December 23, 2015

SUBJECT:

EDWIN I. HATCH NUCLEAR PLANT - U.S. NUCLEAR REGULATORY COMMISSION EMERGENCY PREPAREDNESS INSPECTION REPORT 05000321/2015502 AND 05000366/2015502

Dear Mr. Vineyard:

On December 11, 2015, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at your Edwin I. Hatch Nuclear Plant, Units 1 and 2. The enclosed inspection report (IR) documents the inspection results that were discussed on December 10, 2015, with you and members of the plant staff.

No findings were identified during this inspection.

In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public inspections, exemptions, requests for withholding, of the NRC's "Agency Rules of Practice and Procedure," a copy of this letter, its Enclosure, and your response if any, will be available electronically for public inspection in the NRC Public Document Room, or from the Publicly Available Records (PARS) component of NRC's Documents Access and Management System (ADAMS); accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

Brian R. Bonser, Chief

Plant Support Branch 1

Division of Reactor Safety

Docket Nos. 50-321 and 50-366 License Nos. DPR-57 and NPF-5

Enclosure:

NRC IR 05000321/2015502 and 05000366/2015502 w/Attachment:

Supplementary Information

REGION II==

Docket Nos:

05000321 and 05000366

License Nos:

DPR-57 and NPF-5

Report Nos:

05000321/2015502 and 05000366/2015502

Licensee:

Southern Nuclear Operating Company, Inc.

Facility:

Edwin I. Hatch Nuclear Plant

Location:

Baxley, GA

Dates:

December 7-11, 2015

Inspectors:

Steven Sanchez, Senior Emergency Preparedness Inspector

Christopher Fontana, Emergency Preparedness Inspector

Wade Loo, Senior Health Physicist Inspector

Curtis Rapp, Senior Project Engineer

Approved by:

Brian R. Bonser, Chief Plant Support Branch 1 Division of Reactor Safety

SUMMARY

Inspection Report (IR) 05000321/2015502 and 05000366/2015502; 12/7/2015 - 12/11/2015;

Edwin I. Hatch, Units 1 and 2; Exercise and Baseline Inspection

This report covers an announced inspection by two emergency preparedness inspectors, one senior project engineer, and one senior health physicist. No findings were identified. The NRCs program for overseeing the safe operation of commercial nuclear power reactors is described in NUREG-1649, Reactor Oversight Process, Revision 5.

REPORT DETAILS

REACTOR SAFETY

Cornerstone: Emergency Preparedness

1EP1 Exercise Evaluation

a. Inspection Scope

The onsite inspection consisted of the following review and assessment:

  • The adequacy of the licensees performance in the biennial exercise, conducted on December 9, 2015, was reviewed and assessed regarding the implementation of the Risk Significant Planning Standards in 10 CFR 50.47(b)(4), (5), (9), and (10); which address emergency classification, offsite notification, radiological assessment, and protective action recommendations, respectively.
  • Other performance areas, such as the emergency response organizations (ERO)recognition of abnormal plant conditions; command and control, intra-and inter-facility communications; prioritization of mitigation activities; utilization of repair and field monitoring teams; interface with offsite agencies; and the overall implementation of the emergency plan (E-Plan) and its implementing procedures.
  • The post-exercise critique process and the presentation to the licensee's senior management conducted on December 9-10, 2015, to evaluate the licensees self-assessment of its ERO performance during the exercise, and to ensure compliance with 10 CFR Part 50, Appendix E, Subsection IV.F.2.g.

The inspectors reviewed various documents, which are listed in the Attachment. The inspectors also attended the FEMA-sponsored public meeting on December 11, 2015.

This inspection activity satisfied one inspection sample for the exercise evaluation on a biennial basis.

b. Findings

No findings were identified.

1EP4 Emergency Action Level and Emergency Plan Changes

a. Inspection Scope

Since the last NRC inspection of this program area, multiple revisions have been made to the Radiological Emergency Plan and its implementing procedures. The licensee determined that, in accordance with 10 CFR 50.54(q), the Plan continued to meet the requirements of 10 CFR 50.47(b), and Appendix E to 10 CFR Part 50. The inspectors reviewed the revisions, and sampled implementing procedure changes to evaluate potential reductions in the effectiveness of the Plan. As this review was not documented in a Safety Evaluation Report, and does not constitute formal NRC approval of the changes, these changes remain subject to future NRC inspection in their entirety.

The inspection was conducted in accordance with NRC Inspection Procedure (IP)71114, Attachment 04, Emergency Action Level and Emergency Plan Changes. The applicable planning standards of 10 CFR 50.47(b), and its related requirements in 10 CFR Part 50, Appendix E, were used as reference criteria.

The inspectors reviewed various documents, which are listed in the Attachment to this report. This inspection activity satisfied one inspection sample for the emergency action level, and E-Plan changes on an annual basis.

b. Findings

No findings were identified.

1EP8 Exercise Evaluation - Scenario Review

a. Inspection Scope

Prior to the inspection activity, the inspectors conducted an in-office review of the

exercise objectives and scenario submitted to the NRC using IP 71114.08, Exercise

Evaluation - Scenario Review, to determine if the exercise would test major elements

of the E-Plan as required by 10 CFR 50.47(b)(14).

The inspectors reviewed various documents, which are listed in the Attachment to this report. This inspection activity satisfied one inspection sample for the exercise valuation on a biennial basis.

b. Findings

No findings were identified.

OTHER ACTIVITIES

4OA1 Performance Indicator Verification

a. Inspection Scope

The inspectors sampled licensee submittals relative to the performance indicators (PIs)listed below for the period October 1, 2014, through September 30, 2015. To verify the accuracy of the PI data reported during that period, PI definitions and guidance contained in Nuclear Energy Institute 99-02, Regulatory Assessment Performance Indicator Guideline, Revision 7, was used to confirm the reporting basis for each data element.

Emergency Preparedness Cornerstone

  • Drill/Exercise Performance (DEP)
  • Emergency Response Organization (ERO) Readiness
  • Alert Notification System (ANS) Reliability

For the specified review period, the inspectors examined data reported to the NRC, procedural guidance for reporting PI information, and records used by the licensee to identify potential PI occurrences. The inspectors verified the accuracy of the PIs for ERO and DEP through review of a sample of drill and event records. The inspectors reviewed selected training records to verify the accuracy of the PI for ERO drill participation for personnel assigned to key positions in the ERO. The inspectors verified the accuracy of the PI for ANS reliability through review of a sample of the licensees records of periodic system tests. The inspectors also interviewed the licensee personnel who were responsible for collecting and evaluating the PI data. Licensee procedures, records, and other documents reviewed within this inspection area, are listed in the

.

This inspection satisfied three inspection samples for PI verification on an annual basis.

b. Findings

No findings were identified.

4OA6 Meetings, Including Exit

On December 10, 2015, the inspection team presented the inspection results to Mr. D. Vineyard and other members of the plant staff. The inspectors confirmed that no proprietary information was provided during the inspection.

ATTACHMENT: Supplementary Information

SUPPLEMENTARY INFORMATION

KEY POINTS OF CONTACT

Licensee personnel

B. Anderson, Radiation Protection Manager
A. Belcher, Nuclear Oversight Manager
G. Brinson, Maintenance Director
J. Calhoun, Fleet Drill & Exercise Coordinator
R. Clark, I&C Manager
R. Collings, Fleet Emergency Preparedness
C. Collins, Licensing Supervisor
B. Duvall, Chemistry Manager
A. Giancatarino, Engineering Director
G. Johnson, Regulatory Affairs Director
D. Komm, Operations Director
K. Long, Work Management Director
J. Major, Licensing Engineer
L. Mansfield, Fleet Emergency Preparedness Director
A. Meadows, Security Operations Manager
J. Merritt, Security Manager
D. Moore, Emergency Preparedness Specialist
S. Odom, Fleet Emergency Preparedness Manager
R. Outler, Emergency Preparedness Supervisor
C. Prandini, Licensing Engineer
R. Spring, Plant Manager
P. Swinson, Information Technology Manager
M. Torrance, Nuclear Oversight Manager
K. Underwood, Performance Improvement Manager
D. Vineyard, Site Vice President
C. Vonier, Shift Operations Manager
A. Wheeler, Site Projects Manager

LIST OF DOCUMENTS REVIEWED