDChamberlain G
rn JL etterman S,
ns 2/Al/91 2/22/91
/91
/9A
% /91 l
9103120033 910306 l
PD3 ADOCK 0D000445 J
/,
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ -. _ _
-. _ _ _ _ _ _ _ _ _ _ -. _ _ _ _
_
_
u
O
-; 3
'
tr-
!
-
'kr-s '
LTU Electric-2-cc w/ enclosure:
TU Electric ATTN:
Roger D. Walker, Manager Nuclear Licensing Skyway Tower 400 North 011/e Street, L.B. 81-Dallas, Texas 75201 Juanita Ellis President - CASE f
1426 South Polk Strect Dallas, Texas 75"?4 GDS Associates, Inc.
Suite 720 11850 Parkway Place
.
- Marietta,' Georgia 30067-8237 i
TU Electric
'
Bethesda Licensing 3 Metro Center Suite 610 Betheeda.. Maryland 20814
,
Jorden, Schulte,~and Burchette
!
' ATTN:- William A. Durchette, Esq.
,
Counsel for Tex-La Electric Cooperative of Texas 1025 Thomas Jefferson St., N.W.
Washington, D.C.
20007 E. F. Ottney
!
=P.O.-Box 17/7
'
,;
Glen Rose, Texas 76043 1Newman & Holtzinger,'P.C.
ATTN: Jack R. Newman, Esq.
,
1615 L. Street, N.W..
.,
' Suite 1000
'
- Washington, D.C.
20036-Texas Department of Labor & Standards t re ATTN:
G. R. Bynog, Program Manager /
Chief Inspector Boiler Division
,P.O. Box 12157, Capitol Station Austin, Texas 78711
-
,
-. _ _ _
-
-_
.
..
__
l
'
.
TV Electric-3-Honorable Dale McPherson County Judge P.O. Box 861
]
- Glen Rose, Texas 76043 Texas Radiation Control Program Director 1100 West 49th Street Austin, Texas 78756 bec to DMB (IE14)
bec distrib. by RIV:
R. D. Martin ResidentInspector(2)
Project Engineer (DRP/B)
DRSS-RPEPS Lisa Shea, PM/ALF MIS System RSTS Operator RIV Files G. F. Sanborn, EO J. Lieberman, OE W. L. Brown
/
f
w
_ - _ _ - _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _
_ _ _ _ _ _ _ _ _ _ _ _ _
l
'
.
MEETING SUMMARY
' Licensee:
TV Electric Facility:
ComanchePeakSteamElectricStation(CPSES)
License No.:
>
Construction Permit No.:
CPPR-127 Docket Nos.:
50-445; 50-446 Subject:
ENFORCEMENT CONFERENCE CONCERNING CPSES FIREWATCri LOG 1RREGULARITIES On February 19, 1991, representatives of TV Electric met with Region IV personnel in Arlington, Texas, to discuss the f'ndings contained in NRC Inspection Report 50-445/91-C); 50-446/91-03 pertaining to the roving firewatch patrol log irregularities. The attendance list and licensee presentation are attached to this surrmary.
The licensee prasented its views on the apparent violations, including the causes and corrective actions taken, short-and long-tenn.
Attachments:
1.
Attendance List 1.. Licensee Presentation (NRC distribution only)
- _ _ _ - _
'
.
ATTACHMENT 1 ATTENDANCE LIST Attendance at the enforcement conference between TV Electric and NRC on February 19, 1991, in tb Region IV office was as follows:
'
TU Electric W. Cahill, Jr., Executive Vice President, Nuclear A. Scott, Vice President, Nuclear Operations J. Streeter, Executive Assistant to President J. Rumsey, Manager of Corporate Security R. Walker, Manager, Nuclear Licensing W. Guldemond, Manager, Site Licensing 0. Bhatty, Site Licensing S. Frantz, Newman and Holtzinger, Counsel J. French, Consultant, Independent Advisory Group
_F W. Grace, Manager, Safety Services S. Palmer, Stipulation Manager J. Seawright, Licensing Engineer G. Stein, Administrative and Technical Assistant, Maintenance L. Terry, Director, Nuclear Overview NRC 5. J. Co" irs, Director, Division of Reactor Projects (DRP)
.:. P. Jaudon, Acting Director, Division of Reactor Safety (DR".)
W. L. Brown, Regior.al Counsel, Region IV G
F. Sanborn, Enforcement Officei, Region IV W. Clifford, Senior Droject Manager, Comanche Peak, Office of Nuclear s
Reactor Regulation D. D. Chamberlain, Chief, Project Section B, DRP W. C. Seidle, Chief, Test Programs, DRS A. M. Singh, Chief, Test Programs, DRS C. E. Johnson, Project Engineer, Comanche Peak, Unit 2 W. D. Johnson, Senior Resident inspector, Comanche Peak S. D. Butler, Resident Inspectors Waterford 3 D. N. Graves, Resident Inspector, Comanche Peak J. Luehman, Office of Enforcement (via conference phone)
G. Dick, Project Manager, Office of Nuclear Reactor Regulation (via conference phone)
i
.
-
~4 ATTACHfiENT 2
.-
.,
.,
NRC ENFORCEMENT CONFERENCE ON FIREWATCH IRREGULARITIES
- .
'!
FEBRUARY 19, 1991 PAGE 1 0F 17
,
,
a
,
-. -
-
+,
-..,
,. -
,- _..
.
-.
-
.
-.
-
-_.
-
-
-.-
.-
.
._
- _.
.
.
.
AGENDA INTRODUCTION BACKGROUND MAINTENANCE SERVICES ORGANIZATION (MS0) INVESTIGATION MANAGEMENT RESPONSE TASK TEAM INVESTIGATION TASK TEAM FINDINGS CORRECTIVE & PREVENTIVE ACTIONS POTENTIAL 'cNERIC IMPLICATIONS CONLLUSIONS
PAGE 2 0F 17
.
-.
-
.
-
--
- -
BACKGROUND
-
.
o INITIAL ORGANIZATIONAL RESPONSIBILITIES FIRE PROTECTION MAINTAINS PROGRAM
-
RESPONSIBILITIES-BROWN AND ROOT SUPPLIED ROVING FIREWATCHES
-
THROUGH CONSTRUCTION.
-o ORGANIZATIONAL CHANGES IN SPRING 1990 TU ELECTRIC FIRE PROTECTION suPERVISCR
-
REPLACES CONTRACTOR-ROVING FIREWATCHES OBTAINED THROUGH MSO
-
NUMANCO (WESTINGHOUSE SUBSIDIARY) PROVIDES
-
,
ROVING FIREWATCH PERSONNEL PAGE 3 c I?
..
.
.. -
.
..
-.
.
-
-.
. -.
._- -
-
BACKGROUND (CONT'D).
-
.
>
CHANGES IN BACKSHIFTS IN AUGUST 1990 SUPERVISORS MOVED TO DAY SHIFT
-
o IDENTIFICATION OF IRREGULARITIES ROVING FIRE WATCH EXPRESSES CONCERN OVER
-
POSSIBLE IRREGULARITIES
. NATIONAL. FIRE AND MEDICAL (NFM) SUPPLEMENTS
-
FIRE PROTECTION SPJT CHECKS FOR IRREGULARITIES ON BACKSHIFTS AT FIRE PROTECTION REQUEST
,
NFM IDENTIFIES. MISSED LOG ENTRIES
-
.
PAGE 4 0F 17
,
J
-
,,
.
_
., -. _ _.. -. _
,, _ _
r
..,,,,
, -
MS0 INVESTIGATION
-
.
o INCLUDED MSO, WESTINGHOUSE, AND FIRE PROTECTION PERSONNEL o
PURPOSE CONFIRM IRREGULARITIES IDENTIFIED ON OCTOBER 5
-
DETERMINE EXTENT OF PROBLEM
-
o FIRE WATCH LOGS COMPARED TO SECURITY RECORDS
.
o RESULTS NUMEROUS IRREGULARITIES FOUND
-
SECOND ONE FORM ISSUED ON OCTOBER 19, UPGRADED
-
TO A PLANT INCIDENT REPORT (PIR), AND A TASK TEAM WAS ESTABLISHED PAGE E OF 17
.
.. _ - -.
.
-
. _.. -,.
.
.
.
._.,. _..
_
.
.
.
-
.
MANAGEMENT RESPONSE
-
.
o-IMMEDIATE ACTIONS
,
RELEASED FIREWATCHES WITH CONFIRMED
-
IRREGULARITIES
,
SUPERVISORS PLACED ON BACKSHIFTS
-
l HOURLY ROTATION OF FIREWATCH PERSONNEL
-
LIMITED THE DUTIES OF FIREWATCHES l
-
o NRC RESIDENT NOTIFIED PAGE 6 0F 17
-.
.
.
- -.
- -
.
.
.
.
.
.-.
._
-
-
MANAGEMENT RESP 0tiSE (CONT'D)
-
.
o SAFETEAM/ CORPORATE SECURITY INVESTIGATION INITIATED IN RESPONSE TO CONCERNS EXPRESSED BY RELEASED ROVING FIREWATCHES o
VICE PRESIDENT NUCLEAR OPERATIONS MET WITH RELEASED
.
'
FIREWATCH PERSONNEL l
!
PAGE 7 0F 17
-
,
. - - -
,-
. - - - -
- - _ _ _ - - _ _ - _ _ _ _ _ _ _ _ _
o
.
TASK TEAM INVESTIGATION
.
.
o OBJECTIVES IDENTIFY ROOT CAUSES AND CONTRIBUTING CAUSES
--
RECOMMEND CORRECTIVE ACTIONS
--
o COMPREHENSIVE SCOPE DEFINED BY FORMAL CHARTER
.
o MULTI-DISCIPLINED TEAM ORGANIZATIONS ASSOCIATED WITH ROVING FIREWATCH
-
IMPLEMENTATION
,
NUCLEAR OVERVIEW
-
CORPORATE SECURITY AND SAFETEAM
-
PAGE 8 0F 17
.
_ - - - _ _ _ _ _ _ _ _ _ _ _ _. _ _ _. _ _ _ - - - _ _ _
a r
s.-
.
..:.a,&2 a
-
.~
..m e_a
...ux...
-.
+
w e.
.a TASK TEAM FINDINGS
--
.
o NUMEROUS ADDITIONAL IRREGULARITIES IDENTIFIED -
MOST ON BACKSHIFT o
PLANT IMPACT
NO FIRES IN AFFECTED AREAS
-
THE CONFIRMED IRREGULARITIES DID NOT INVOLVE
-
REQUIRED COMPENSATION OTHER AREAS MAY HAVE BEEN AFFECTED
-
o INCONSISTENCIES AND WEAKNESSES IN REQUIREMENTS GUIDANCE, AND PRACTICES FOR FIREWATCHES STA-729, HAND 200K, AND CURRENT FIRE PROTECTION
-
SUPERVISOR INTERFRETATIONS GENERALLY CONSISTENT STA-729 WEAKNESSES
-
"
UNCONTROLLED HANDBOOK
-
.
PRACTICES NOT CONSISTENT WITH WRITTEN
-
'
GUIDANCE PAGE 9 0F.17
-. -.
-..
...
.. -..
.. - -
-
.-
..
..
.
.
.
-
.
.
_
._
.
.
.
.
.
TASK TEAM FINDINGS (CONT'D1
-
.
o TRAINING LACKED SPECIFICITY SUPERVISORS
-
FIREWATCHES
-
o OVERVIEW WEAKNESSE,
BACKSHIFT COVERAGE
-
-CONTRACT TURNOVER
-
SUPERVISORY PRACTICES AND OVERVIEW
-
,
PAGE 10 0F 17
,
m
,.,.-,,
,
--
.m.
.
., -.
,
,., - -,
,
- -
- - - - -
-
-
-
---
-
--__ - ----_ _--_ _ _ _
TASK TEAM FINDINGS (CONT'D)
<
.
o ROOT CAUSES ADEQUACY OF SUPERVISORY CONTROLS
-
CONFUSION ABOUT REQUIREMENTS
-
,
.
PAGE 11 6f 17 l
-
_
- - --
.
CORRECTIVE AND PREVENTIVE ACTIONS
-
.
o PERSONNEL 30-DAY SUSPEN!; ION FOR FIREWATCHES
-
30-DAY SUSPENSION FOR HUMANCO SUPERVISORS
-
WESTINGHOUSE AND TU ELECTRIC SUPERVISORY
-
CHANGES o
. SUPERVISORY CONTROLS AND OVERSIGHT BACKSHIFT COVERAGE
-
.
.
MORE INVOLVEMENT BY TU ELECTRIC FIRE
-
PROTECTION IN ROVING FIRE WATCHES RESPONSIBILITIES MORE CLEARLY DEFINED IN
-
STA-77.9 l
l PAGE 12 0F 17 L
.
.
.
.
-
.
-
--.
.
-
.
. - -
_.
CORRECTIVE AND PREVENTIVE ACTIONS (CONT'D1
..
.
e IMPROVEMENTS IN GUIDANCE MEMO BY FIRE PROTECTION TO MSO CLARIFYING
-
REQUIREMENTS REVISIONS TO STA-729
-
VICE PRESIDENT, NUCLEAR OPERATIONS MEMO ON
-
IMPORTANCE OF PROPER ENTRIES IN PLANT RECORDS o
TRAINING INTERIM TRAINING FOR FIREWATCHES.
-
INTERIM OJT FOR FIREWATCHES
-
INTERIM TRAINING F0I: SUPERVISORS
-
REVISIONS TO FORMAL TRAINING PROGRAM
-
PAGE 13 0F 17
.
_ - -.
.
. _ - _ _ - _ - _ _ _
CORRECTIVE AND PREVENTIVE ACTIONS (CONT'D)-
- -
.
o-RELATED ACTIONS
.
FIRE PROTECTION MEETING WITH UNIT 2 PERSONNEL
-
RESPONSIBLE FOR FIREWATCHES REVISION TO GET
-
COUNSELING OF NRi ON DEFICIENCY REPORTING
-
FIREWATCH MEETING WITH VICE PRESIDENT, NUCLEAR
-
OPERATIONS CONTRACT TURNOVER PROCEDURE STRENGTHENED
-
PAGE 14 0F 17
,
~.
..
-.
-
.
- - - - - - - - - - - - - -
_
-
- _ - _ - -
_
,
POTENTIAL GENERIC IMPLICATIONS
--
-
,
o OTHER NUMANCO ACTIVITIES SPECIFIC REVIEW 0F SECURITY ESCORTING SHOWED
-
SATISFACTORY PERFORMANCE OTHER ACTIVITIES-WITH POTENTIAL IMPACT
-
PROVIDED APPROPRIATE OVERVIEW o
OTHER FIRE PROTECTION ACTIVITIES
'
. AUDITS AND SURVEILLANCE DISCLOSED SATISFACTORY
-
PERFORMANCE
,
o ACTIVITIES ANALOG 0US TO ROVING FIREWATCHES OTHER ACTIVITIES REQDIRING " ROUNDS" INVOLVE
-
MORE TRAINING AND GVERVIEW W
o ANALOG 0US CONTRACTUAL ARRANGEMENTS
,
b
$
PAGE 15 0F 17 l
_ - _ -_ _ _-_ _ _ -
._ -
.
-. -
_
.
_ ___
. - - _ - _ _ _ - - _ -
--
.
POTENTIAL GENERIC IMPLICATIONS (CONT'D)
- <
.-
o TRAINING i
ACCREDITED PROGRAMS MORE COMPREHENSIVE
-
OTHER PROGRAMS GENERALLY INVOLVE ONG0ING
-
REVIEWS OF TASKS
o PERFORMANCE EXPECTATIONS
i PAGE 16 0F 17 l
..
.. -
..
.-
.
-
.
.
.
.
.,.
_ - - -
- - -. --
_ - - - _
_
_ - - _
_
_
.
'
,r
,
CONCLUSIONS
- =
.
o CPSES IDENTIFIED IRREGULARITIES o
COMPREHENSIVE INVESTIGATIONS CONDUCTED o
EXTENSIVE CORRECTIVE AND PREVENTIVE ACTIONS TAKEN f
o THOROUGH CONSIDERATION OF POTENTIAL GENERIC IMPLICATIONS PAGE 17 0F 17