IR 05000413/2025402

From kanterella
Jump to navigation Jump to search
Security Baseline Inspection Report 05000413/2025402 and 05000414/2025402
ML25325A089
Person / Time
Site: Catawba  
Issue date: 11/24/2025
From: Jannette Worosilo
NRC/RGN-II/DFFI
To: Wylie E
Duke Energy Carolinas
References
IR 2025402
Download: ML25325A089 (0)


Text

SUBJECT:

CATAWBA NUCLEAR STATION - SECURITY BASELINE INSPECTION REPORT 05000413/2025402 AND 05000414/2025402

Dear Ernest J. Wylie:

On November 19, 2025, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Catawba Nuclear Station and discussed the results of this inspection with you and other members of your staff. The results of this inspection are documented in the enclosed report.

No findings or violations of more than minor significance were identified during this inspection.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely, Jannette G. Worosilo, Chief Nuclear Security Branch Division of Fuels, Radiological Safety, and Security Docket Nos. 05000413 and 05000414 License Nos. NPF-35 and NPF-52

Enclosure:

As stated

Inspection Report

Docket Numbers:

05000413 and 05000414

License Numbers:

NPF-35 and NPF-52

Report Numbers:

05000413/2025402 and 05000414/2025402

Enterprise Identifier:

I-2025-402-0031

Licensee:

Duke Energy Carolinas, LLC

Facility:

Catawba Nuclear Station

Location:

York, SC

Inspection Dates:

November 17, 2025 to November 19, 2025

Inspectors:

J. Tornow, Physical Security Inspector

Approved By:

Jannette G. Worosilo, Chief

Nuclear Security Branch

Division of Fuels, Radiological Safety, and Security

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a security baseline inspection at Catawba Nuclear Station, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

List of Findings and Violations

No findings or violations of more than minor significance were identified.

Additional Tracking Items

None.

INSPECTION SCOPES

Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2201, Security Inspection Program for Commercial Nuclear Power Reactors. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.

SAFEGUARDS

71130.02 - Access Control

The inspectors evaluated the access control program through completion of the following inspection elements:

Access Control (1 Sample)

(1) TIER I: 02.01 (a,c,d,e), 02.02 (a-g), 02.04 (a,b,d,e), 02.05 (a), 02.06
(c) TIER II: 02.08
(e) TIER III: 02.09 Reviews

71130.09 - Security Plan Changes

The inspectors evaluated the security plan changes through completion of the following procedure elements:

Security Plan Changes (1 Sample)

(1) Since the last NRC baseline inspection of this program area, Security Plan Revision 30 to 31 was implemented. Based on Duke Energy's evaluation, and in accordance with 10 CFR 50.54(p)(2), the change(s) resulted in no decrease in safeguards effectiveness of the security plan and the revised security plan change(s) continues to meet the requirements of 10 CFR 73.55(b). The inspector conducted a review of the security plan change(s) to evaluate for a potential decrease in safeguards effectiveness of the security plan; however, this review does not constitute formal NRC approval of those change(s). Therefore, the change(s) remain subject to future NRC inspection in their entirety.

OTHER ACTIVITIES - BASELINE

71151 - Performance Indicator Verification The inspectors verified licensee performance indicators submittals listed below:

PP01: Protected Area Security Equipment Performance Index Sample (IP Section 02.17) (1 Sample)

The inspectors verified licensee performance indicator submittals listed below:

(1) November 1, 2024 through October 31, 2025

INSPECTION RESULTS

No findings were identified.

EXIT MEETINGS AND DEBRIEFS

The inspectors verified that no proprietary information was retained or documented in this report.

  • On November 19, 2025, the inspectors presented the security baseline inspection results to Ernest J. Wylie and other members of the licensee staff.

DOCUMENTS REVIEWED

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

AD-SY-ALL-0210

Site Access Controls

Rev. 13

AD-SY-ALL-0215

Security Search and Entry Processing

Rev. 17

AD-SY-ALL-0240

Security Key and Lock Controls

Rev. 3

AD-SY-ALL-0301

Nuclear Worker Unescorted Access Authorization Program

Rev. 12

71130.02

Procedures

CSD-SY-CNS-

251-01

CNS Security Emergency Access Control

Rev. 001

71130.02

Corrective Action

Documents

2552742

2544534

2567067

Operability

Evaluations

AD-SY-ALL-0170

CFR 50.54(p) Evaluation

6/26/25

71130.09

Procedures

AD-SY-ALL-0101

Security Plan Revision Process

Rev. 3

71151

Procedures

AD-PI-ALL-0700

Performance Indicators

Rev. 7