IR 05000387/1990081
| ML17157B965 | |
| Person / Time | |
|---|---|
| Site: | Susquehanna |
| Issue date: | 08/11/1992 |
| From: | Bettenhausen L NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Keiser H PENNSYLVANIA POWER & LIGHT CO. |
| References | |
| NUDOCS 9208250106 | |
| Download: ML17157B965 (3) | |
Text
Docket Nos.
50-387 50-388
>>I'
X iSSZ Mr. Harold Senior Vice President - Nuclear Pennsylvania Power &Light Company 2 North Ninth Street Allentown, Pennsylvania 18101
Dear Mr. Keiser:
SUBJECT:
INSPECTION NOS. 50-387/90-81; 50-388/90-81 This refers to your letter dated May 15, 1992, in response to our letter dated February 22, 1991.
Thank you for informing us of the corrective and preventive actions documented in your letter.
These actions willbe examined during a future inspection of your licensed program.
Your cooperation with us is appreciated.
Sincerely, Lee H. Bettenhausen, Chief Operations Branch Division of Reactor Safety CC:
J. M. Kenny, Nuclear Licensing H. G. Stanley, Superintendent of Plant-SSES R. G. Byram, Vice President, Nuclear Operations R. M. Peal, Supervisor, Nuclear Compliance H. D. Woodeshick, Special Office of the President J. C. Tilton, III, Allegheny Electric Cooperative, Inc.
Public Document Room (PDR)
Local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
K. Abraham, PAO (2) (w/copy of letter dtd 5/15/92)
NRC Resident Inspector (w/copy of letter dtd 5/15/92)
Commonwealth of Pennsylvania (w/copy of letter dtd 5/15/92)
OFFICIALRECORD COPY G:SUS9081R 9208250106 9208i i PDR ADOCK 05000387 G
)/
~~)l (
Mr. Harold bcc:
Region I Docket Room (with concurrences)
L. Bettenhausen, DRS E. Wenzinger, DRP J. White, DRP DRS/EB SALP Coordinator J. Trapp, DRS J. Noggle, DRSS R. Lobel, OEDO J. Raleigh, NRR, Project Manager N. Blumberg, DRS D. Caphton, DRS DRS Files (2)
RI:DRS Caphton/
mg 08/06/92 RI:DRS Blumberg 08/ /92 RI:DRS Be e hausen 08///492 OFFICIALRECORD COPY G:SUS9081R