January 23, 2013
SUBJECT:
JOSEPH M. FARLEY NUCLEAR PLANT - NOTIFICATION OF LICENSED OPERATOR INITIAL EXAMINATION - 05000348/2013301 AND 05000364/2013301
Dear Mr. Lynch:
In a telephone conversation on January 17, 2013, between Mr. Gary Ohmstede, Lead Instructor Exam Development and Mr. Phillip Capehart, Senior Operations Engineer, arrangements were made for the administration of licensing examinations at the Farley Nuclear Plant. The operating test is scheduled to be administered during the weeks of June 17 and June 24, 2013.
The written examination is scheduled to be administered the week of July 1, 2013. The on-site preparatory week is scheduled for the week of May 20, 2013.
As agreed during the telephone conversation, your staff will prepare both the operating test and written examination based on the guidelines in Revision 9, Supplement 1, of NUREG-1021,
"Operator Licensing Examination Standards for Power Reactors." The U.S. Nuclear Regulatory Commission (NRC) regional office will discuss with your staff any changes that might be necessary before the examinations are administered. Your staff has also agreed to make copies of all examination materials that are necessary for administering the examination.
To meet the above schedule, it will be necessary for your staff to furnish the operating test outline and the supporting reference materials identified in Attachment 3 to ES-201 by April 3, 2013. Mr. Phillip Capehart provided a written examination outline to your staff on October 21, 2012. The operating test, written examination, will be due by May 3, 2013. Pursuant to Title 10, Section 55.40(b)(3), of the Code of Federal Regulations (10 CFR 55.40(b)(3)), an authorized representative of the facility licensee shall approve the outline, examination, and test before they are submitted to the NRC for review and approval. All materials shall be complete and ready-to-use.
We request that any personal, proprietary, sensitive unclassified, or safeguards information in your response be contained in a separate enclosure and appropriately marked. Any delay in receiving the required examination and reference materials, or the submittal of inadequate or incomplete materials, may cause the examinations to be rescheduled. In order to conduct the requested written examinations and operating tests, it will be necessary for your staff to provide adequate space and accommodations in accordance with ES-402, and to make the simulation facility available on the dates noted above. In accordance with ES-302, your staff should retain the original simulator performance data (e.g., system pressures, temperatures, and levels) generated during the dynamic operating tests until the examination results are final.
Appendix E of NUREG-1021 contains a number of NRC policies and guidelines that will be in effect while the written examinations and operating tests are being administered.
To permit timely NRC review and evaluation, your staff should submit preliminary reactor operator and senior reactor operator license applications, medical certifications, and waiver requests (if any) at least 30 days before the first examination date. If the applications are not received at least 30 days before the examination date, a postponement may be necessary.
Signed applications certifying that all training has been completed should be submitted at least 14 days before the first examination date.
This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of Management and Budget (OMB) under approval number 3150-0018, which expires on February 28, 2013. The public reporting burden for this collection of information is estimated to average 500 hours0.00579 days <br />0.139 hours <br />8.267196e-4 weeks <br />1.9025e-4 months <br /> per response, including the time for reviewing instructions, gathering and maintaining the data needed, writing the examinations, and completing and reviewing the collection of information. Send comments on any aspect of this collection of information, including suggestions for reducing the burden, to the Information and Records Management Branch (T-6 F33), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet electronic mail at infocollectsresource@nrc.gov; and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0018), Office of Management and Budget, Washington, DC 20503.
The NRC may neither conduct nor sponsor, and a person is not required to respond to, an information collection, unless it displays a currently valid OMB control number.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosures will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRCs document system (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm.adams.html (the Public Electronic Reading Room).
Thank you for your cooperation in this matter. Mr. Gary Ohmstede has been advised of the policies and guidelines referenced in this letter. If you have any questions regarding the NRC's examination procedures and guidelines, please contact Mr. Phillip Capehart at (404) 997-4483, (Internet E-mail: Phillip.Capehart@nrc.gov), or me at (404) 997-4550, (Internet E-mail:
Malcolm.Widmann@nrc.gov).
Sincerely,
/RA/
Malcolm T. Widmann, Chief Operations Branch 1
Division of Reactor Safety
Docket Nos.: 50-348 and 50-364 License Nos.: NPF-2 and NPF-8
cc: (See Page 4)
_________________________
xG SUNSI REVIEW COMPLETE G FORM 665 ATTACHED OFFICE RII:DRS RII:DRS
SIGNATURE RA RA
NAME CAPEHART WIDMANN
DATE 01/ 23/2013 01/ 23 /2013
E-MAIL COPY?
YES NO YES NO YES NO YES NO YES NO YES NO YES NO cc:
C. Russ Dedrickson Fleet Support Supervisor Southern Nuclear Operating Company, Inc.
Electronic Mail Distribution
Cheryl A. Gayheart Plant Manager Joseph M. Farley Nuclear Plant Southern Nuclear Operating Company, Inc.
Electronic Mail Distribution
S. Kuczynski Chairman, President and CEO Southern Nuclear Operating Company, Inc.
Electronic Mail Distribution
Leigh Perry SVP & General Counsel-Ops & SNC Southern Nuclear Operating Company, Inc.
Electronic Mail Distribution
D. G. Bost Chief Nuclear Officer Southern Nuclear Operating Company, Inc.
Electronic Mail Distribution
Dennis R. Madison Vice President Edwin I. Hatch Nuclear Plant Southern Nuclear Operating Company, Inc.
Electronic Mail Distribution
Paula Marino Vice President Engineering Southern Nuclear Operating Company, Inc.
Electronic Mail Distribution
T. E. Tynan Site Vice President Vogtle Electric Generating Plant Southern Nuclear Operating Company, Inc.
Electronic Mail Distribution
M. J. Ajluni Nuclear Licensing Director Southern Nuclear Operating Company, Inc.
Electronic Mail Distribution
Mark Williams Commissioner Georgia Department of Natural Resources Electronic Mail Distribution
B. D. McKinney, Jr.
Regulatory Response Manager Southern Nuclear Operating Company, Inc.
Electronic Mail Distribution
D. W. Daughhetee Licensing Engineer Southern Nuclear Operating Company, Inc.
Electronic Mail Distribution
T. D. Honeycutt Regulatory Response Supervisor Southern Nuclear Operating Company, Inc.
Electronic Mail Distribution
Bradley J. Adams Vice President Fleet Operations Support Southern Nuclear Operating Company, Inc.
Electronic Mail Distribution
N. J. Stringfellow Licensing Manager Southern Nuclear Operating Company, Inc.
Electronic Mail Distribution
L. P. Hill Licensing Supervisor Southern Nuclear Operating Company, Inc.
Electronic Mail Distribution
L. L. Crumpton Administrative Assistant, Sr.
Southern Nuclear Operating Company, Inc.
Electronic Mail Distribution
William D. Oldfield Principal Licensing Engineer Joseph M. Farley Nuclear Plant Electronic Mail Distribution
(cc contd - See page 5) (cc contd)
Todd L. Youngblood Vice President Fleet Oversight Southern Nuclear Operating Company, Inc.
Electronic Mail Distribution
John G. Horn Site Support Manager Joseph M. Farley Nuclear Plant Southern Nuclear Operating Company, Inc.
Electronic Mail Distribution
Senior Resident Inspector U.S. Nuclear Regulatory Commission Joseph M. Farley Nuclear Plant P. O. Box 620 Ashford, AL 36312
Cynthia A. Sanders Radioactive Materials Program Manager Environmental Protection Division Georgia Department of Natural Resources Electronic Mail Distribution
James C. Hardeman Environmental Radiation Program Manager Environmental Protection Division Georgia Department of Natural Resources Electronic Mail Distribution
Mr. Mark Culver Chairman Houston County Commission P. O. Box 6406 Dothan, AL 36302
James L. McNees, CHP Director Office of Radiation Control Alabama Dept. of Public Health P. O. Box 303017 Montgomery, AL 36130-3017
State Health Officer Alabama Dept. of Public Health P.O. Box 303017 Montgomery, AL 36130-3017
Chuck Mueller Manager Policy and Radiation Program Georgia Department of Natural Resources Electronic Mail Distribution
Southern Nuclear Operating Company, Inc.
ATTN: Ms. Donna Christiansen
Training Manager Farley Nuclear Plant P. O. Box 470 Ashford, AL 36312
Letter to T. from Malcolm T. Widmann dated January 23, 2013.
SUBJECT:
JOSEPH M. FARLEY NUCLEAR PLANT - NOTIFICATION OF LICENSED OPERATOR INITIAL EXAMINATION - 05000348/2013301 AND 05000364/2013301
Distribution:
RIDSNRRDIRS PUBLIC RidsNrrPMFarley Resource