IR 05000413/2008007
| ML083640027 | |
| Person / Time | |
|---|---|
| Site: | Catawba |
| Issue date: | 12/29/2008 |
| From: | Moorman J NRC/RGN-II/DRP/RPB1 |
| To: | Morris J Duke Energy Carolinas, Duke Power Co |
| References | |
| IR-08-007 | |
| Download: ML083640027 (4) | |
Text
December 29, 2008
SUBJECT:
CATAWBA NUCLEAR STATION TI 2515/171 VERIFICATION OF IMPLEMENTATION OF B.5.b PHASE 2 AND 3 MITIGATING STRATEGIES INSPECTION REPORT 05000413/2008007 AND 05000414/2008007
Dear Mr. Morris:
On December 5, 2008, the U. S. Nuclear Regulatory Commission (NRC) completed an inspection at your Catawba Nuclear Station Units 1 and 2. The enclosed inspection report documents the inspection findings, which were discussed on December 5, 2008, with you and other members of your staff.
The inspection examined activities conducted under your licenses as they relate to the implementation of B.5.b Phase 2 and 3 mitigating strategies, your compliance with the Commissions rules and regulations, and with the conditions of your licenses. Within these areas, the inspection involved examination of selected procedures and representative records, observations of activities, and interviews with personnel.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system, ADAMS. DEC 2 ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, because of the security-related concerns contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letters enclosure will not be available for public inspection.
Sincerely,
/RA/
James H. Moorman, Chief Reactor Projects Branch 1 Division of Reactor Projects
Docket Nos.: 50-413, 50-414 License Nos.: NPF-35 and NPF-52
Enclosure: Inspection Report 05000413/2008007 and 05000414/2008007 w/Attachment: Supplemental Information
cc w/encl: (See page 3) DEC 3 cc w/Encl:
Randy D. Hart Regulatory Compliance Manager Duke Power Company, LLC d/b/a Duke Energy Carolinas, LLC CN01RC 4800 Concord Road York, SC 29745-9635
Lisa F. Vaughn Associate General Counsel Duke Energy Corporation 526 South Church Street-EC07H Charlotte, NC 28202
Kathryn B. Nolan Senior Counsel Duke Energy Corporation 526 South Church Street-EC07H Charlotte, NC 28202
R. L. Gill, Jr.
Manager Nuclear Regulatory Issues and Industry Affairs Duke Power Company, LLC d/b/a Duke Energy Carolinas, LLC 526 South Church Street Charlotte, NC 28201-0006
cc w/o Encl:
David A. Repka Winston Strawn LLP 1400 L Street NW Washington, DC 20005
Henry J. Porter Assistant Director Division of Radioactive Waste Mgmt.
S.C. Department of Health and Environmental Control 2600 Bull Street Columbia, SC 29201
Elizabeth McMahon Assistant Attorney General S.C. Attorney General's Office P.O. Box 11549 Columbia, SC 29211
Vanessa Quinn Federal Emergency Management Agency 500 C Street, SW Room 840 Washington, DC 20472
Peggy Force Assistant Attorney General State of North Carolina P.O. Box 629 Raleigh, NC 27602
_________________________
X SUNSI REVIEW COMPLETE OFFICE RII:DRS RII:DRP HQ:NRR HQ:NRR
SIGNATURE
/RA/
/RA via email/
/RA via email/
/RA via email/
NAME RBERRYMAN ASABISCH RCRLENJAK DNELSON
DATE 12/15/2008 12/12/2008 12/17/2008 12/15/2008 12/ /2008
E-MAIL COPY?
YES NO YES NO YES NO YES NO YES NO YES NO