O.
U.S.iNUCLEAR REGULATORY COMMISSION OFFICE 0F INSPECT!'N AND ENFORCEMENT
REGION III
Report No. 50-374/78-17 Docket No. 50-374'
License No. CPPR-100 Licensee: Commonwealth Edison Company P. 0.' Box 767 Chicago, IL 60690 Facility Name: La Salle County Nuclear Station, Unit 2
.-
.
'
Inspection At: La Salle Site, Seneca, IL Inspection Conducted: October 23, 1978 h wa h~
/6/7b Inspector:
. W! K. Lee
/
-.
W l
.. Danielson, Chief
////d/7[
Approved By: _ Engineering Support Section
.
'
- Inspection Summary Inspection on October 23, 1978 (Report No. 50-374/78-17)
Area Inspected: Previously identified noncompliance item and pipe
-
storage area. The inspection involved a total of four onsite inspector-r hours by one NRC inspector. -
-
Results: No items of noncompliance or deviations were identified.
,
!
l
,
781220'0 M 3
.
,P,
.-..y-4
-,
.e m-_o y
-w.-
-~,..,-%-+-,ar_,.n,,-
,,,-,,e.es...c,m-n-
-,mm_y.--,m_
. _ _,, _,,,,,
e-p r,..,-n,,,,
n
.
..
.
-
,,
.
')
DETAILS Persons Contacted Principal Licensee Employees L. J. Burke, Site Project Superintendent
- J.
R. Kodrick, QA Engineer
- R.
J. Legner, QA Supervisor
- B.
J. McAndrew, Project Mechanical Supervisor
- Denotes those present at the exit interview.
Licensee Action on Previous Inspection Findings (Closed) Noncompliance Item (50-374/78-11-05): Monitoring of weld interpass. temperatures by Vogt and Conant Company (V&C):
The inspector reviewed V6C nonconformance Renort No.'5; Commonwealth Ediosn Company nonconformance Report No. 194; NDE reports and the revised inspection report form. The inspector determined that the corrective action is adequate and nonconformance reports (NCRs)
I are properly closed out, except that the corrective action verification section of V&C NCR No. 5 was not signed off.
The inspector was informed that the original NCR in the contractor's office was signed and arrangement is being made to have all the contractor's -
records transferred to the site for permanent storage.
Functional or Program Areas Inspected Pipe Storage Ares
,
The inspector toured the outdoor piping storage area, Unit 2 Drywell.
and Reactor Building.
It was determined that:
(1) spools are identified; (2) spools are resting on dunnage and (3) ends are covered i
except a couple of spools in the Reactor Building. Corrective action was initiated by the' licensee prior to the conclusion of the j
inspection.
No items of noncompliance or deviations were identified.
Exit Interview
,
The inspector met with the licensee representatives-(denoted under Persons Contacted) at the conclusion of the inspection on October 23, 1978. The inspector summarized the results of the inspection concerning the area = reviewed.
i
--2 -
'
-.