January 22, 2020

SUBJECT:

LIMERICK GENERATING STATION, UNITS 1 AND 2 - SECURITY BASELINE INSPECTION REPORT 05000352/2020402 AND 05000353/2020402

Dear Mr. Hanson:

On January 8, 2020, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Limerick Generating Station, Units 1 and 2 and discussed the results of this inspection with Mr. Frank Stuniolo, Site Vice-President, and other members of your staff. The results of this inspection are documented in the enclosed report.

No findings or violations of more than minor significance were identified during this inspection.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely,

/RA/

Fred L. Bower, III, Chief Plant Support Branch Division of Reactor Safety

Docket Nos. 05000352 and 05000353 License Nos. NPF-39 and NPF-85

Enclosure:

As stated

Inspection Report

Docket Numbers:

05000352 and 05000353

License Numbers:

NPF-39 and NPF-85

Report Numbers:

05000352/2020402 and 05000353/2020402

Enterprise Identifier: I-2020-402-0002

Licensee:

Exelon Generation Company, LLC.

Facility:

Limerick Generating Station, Units 1 and 2

Location:

Sanatoga, PA 19464

Inspection Dates:

January 6, 2020 to January 8, 2020

Inspectors:

D. Caron, Senior Physical Security Inspector

J. Cherubini, Senior Physical Security Inspector

Approved By:

Fred L. Bower, III, Chief

Plant Support Branch

Division of Reactor Safety

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a security baseline inspection at Limerick Generating Station,

Units 1 and 2, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

List of Findings and Violations

No findings or violations of more than minor significance were identified.

Additional Tracking Items

None.

INSPECTION SCOPES

Unless otherwise noted, baseline security inspections were conducted in accordance with the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter 2201, Security Inspection Program for Commercial Nuclear Power Reactors. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards. Publicly available IPs are located at:

http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html.

SAFEGUARDS

71130.01 - Access Authorization

The inspectors evaluated the access authorization program. The following elements were

===evaluated:

Access Authorization===

(1) Tier I: All Requirements

Tier II: 6 Requirements (02.06 a - c, 02.07 a - b, 02.08 b)

Tier III: 4 Requirements (02.10 a - c, 02.11 a)

71130.08 - Fitness For Duty Program

The inspectors evaluated the fitness for duty program by completing the following inspection elements and conducting an interview with Exelon's newest medical review officer/substance abuse expert, Dr. Linda Bissonnette, that may provide medical services to any Exelon site in Region I:

Fitness For Duty Program (1 Sample)

(1) Tier I: All Requirements

Tier II: 26 Requirements (02.05 a - l, 02.06 a - g, 02.07, 02.08, 02.09 a - e)

Tier III: 6 Requirements (02.10, 02.13 d and e, 02.14 a - c)

INSPECTION RESULTS

No findings were identified.

EXIT MEETINGS AND DEBRIEFS

The inspectors verified no proprietary information was retained or documented in this report.

On January 8, 2020, the inspectors presented the security baseline inspection results to Mr. Frank Stuniolo, Site Vice-President, and other members of the licensee staff.

DOCUMENTS REVIEWED

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

71130.01

Miscellaneous

UAA-2019-03

INPO Access Authorization Program

2/28/2019

Procedures

SY-AA-103-500

Access Authorization Program

Revision 15

SY-AA-103-507

Review Criteria for Determining Trustworthiness and

Reliability

Revision 6

SY-AA-103-514

Site Authorization for Unescorted Access

Revision 19

SY-AA-105-511

Access Authorization In-Processing/Out Processing of

Personnel

Revision 25

71130.08

Corrective Action

Documents

04167292

216340

247176

202720

04107501

04107363

274703

215043

04167955

04302783

277429

284399

Procedures

SY-AA-102

Exelon Generation Fitness for Duty Program

Revision 21

SY-AA-102-201

Call-Outs for Unscheduled Work

Revision 13

SY-AA-102-203

Treatment Plan and Follow-Up Testing

Revision 7

SY-AA-102-204

Random Selection and Notification Process

Revision 13

SY-AA-102-205

Fitness for Duty Appeal Review

Revision 9

SY-AA-102-206

Reporting Use of Medication

Revision 19

SY-AA-102202

Testing for Cause

Revision 20