IR 05000352/1997004

From kanterella
(Redirected from IR 05000353/1997004)
Jump to navigation Jump to search
Exam Repts 50-352/97-04OL & 50-353/97-04OL on 970501. Exam Results:Initial Retake Exam Administered to One RO Applicant on 970501.Applicant Passed Exam
ML20141D722
Person / Time
Site: Limerick  
Issue date: 05/08/1997
From:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To:
Shared Package
ML20141D687 List:
References
50-352-97-04OL, 50-352-97-4OL, 50-353-97-04OL, 50-353-97-4OL, NUDOCS 9705200183
Download: ML20141D722 (3)


Text

.

-. -

...

.-

-, _ - -

-

-.. -

-..

-

-

_ _.. - - _. _ -

.

.

U. S. NUCLEAR REGULATORY COMMISSION

REGION I

Docket Nos.:

50-352 & 353 Report No.:

97 04 (OL)

Licensee:

PECo Energy Company

,

Facility:

Limerick Gene sting Station l

Examination Date:

May 1,1997 Examiner:

J.H. Williams, Sr. Operations Engineer i

. Approved by:

Glenn W. Meyer, Chief j

l Operator Licensing and

-

-

'

Human Performance Branch Division of Reactor Safety

l

\\

l I

t-

.

A i

>

9705200183 970500 E

FDR ADOCK 05000352

y PDR

,u

,

"

-r

.

..

..

...

.

.

- - - - _ - _ _ - - - _ _ - _ - _ _ _ - - - - - - _ - _

. _ - - _

,

.

EXECUTIVE SUMMARY Examination Report 50-352 & 353/97-04 (OL)

An initial retake operating examination was administered to one reactor operator (RO)

applicant on May 1,1997, at the Limerick Generating station.

Operations A facility-developed operating examination was administered by the NRC to an RO license applicant who had failed his first examination administered on January 21-24,1997. The applicant passed his retake examination.

.

,

!

ii L

--...

--

.

.- -

- _ - _ _ _ - _ - _ _ - _ - _ - _ _ _ _ _ _ - - - _ _ - - - _ - _ _ _ _ _ _ - - _ - _ _ _ _ _ _ _ _ _ _ _ _ _

.-,-

.. - -

.

...

.

'

a

.

.

Details 05.1 Ooerator Initial Examination a.

Scope The NRC administered a retake initial operating examination to one reactor operator (RO) applicant on May 1,1997. The examination was developed and administered in accordance with generic letter, GL 95-06, " Changes in the Operator Licensing Program," guidelines and NUREG-1021, " Examiner Standards," Revision 7.

b.

Observations and Findinas The facility developed the operating examination, which was reviewed, approved and administered by the NRC. The examination, with minor changes from the

,

'

original submittal, was validated at the facility on April 28,1997.

The results of the examination is summarized below:

t RO Pass / Fail Written waived Operating 1/0 Overall 1/0 The applicant's performance was satisfactory. No generic weaknesses were identified. An appropriate level of management oversight in the evaluation of the operating examination was apparent in the presen::e and involvement of operations, and training managers and the supervisors in the oxamination preparation and validation.

c.

Conclusion.ji One RO applicant passed his retake initial operating examination and was issued a license.

,

r