IR 05000413/2020401
| ML20328A243 | |
| Person / Time | |
|---|---|
| Site: | Catawba |
| Issue date: | 11/23/2020 |
| From: | James Shehee Division of Reactor Safety II |
| To: | Wylie E Duke Energy Carolinas |
| References | |
| IR 2020401 | |
| Download: ML20328A243 (3) | |
Text
November 23, 2020
(U) Mr. Ernest Wylie Catawba Nuclear Station Duke Energy Carolinas Mail Code: CN01SC 4800 York, SC 29745
(U) SUBJECT: CATAWBA NUCLEAR STATION - SECURITY BASELINE INSPECTION REPORT 05000413/2020401 AND 05000414/2020401
(U)
Dear Mr. Wylie:
(U) On October 21, 2020, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Catawba Nuclear Station. On October 28, 2020, the NRC inspectors discussed the results of this inspection with T. Simril and other members of your staff. The results of this inspection are documented in the enclosed report.
(U) No NRC-identified or self-revealing findings were identified during this inspection.
(U) A licensee-identified violation which was determined to be of very low security significance is documented in this report. We are treating this violation as a non-cited violation (NCV)
consistent with Section 2.3.2 of the Enforcement Policy.
(U) If you contest the violation or the significance or severity of the violation documented in this inspection report, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the U.S. Nuclear Regulatory Commission, ATTN:
Document Control Desk, Washington, DC 20555-0001; with copies to the Regional Administrator, Region II; the Director, Office of Enforcement; the Director, Office of Nuclear Security and Incident Response; and the NRC Resident Inspector at Catawba Nuclear Station.
(U) The enclosed report contains Security-Related Information, so the enclosed report will not be made publicly available in accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390(d)(1). If you choose to provide a response that contains Security-Related Information, please mark your entire response Security-Related Information-Withhold from public disclosure under 10 CFR 2.390 in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). The NRC is waiving the affidavit requirements for your response in accordance with 10 CFR 2.390(b)(1)(ii). (U)
Sincerely,
/RA by Jared Justice Acting for/
(U) James C. Shehee, Chief Plant Support Branch Division of Reactor Safety
(U) Docket Nos. 05000413 and 05000414 License Nos. NPF-35 and NPF-52
(U) Enclosure:
As stated
Brian Bernard Director, Nuclear Security Services Duke Energy Carolinas, LLC 526 South Church Street - EC5ZD Charlotte, NC 28202-1802
ML20328A243 cover letter only Entire Report:
SUNSI Review Non-Sensitive Sensitive Publicly Available Non-Publicly Available OFFICE RII/DRS/PSB RII/DRP/PB1 RII/DRS/PSB
NAME J. Wallo J. Worosilo J. Shehee
DATE 11/20/2020 11/23/2020 11/23/2020