IR 05000352/1997004
| ML20141D722 | |
| Person / Time | |
|---|---|
| Site: | Limerick |
| Issue date: | 05/08/1997 |
| From: | NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | |
| Shared Package | |
| ML20141D687 | List: |
| References | |
| 50-352-97-04OL, 50-352-97-4OL, 50-353-97-04OL, 50-353-97-4OL, NUDOCS 9705200183 | |
| Download: ML20141D722 (3) | |
Text
.
-. -
...
.-
-, _ - -
-
-.. -
-..
-
-
_ _.. - - _. _ -
.
.
U. S. NUCLEAR REGULATORY COMMISSION
REGION I
Docket Nos.:
50-352 & 353 Report No.:
97 04 (OL)
Licensee:
PECo Energy Company
,
Facility:
Limerick Gene sting Station l
Examination Date:
May 1,1997 Examiner:
J.H. Williams, Sr. Operations Engineer i
. Approved by:
Glenn W. Meyer, Chief j
l Operator Licensing and
-
-
'
Human Performance Branch Division of Reactor Safety
l
\\
l I
t-
.
A i
>
9705200183 970500 E
FDR ADOCK 05000352
y PDR
,u
,
"
-r
.
..
..
...
.
.
- - - - _ - _ _ - - - _ _ - _ - _ _ _ - - - - - - _ - _
. _ - - _
,
.
EXECUTIVE SUMMARY Examination Report 50-352 & 353/97-04 (OL)
An initial retake operating examination was administered to one reactor operator (RO)
applicant on May 1,1997, at the Limerick Generating station.
Operations A facility-developed operating examination was administered by the NRC to an RO license applicant who had failed his first examination administered on January 21-24,1997. The applicant passed his retake examination.
.
,
!
ii L
--...
--
.
.- -
- _ - _ _ _ - _ - _ _ - _ - _ - _ _ _ _ _ _ - - - _ _ - - - _ - _ _ _ _ _ _ - - _ - _ _ _ _ _ _ _ _ _ _ _ _ _
.-,-
.. - -
.
...
.
'
a
.
.
Details 05.1 Ooerator Initial Examination a.
Scope The NRC administered a retake initial operating examination to one reactor operator (RO) applicant on May 1,1997. The examination was developed and administered in accordance with generic letter, GL 95-06, " Changes in the Operator Licensing Program," guidelines and NUREG-1021, " Examiner Standards," Revision 7.
b.
Observations and Findinas The facility developed the operating examination, which was reviewed, approved and administered by the NRC. The examination, with minor changes from the
,
'
original submittal, was validated at the facility on April 28,1997.
The results of the examination is summarized below:
t RO Pass / Fail Written waived Operating 1/0 Overall 1/0 The applicant's performance was satisfactory. No generic weaknesses were identified. An appropriate level of management oversight in the evaluation of the operating examination was apparent in the presen::e and involvement of operations, and training managers and the supervisors in the oxamination preparation and validation.
c.
Conclusion.ji One RO applicant passed his retake initial operating examination and was issued a license.
,
r