IR 05000368/1985022

From kanterella
Jump to navigation Jump to search
Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp 50-368/85-22.Ack Ltr Delayed Due to Administrative Oversight.Corrective Action Reviewed in Insp Rept 50-368/85-25
ML20199J320
Person / Time
Site: Arkansas Nuclear  
Issue date: 06/24/1986
From: Gagliardo J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Campbell G
ARKANSAS POWER & LIGHT CO.
Shared Package
ML20199J324 List:
References
NUDOCS 8607080318
Download: ML20199J320 (1)


Text

<

>

.-

In Reply Refer To:

Dockets: 50-368/85-22 Arkansas Power & Light Company ATTN: Mr. Gene Campbell Vice President, Nuclear Operations P. O. Box 551 Little Rock, Arkansas 72203

Dear Mr. Campbell:

Thank you for your letter of September 19, 1985, in response to our letter, and Notice of Violation dated August 20, 1985. We have reviewed your reply and find it responsive to the concerns raised in our Notice of Violation. Due to an administrative oversight this acknowledgement letter was delayed. The implementation of your corrective actions was reviewed and this item was closed in NRC Inspection Report 368/85-25.

Sincerely,

"oristnal S'""#

y, E. GAct.lARDO?'

J. E. Gagliardo, Chief Reactor Projects Branch

.

cc:

J. M. Levine, Director, Site Nuclear Operations Arkansas Nuclear One P. O. Box 608 Russellville, Arkansas 72801 Arkansas Radiation Control Program Director bec to DMB (IE01)

bec distrib. by RIV:

RPB Resident Inspector R.D. Martin, RA EP&RPB SectionChief(RPB/B)

D. Weiss, LFMB (AR-2015)

RIV File E. Johnson (DRSP)

MIS SYSTEM RSTS Operator RPk RPB RPB

/

MEMurphy DRH er JEGag prdo 6/A0/86 6/ /86 6/23/

8607090318 860624

{DR ADOCK 05000368

[ EO)

PDR