IE Inspec Rept 50-374/78-17 on 781023 During Which No Items of Noncompliance Were Noted.Major Areas Inspected Incl: Previously Identified Noncompliance Item & Pipe Storage Area
ML20204D490
Person / Time
Site: LaSalle Constellation icon.png
Issue date: 11/16/1978
From: Danielson D, Eric Lee
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To:
Shared Package
ML20204D487 List:
References
50-374-78-17, NUDOCS 7812200308
Download: ML20204D490 (2)


Text

]

.

O.

U.S.iNUCLEAR REGULATORY COMMISSION OFFICE 0F INSPECT!'N AND ENFORCEMENT

REGION III

Report No. 50-374/78-17 Docket No. 50-374'

License No. CPPR-100 Licensee: Commonwealth Edison Company P. 0.' Box 767 Chicago, IL 60690 Facility Name: La Salle County Nuclear Station, Unit 2

.-

.

'

Inspection At: La Salle Site, Seneca, IL Inspection Conducted: October 23, 1978 h wa h~

/6/7b Inspector:

. W! K. Lee

/

-.

W l

.. Danielson, Chief

////d/7[

Approved By: _ Engineering Support Section

.

'

- Inspection Summary Inspection on October 23, 1978 (Report No. 50-374/78-17)

Area Inspected: Previously identified noncompliance item and pipe

-

storage area. The inspection involved a total of four onsite inspector-r hours by one NRC inspector. -

-

Results: No items of noncompliance or deviations were identified.

,

!

l

,

781220'0 M 3

.

,P,

.-..y-4

-,

.e m-_o y

-w.-

-~,..,-%-+-,ar_,.n,,-

,,,-,,e.es...c,m-n-

-,mm_y.--,m_

. _ _,, _,,,,,

e-p r,..,-n,,,,

n

.

..

.

-

,,

.

')

DETAILS Persons Contacted Principal Licensee Employees L. J. Burke, Site Project Superintendent

  • J.

R. Kodrick, QA Engineer

  • R.

J. Legner, QA Supervisor

  • B.

J. McAndrew, Project Mechanical Supervisor

  • B. Rose, Lead Engineer B. L. Wood, QA Engineer
  • Denotes those present at the exit interview.

Licensee Action on Previous Inspection Findings (Closed) Noncompliance Item (50-374/78-11-05): Monitoring of weld interpass. temperatures by Vogt and Conant Company (V&C):

The inspector reviewed V6C nonconformance Renort No.'5; Commonwealth Ediosn Company nonconformance Report No. 194; NDE reports and the revised inspection report form. The inspector determined that the corrective action is adequate and nonconformance reports (NCRs)

I are properly closed out, except that the corrective action verification section of V&C NCR No. 5 was not signed off.

The inspector was informed that the original NCR in the contractor's office was signed and arrangement is being made to have all the contractor's -

records transferred to the site for permanent storage.

Functional or Program Areas Inspected Pipe Storage Ares

,

The inspector toured the outdoor piping storage area, Unit 2 Drywell.

and Reactor Building.

It was determined that:

(1) spools are identified; (2) spools are resting on dunnage and (3) ends are covered i

except a couple of spools in the Reactor Building. Corrective action was initiated by the' licensee prior to the conclusion of the j

inspection.

No items of noncompliance or deviations were identified.

Exit Interview

,

The inspector met with the licensee representatives-(denoted under Persons Contacted) at the conclusion of the inspection on October 23, 1978. The inspector summarized the results of the inspection concerning the area = reviewed.