IR 05000387/1996003
| ML17158B799 | |
| Person / Time | |
|---|---|
| Site: | Susquehanna |
| Issue date: | 09/09/1996 |
| From: | Eugene Kelly NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Byram R PACIFICORP (FORMERLY PACIFIC POWER & LIGHT) |
| References | |
| NUDOCS 9609180386 | |
| Download: ML17158B799 (5) | |
Text
CATEGORY
REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
~i ACCESSION NBR:9609180386 DOC.DATE: 96/09/09 NOTARIZED:
NO DOCKET t
FACIL:50-387 Susquehanna Steam Electric Station, Unit 1, Pennsylva 05000387 50-388 Susquehanna Steam Electric Station, Unit 2, Pennsylva 05000388 AUTH.NAME AUTHOR AFFILIATION KELLY,E.M.
Region 1 (Post 820201)
RECIP.NAME RECIPIENT AFFILIATION BYRAMIR.G.
PacifiCorp (formerly Pacific Power 6 Light)
SUBJECT:
Ack receipt of 960809 ltr informing NRC of steps taken to C
correct violations noted in insp repts 50-387/96-03 a
50-388/96-03.
A DISTRIBUTION CODE:
IE06D COPIES RECEIVED:LTR I ENCL II SIZE:
T TITLE: Environ 6 Radiological (50 DKT)-Insp Rept/Notice of Violation Respons E
NOTES:
05000387 G
RECIPIENT ID CODE/NAME PDl-2 PD INTERNAL:
PB NUDOCS-ABSTRACT OGC/HDS2 RNAL: NOAC COPIES LTTR ENCL
1
2
1
1
1
1
1 RECIPIENT ID CODE/NAME POSLUSNYIC AEOD/TTC NMSS/SFPO 06F18 NRR/DRPM/PERB OE DIR RGN1 FILE
NRC PDR COPIES LTTR ENCL
1
1
1
1
1
1
1
,0 D
C U
M E
g/>
TOTAL NUMBER OF COPIES REQUIRED:
LTTR
ENCL NOTE TO ALL "RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE!
CONTACT THE DOCUMENT CONTROL DESK,
SUBJECT:
INSPECTION REPORT NOS. 50-387/96-03 AND 50-388/96-03 (REPLY)
Dear Mr. Byram:
This refers to your August 9, 1996, correspondence in response to our letter, dated June 10, 1996.
The correspondence dealt with three violations identified during the performance of an engineering inspection documented in NRC Inspection Report 50-387/96-03 and 50-388/96-03.
The violations concerned the failure of your organization to correct longstanding deficiencies in the reactor water cleanup ventilation area leak detection and seismic monitoring systems, a failure to comply with the ACTION statement contained in the seismic monitoring system plant technical specification and a failure to update the plant final safety analysis report.
We have performed a summary review of your response in accordance with NRC Inspection Manual 92903 and have determined the corrective actions outlined in your August 9, 1996, letter are appropriate.
We willfurther review the effectiveness of these actions in a future inspection.
We appreciate your cooperation.
Sincerely, Eugene M. Kelly, Chief Systems Engineering Branch Division of Reactor Safety Docket Nos.
50-387, 50-388 g~Pgg~g 9609i80386 960'909 PDR ADOCK 05000387
Mr. Robert CC:
G. T. Jones, Vice President
- Nuclear Engineering G. Kuczynski, Plant Manager J. M. Kenny, Supervisor, Nuclear Licensing G. D. Miller, Manager - Nuclear Engineering R. R. Wehry, Nuclear Licensing M. M. Urioste, Nuclear Services Manager, General Electric C. D. Lopes, Manager - Nuclear Security W. Burchill, Manager, Nuclear Safety Assessment H. D. Woodeshick, Special Office of the President J. C. Tilton, III, Allegheny Electric Cooperative, Inc.
Commonwealth of Pennsylvania
Mr. Robert Distribution:
Region I Docket Room (with concurrences)
Nuclear Safety Information Center (NSIC)
K. Gallagher, DRP NRC Resident Inspector PUBLIC W. Dean, OEDO C. Poslusny, Project Manager, NRR J. Stolz, PDI-2, NRR Inspection Program Branch, NRR (IPAS)
DRS File DOCUMENT NAME: A:SUS9603.REP To receive a copy of this document, indicate In the bosn
"C
~ Co y without attachment/enclosure E
Copy with attachment/enclosure
"N
~ No copy OFFICE ATE RI/DRS KKOLACZYK 09/05/96 RI/9 EK 09/"
/96 09/
/96 OFFICIAL RECORD COPY 09/
/96 09/
/96