f U.S. NUCLEAR REGULATORY COMMISSION
REGION III
r Report No. 50-358/82-04 Docket No. 50-358 License No. CPPR-88 Licensee: Cincinnati Gas and Electric Company 139 East 4th Street j
Cincinnati, OH 45201 Facility Name:
Wm. H. Zimmer Power Station Inspection At: Zimmer Site, Moscow, OH Sargent & Lundy Engineers (S&L), Chicago, IL General Electric Company (GE), San Jose, CA
,
Inspection Conducted: March 1-12, 1982 at the site March 17, 1982 at S&L
<
March 24-25, 1982 at GE
>
Inspector:
I. T. Yin
/#
-
~
b
/
n j
/
a W
Accompanying Personnel:p(Marp ittle
.
/
24-25, 1982 only)
jh
n!
Approved By:
D.
. Danielson, Chief Materials and Processes Section
,
Inspection Summary
,
Inspection on March 10-12, 17, and 24-25, 1982 (Report No. 50-358/82-04)
Areas Inspected: Review of the upgraded piping suspension system installa-tion and inspection program.
Inspection of GE recirculation loop piping design control and snubber qualification test data. Followup of previously identified noncompliance and unresolved items. The inspection involved a total of 32 inspector-hours onsite, in the licensee. design engineering corporate offices by one NRC inspector.
Results: Of the areas inspected, no apparent item of noncompliance was identified.
._
0WO g20 50.3
.
.
__.
.
-._
-
.
DETAILS Persons Contacted Inspection at the' Site on March 1-12, 1982-Cincinnati Gas and Electric Company (CG&E)
- H. R. Sager, QA Manager
- D.
J. Schulte, Director, QAE=
- D.
Frederick, Director, Nuclear Projects
.
,
!
J. B. Vorderbruggen, Lead Mechanical Engineer - Pipe Supports
- R. N. Taylor, Quality Engineer
- F. K. Pfeifer, Quality Engineer
- K.
M. Cater, Engineer Sargent and Lundy Engineers (S&L)
!
- T. J. Daley, Site Engineering Manager J. L. Vagt, MDD Representative-l Henry J. Kaiser Company (HJK)
- N. Vitale, QE Manager USNRC - Region III
- D.
R. Hunter, Chief, RPS-2
,
j
- F. Christianson, Resident Inspector
- Denotes those attending the exit interview on March 12, 1982.
.
Inspection at S&L on March 17, 1982 CG & E D. J. Frederick, Director, Special Project, NED R. N. Taylor, Quality Engineer / Pipe Support, QAD i
S&L R. F. Scheibel, Project Director
'
R. J. Pruski, Project Manager
,
'
E. B. Branch, Mechanical Design Director G. T. Kitz, Head, EMD Division
!
S. G. Carlson, Mechanical Project Engineer i
'
R.-L. Krawczyk, EMD Project Engineer G. Kolodziejczak, MDD Project Supervisor G. S. Sandhu, MDD Section Leader A.
W.' Szechowycz, PMD Project Engineer
,
f I
+m
_
_
.
S. A. Boline, Supervisor, MDD A. M. Chaudhary, SE LaSalle A. P. Abalos, MDD Project Leader T. A. McKenna, Sr. Structural Project Engineer EE J. R. Pobre, Senior Engineer S. L. James III, Senior Project Engineer Inspection at GE on March 24-25, 1982 CG & E R. N. Taylor, Quality Engineer / Piping Support F. J. Svetkovich, Director, Nuclear Project EE S. L. James, III, Senior Project Engineer M. D. Potter, Senior Engineer, Piping Design E. O. Swain, Manager, Piping Design J. R. Pobre, Senior Engineer, Piping Design D. L. Murray, Manager, Mechanical Design E. Urata, Licensing D. J. Robane, Licensing R. J. Velancia, Audit Coordinator G. L. Devius, SED Program Manager C. A. Cameron, Safety and Licensing J. L. Thompson, Manager, Piping Analysis J. Major, Manager, Piping Equipment Design P. Binesh, Design Engineer J. A. Kahermanes, Senior Engineer NPSD-QA Licensee Action on Previously Identified Items (Closed) Unresolved Item (358/78-10-07): The INS mechanical snubber qualification records were not available for review at the site.
During a meeting held with the licensee representatives, the inspector was informed that there will not be any INS snubbers installed in any safety-related systems. The previously installed INS snubbers had been or will be removed from the piping systems.
i (Closed) Noncompliances (358/78-18-01; 358/78-18-08; 358/79-37-01):
,
The licensee hanger and snubber inspection program appears to be inadequate in that repetitive nonconformances were identified, and that none of the installations has received final inspection since 1978.
Among the installed safety related pipe suspension systems, to the date of this inspection, less than 18 percent received final QC-inspection signoff.
The inspector reviewed the latest licensee program upgrade (see Paragraph 1 of the report) and considered it to be acceptable.
Followup on the licensee's new program implementation is planned by the inspector.
,
- _ _ -.
.
. -
-
-
.
(Closed) Unresolved Item (358/78-18-05): Questionable A-E hanger and restraint system design. Based on NRC-RIII request, the NRC-RIV Vendor Inspector Branch personnel performed inspections at S&L. The item was closed in NRC-RIV Inspection Report No. 99900507/81-04.
(Closed) Open Item (358/79-11): Status of procurement of PSC snubbers, their replacement of INS snubbers, and installation procedure. The
inspector reviewed the present upgraded pipe suspension system installation
{
and inspection program and had no adverse comments.
{
(Closed) Unresolved Items (358/80-05-07; 358/80-16-02):
Improvements were required in QC inspection program on hangers and restraints.
In discussions
with the new QA/QC staff and field engineers, and in review of the completely overhauled pipe suspension inspection program, the inspector determined that the licensee had made progress in the subject areas. The implementation of
'
the revised procedures will be reviewed by the inspector during future site i
visits.
Functional or Program Areas Inspected 1.
Procedure Review The inspector reviewed the following piping suspension system installa-tion and inspection drawings, specifications, and procedures:
S&L Drawing M-403, Sheet 1, " Component Supports General Notes
.
and Details," Revision F, dated December 31, 1981.
S&L Drawing M-403, Sheet 2, Revision E, dated December 31, 1981.
.
S&L Drawing M-403, Sheet 3, Revision D, dated February 20, 1981.
.
S&L Drawing M-403, Sheet 4, Revision C, dated December 31, 1981.
.
S&L Drawing M-403, Sheet 5, Revision C, dated December 31, 1981.
.
S&L Drawing M-403, Sheet 6, Revision C, dated December 31, 1981.
.
S&L Drawing M-403, Sheet 7, Revision B, dated September 3, 1981.
.
HJK Procedure No. GCP-7, " Installation of Concrete Expansion
.
Anchors," Revision 1, dated January 15, 1982.
S&L Specification Revision R10 to Section 5-4, " Miscellaneous
.
M:talwork and Embedded Work of Specification H2174," dated October 30, 1981.
CG&E, Wm. H. Zimmer Nuclear Power Station, Unit 1, " Concrete
.
Expansion Anchors Installation and Inspection Procedure," Revision 17, dated August 28, 1981.
.
.
S&L Drawing M-529, Sheet 4, Notes " Core Bore Installation
.
Procedure," Revision AG, dated February 24, 1981.
HJK Procedure No. G1P-6, " Expansion Anchor Inspection - Concrete
.
and Masonry Walls," Revision 0, dated February 1, 1982.
HJK Procedure No. MCP-9, " Process / Instrumentation Pipe Support
.
Installation," Revision 0, dated February 17, 1982.
.
HJK Procedure No. MIP-13, " Inspection Instruction for Pipe Support Installation," Revision 0, dated January 12, 1982.
GE Work Release Form, FDDR No. KN-4444, "Insta11atica Tolerance
.
for Hangers and Snubbers," dated July 24, 1980.
Subsequent to the review, the inspector stated that he had the following comments:
S&L Drawing M-403, Sheet 3, Item II, " Support Installation Tolerances."
a.
The inspector commented that Article F, where strut or snubber rear end bracket alternate positions were provided, did not ensure that such alternative arrangement can not cause the installation to exceed the 15* skew angle, cold to hot system movements. The licensee concurred with the inspector's finding, and initiated a Design Document Change (DDC), No, M5541, dated March 15, 1982, to incorporate the above design intent clarification.
b.
S&L Drawing M-403, Sheet 5, Item III, " Structural Installation Tolerance for Pipe Supports."
The inspector commented that Articles C.2.b.2, and C.2.b.4, where reduction in weld is allowed at bracing connections to structural embeds from all around to both sides of the web, did not provide structural member size limitation.
During the March 17, 1982 meeting conducted at S&L, the responsible S&L engineer stated the alternative installation provision above was only applicable to VF8 and smaller, and a DDC will be issued in the near future to clarify this limitation.
The inspector stated that he had no further questions.
2.
Removal of Unnecessary Snubbers NRC-RIII identified at LaSalle, Unit 1, that snubbers were installed too close to the vigid restraints so their functionability was impaired; and that snubbers with thermal axial movements of 1/16" to 1/8" (or less) could be replaced by rigid restraints.
As a result of the findings atLaSalle, S&L has initiated corrective measures for all S&L projects.
As of March 4, 1982, 57 Zimmer snubbers were identified with thermal movements less than 1/16" and will be removed or replaced by struts in accordance with planned schedules.
,
.
..
-
-
.
-
. - _.
.
,
[
During a meeting conducted at S&L on March 17, 1982, the inspector reviewed the following documents and had no adverse comment:
a.
- Mechanical / Project Management Memorandum, dated March 11, 1982,-
!
" Criteria for Selecting Use of Snubbers in Piping Systems."
b.
Mechanical /MODAS Memorandum, dated March 16, 1982, " Criteria for
Selecting Restraints for Dynamic Load Control and Weight Supports in Piping Systems."
'
3.
Review of GE Recirculation Loop Piping Suspension System
,
In review of the subject design and installation documents, the inspector observed the following questionable areas:
a.
IRRSA-11 (S&L Drawing No. M-464-2H, Sheet 34, Revision C,
.
dated 5/14/79).
IRRSA-12 (S&L Drawing No, M-464-2H, Sheet 35, Revisien C,
.
dated 3/6/79).
.
IRRSB-11 (S&L Drawing No. M-464-2H, Sheet 15, Revision C, l
.
.
dated 5/24/79).
IRRSB-12 (S&L Drawing No. M-464-2H, Sheet 16, Revision E,
.
dated 5/14/79).
,
"
The thermal movements shown on the above S&L drawings differed
'
from GE Drawing 761E910, Revision 10, dated July 9, 1979. During the meeting held at S&L on March 17, 1982, the S&L engineer stated that GE drawing, Revision 11, dated May 14, 1981, was being reviewed,-
k but had not yet been issued. The system suspension design was still considered to be preliminary.
'
-,
b.
IRRSA-26 (S&L Drawing No. M-464-2H, Sheet 60, Revision A,
.
'
dated 10/28/81).
,
IRRSA-27 (S&L Drawing No. M-464-2H, Sheet 61, Revision A,
.
dated 10/28/81).
IRRSB-26 (S&L Drawing No. M-464-2H, Sheet 62, Revision A,
.
dated 10/28/81).
IRRSB-27 (S&L Drawing No M-464-2H, Sheet 63, Revision A,
!
.
l'
dated 10/28/81).
No system thermal movements were specified on these installation-
drawings.
In discussion with the S&L engineers, it was stated that S&L was in the process of obtaining the design movements from GE, and the followup of this matter was controlled by the project management.
l
-
.
k e
w-+
+y
+
c
- ~
y
-
,w
__
_
.
c.
The inspector reviewed the design interface measures between S&L and GE engineering departments prescribed in GE Specification 22A 4003, " Piping, Interfaces (Reactor Coolant Pressure Boundary),"
Revision 1, dated October 12, 1978, and had no adverse comment.
d.
Questions relative to the mixed installation of both rigid struts and snubbers at the recirculation loop pumps that could impair the functionability of the snubbers that were raised at the LaSalle project were considered to be applicable to the Zimmer project since these two projects are both bkR 5/ Mark II GE generic design. During meetings conducted at S&L on March 17, 1982, and at GE on March 24-25, 1982, the questionable arrangements were discussed in detail for the LaSalle project due to its near term to the fuel loading dates. Since no significant findings were identified (see NRC-RIII Inspection Report No. 50-373/82-15)
for LaSalle project, the inspector stated that he had no further questions for Zimmer at this time, e.
During the meeting held at GE on March 24-25, 1982, the inspector reviewed the snubber qualification test data for both E-systems and ITT-Grinnell units installed at the recirculation systems.
No deficiency areas were identified as a result of his review.
4.
S&L Snubber Selection Criteria S&L snubber design criteria including transient loading combinations based on either SRSS or ABS values that were used in the snubber selection processes were reviewed by the inspector. The inspector reviewed the S&L Project Instruction PI-ZI-13.2, " Procedure for Phase II Support Release," Revision 0, dated February 10, 1981, and had the following comments:
a.
The application of ABS and SRSS loading criteria was defined in the PI, and was in accordance with the requirements established in NUREG-0528, Supplement No. 1, "SER Related to the Operation of Wm. H. Zimmer Nuclear Power Station, Unit No. 1," dated June 1981.
b.
The design basis and the control use of " Empirical Loads (EL)"
as described in PI-ZI-13.2 will be reviewed further. The S&L engineering staff stated that the application of EL in support design without actual calculated loadings was concurred in by NRC-NRR, and was documented in Zimmer Power Station - Mark II Design Analysis Review, Chapter 2.0, "Zimmer Empirical Loads,"
Amendment 13, dated October 1980. This is an unresolved item.
(358/82-14-01)
Unresolved Items Unresolved items are matters about which more information is required in order to ascertain whether they are acceptable items, items of non-l compliance, or deviations. The unresolved item disclosed during the
,
inspection is discussed in Paragraph 4.b.
!
l
i
!
,
. -
--.
-- --.
-
--
.
.-
.
..
_
_
Y Exit Interview
-
,
The inspector met with licensee representatives at the conclusion of the inspection. The inspector summarized the scope and findings of the inspection. The licensee acknowledged the findings reported herein.