IR 05000338/1996008

From kanterella
Jump to navigation Jump to search
Ack Receipt of Which Provided Addl Info to Exercise Weakness Described in Insp Repts 50-338/96-08 & 50-339/96-08.Based on Info,Facility Needs to Develop Action Plan to Resolve Issues Re Dose Assessment Activities
ML20133F641
Person / Time
Site: North Anna  Dominion icon.png
Issue date: 12/19/1996
From: Gibson A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Ohanlon J
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
References
NUDOCS 9701140304
Download: ML20133F641 (3)


Text

!

l

December 19, 1996 l

Virginia Electric and Power Company l ATTN: Mr. J. :

Senior Vice President Nuclear  !

Innsbrook Technical Center 5000 Dominion Boulevard Glen Allen, VA 23060 ,

SUBJECT: NRC INSPECTION REPORT N0. 50-338/96 08 AND 50 339/96 08

Dear Mr. O'Hanlon:

!

Thank you for your response of November 13, 1996, which 3rovided additional information to the exercise weakness described in the su] ject report transmitted by our letter of September 30, 1996. Based on the information you provided in your reply, it appears that radiological conditionc were reported to offsite authorities some 19 minutes earlier than indicated in our report. ,

l Requirements in 10 CFR 50 Appendix E identify that notification of offsite l authorities regarding the declaration of an emergency is required within l 15 minutes of the declaration. Our expectation is that radiological condition information will be transmitted to offsite authorities with the initial notification of a General Emergency condition. If such radiological information is not available before the 15 minutes notification is made, then radiological information is to be promptly provided to offsite authorities to assist them in making important decisions concerning the need to take necessary actions to protect the public. Therefore, we do not concur with your conclusion that the 40 minute interval from the start of the release (the basis for the General Emergency declaration) to transmittal of the first Report of Radiological Conditions to the State was not excessive. Our observations during the exercise indicated that the input errors made with MIDAS Run Nos. 7 and 8 and the concomitant confusion and discussions surrounding them impacted the late transmittal of message Hidas Run No. 6, which is the report in question. Additionally, the radiological conditions that would have been transmitted by Midas Run Nos. 7 and 8 would have better i re)orted the radiological conditions surrounding the release. Therefore, we !

ac(nowledge that a time correction from 1:04 p.m. to 12:45 p.m. may be a)propriate. However,-the exercise weakness will remain, based on our direct caservations of the delayed reporting.

Based on the information you have provided in this response and on the basis of the Dose Assessment Review Task Team that you established to develop an action plan to resolve issues and implement enhancements to your dose assessment activities, no further reply to this issue is necessary.

9701140304 961219

~

PDR ADOCK 05000338 G PDR ls

12 % l

. 9m

.- . _ _ ,_ __ _ . - . . . _. __ ._.

'

l l l

VEPC0 2 We appreciate your cooperation in this matter.

Sincerely,

'

(Original signed by A. F. Gibson)

Albert F. Gibson, Director Division of Reactor Safety Docket Nos. 50 338, 50 339 License Nos. NPF 4, NPF 7 l

cc: M. L. Bowling, Manager William C. Porter, Jr.

Nuclear Licensing and County Administrator j Operations Support Louisa County Virginia Electric & Power Co. l P. O. Box 160 -

Innsbrook Technical Center Louisa, VA 23093 I 5000 Dominion Boulevard Glen Allen. VA 23060 Michael W. Maupin, Esq.

Hunton and Williams i W. R. Matthews, Manager Riverfront Plaza, East Tower i North Anna Power Station 951 E. Byrd Street i P. 0. Box 402 Richmond,-VA 23219 l Mineral, VA 23117 Attorney General i D. A. Christian, Manager Supreme Court Building I Surry Power Station 900 East Main Street Virginia Electric & Power Co. Richmond, VA 23219 5570 Hog Island Road Surry, VA 23883 Robert B. Strobe, M.D., M.P.H.

State Health Commissioner Executive Vice President Office of the Commissioner Old Dominion Electric Virginia Department of Health ,

Cooperative P. O. Box 2448 l 4201 Dominion Boulevard Richmond, VA 23218 Glen Allen, VA 23060 Dr. W. T. Lough Virginia Corporation Commission Division of Energy Regulation P. O. Box 1197 l Richmond, VA 23209 Distribution: See page 3 ,

'

!

,

, .

. -. - .- --- _ . -- - - . _ .- . . - _ - . .. - - .-.

.

.

VEPC0 3 l

i Distribution:

!

G. Belisle, RII L. Garner, RII i

B. Buckley, NRR R. Gibbs, RII P. Fillion, RII E. Testa. RII W. Stansberry, RII C. Payne, RII PUBLIC NRC Resident Inspector U.S. Nuclear Regulatory Comission 1024 Haley Drive Mineral, VA 23117 NRC Resident Inspector U.S. Nuclear Regulatory Comission Surry Nuclear Power Station 5850 Hog Island Road Surry, VA 23883

!

l

.

!

l l

OrFICE Rtf:0RS Rif:0RS Rff 0RP .

l NAME WSartor KWr f A8el le i j DATE 12 / /, / % 12_/ h / % 12A k / % 12 / /% 12 / /% 12 / /%

COPY? DEN NO [YES) N0 ffES} NO YES NO YES NO YES NO

}

OttiLIAL REGURD COPY NUMLN1 WNE:U :\RPI5\NAK KLTR.WM5 i i

_. ___

.