Forwards IE Insp Rept 50-358/82-04 on 820301-12,17 & 24-25. No Noncompliance Noted
ML20052B750
Person / Time
Site: Zimmer
Issue date: 04/14/1982
From: Little W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Borgmann E
CINCINNATI GAS & ELECTRIC CO.
Shared Package
ML20052B751 List:
References
NUDOCS 8205030532
Download: ML20052B750 (2)


See also: IR 05000358/1982004

Text

I

'

-

s.

APft 141332

Docket No. 50-358

k'

Cincinnati Gas and Electric

g

Company

j

j

NITN:

Mr. Earl A. Borgmann

,y

?gl, 4 y3

'

Senior Vice President

iQr

Engineering Services and

_

aE' " ; 1 %

l- 7

c. a gG

-

Electric Production

c3

139 East 4th Street

\\

mV

%

<

Cincinnati, OH 45201

(N

v4

Gentlemen:

A

This refers to the routine safety inspection conducted by Mr. I. T. Yin

of this office on March 10-12, 1982, at the site, on March 17, 1982, at

Sargent and Lundy Engineers, and on March 24-25, 1982, at General Electric

Company of activities at Wm. H. Zimmer Power Station authorized by NRC

Construction Permit No. CPPR-88 and to the discussion of our findings

with Mr. H. R. Sager at the conclusion of the inspection.

The enclosed copy of our inspection report identifies areas examined during

the inspection. Within these areas, the inspection consisted of a selective

examination of procedures and representative records, observations, and

interviews with personnel.

No items of noncompliance with NRC requirements were identified during the

course of this inspection.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy

of this letter and the enclosed inspection report will be placed in the

NRC's Public Document Room.

If this report contains any information

that you (or your contractors) believe to be exempt from disclosure under

10 CFR 9.5(a)(4), it is necessary that you (a) notify this office by tele-

phone within ten (10) days from the data of this letter of your intention

to file a request for withholding; and (b) submit within twenty-five (25)

days from the date of this letter a written application to this office

to withhold such information.

If your reccipt of this letter has been

i

!

,

06

820503

N

o

-

.

APR 141982

Cincinnati Gas and Electric

2

Company

i

delayed such that less than seven (7) days are available for your review,

please notify this office promptly so that a new due date may be estab-

lished.

.;onsistent with Section 2.790(b)(1), any such application must

be accompanied by an affidavit executed by the owner of the information

,

which identifies the document or part sought to be withheld, and which

.

'

contains a full statement of the reasons which are the bases for the

claim that the information should be withheld from public disclosure.

This section further requires the statement to address with specificity

the considerations listed in 10 CFR 2.790(b)(4). The information sought

to be withheld shall be incorporated as far as possible into a separate

part of the affidavit. If we do not hear from you in this regard within

the specified periods noted above, a copy of this letter and the enclosed

inspection report will be placed in the Public Document Room.

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

,d

et c,

,W.

. Lit le, Chief

Enginee ing Inspection Branch

Enclosure:

Inspection Report

No. 50-358/82-04

cc w/ enc 1:

J. R. Schott, Plant Superintendent

DMB/ Document Control Desk ' RIDS)

Resident Inspector, RIII

Ilarold W. Kohn, Power Siting

Commission

Citizens Against a Radioactive

Environment

IIelen W. Evans, State of Ohio

Robert M. Quillin, Ohio

Department of llealth

Thomas Applegate

f

RIII

RIII

RI

j

RIII

)k

Da)nielton

fj/{le

u

-

Yin /jp

Street'er

Vitt

4/9/8

4///Z/#F

i