U.S. NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMENT
REGION III
Report No. 50-368/79-11
.
Docket No. 50-368 License No. NPF-6 Safeguards Group No. IV Licensee: Arkansas Power and Light Company Sixth and Pine Streets Pine Bluff, Arkansas 71601 Facility Name: Arkansas Nuclear One-Unit 2 Inspection At: Arkansas Nuclear One Site - Russellville, AR Inspection Conducted: May 9-11, 1979
$N5
? '
Inspectors:
A. G. Finley!
M/// 7
~
(Date)
f f'-E J y L
o/_ A'//P J. P. Patterson
, /, M (Date)
. f. X44
-/
i Approved By:
J. A. Hind, Chief
.5 /N / 7 'T Safeguards Branch (Date)
Inspection Sum =arv Unannounced inspection on May 9-11, 1979 (Recort No. 50-368/79-11 Areas Inspected: Nuclear material control and accounting including facility organization and operation; measurement and controls; shipping and receiving; storage and internal control; inventory and inventory verification; records and reports; management of material control system and review of a previous item of noncompliance.
The inspection involved 32 inspector-hours onsite and 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> at the Corporate office in Little Rock for a total of 36 inspector-hours by two NRC inspectors.
Results: Of the eight areas inspected no apparent items of non-compliance or deviations were identified.
(Details: Part 2.790(d) Information)
2311 003 0 62 6 0;;t37 t