IR 05000336-08-402 and 05000423-08-402; on 05/12/2008 - 05/16/2008; Millstone Power Station; Physical Protection; Access Control. (Letter Only)
ML081640555
Person / Time
Site: Millstone  Dominion icon.png
Issue date: 06/12/2008
From: James Trapp
Plant Support Branch 1
To: Christian D
Dominion Resources Services
References
IR-08-402
Download: ML081640555 (5)


Text

une 12, 2008

SUBJECT:

MILLSTONE POWER STATION - NRC PHYSICAL SECURITY BASELINE INSPECTION REPORT 05000336/2008402 AND 05000423/2008402

Dear Mr. Christian:

On May 16, 2008, the U.S. Nuclear Regulatory Commission (NRC) completed a security baseline inspection at your Millstone Power Station. The inspection covered one or more of the key attributes of the security cornerstone of the NRC=s Reactor Oversight Process. The enclosed report documents the inspection results, which were discussed on May 16, 2008, with Mr. J. Allan Price, Site Vice President and other members of your staff.

The inspection examined activities conducted under your licenses as they relate to security and compliance with the Commission=s rules and regulations and with the conditions of your licenses. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel.

This report documents one finding of very low safety significance (i.e. Green as determined by the Physical Protection Significance Determination Process). The deficiency was promptly corrected or compensated for, and the plant was in compliance with applicable physical protection and security requirements within the scope of the inspection before the inspectors left the site. The finding has a cross-cutting aspect in the area of Human Performance because expectations were not clearly communicated. Additionally, a licensee-identified violation which was determined to be of very low safety significance is listed in this report. However, because of the very low safety significance and because it is entered into your corrective action program, the NRC is treating this violation as a non-cited violation (NCV) consistent with Section VI.A.1 of the NRC Enforcement Policy. If you contest this non-cited violation, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the Nuclear Regulatory Commission, ATTN.: Document Control Desk, Washington DC 20555-0001; with copies to the Regional Administrator Region I; the Director, Office of Enforcement, United States Nuclear Regulatory Commission, Washington, DC 20555-0001; and the NRC Resident Inspector at Millstone Power Station.

When separated from its Enclosure, this document is DECONTROLLED. In accordance with 10 CFR 2.390 of the NRC=s ARules of Practice,@ a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC=s document system, ADAMS. ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, because of the security-related information contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letter=s enclosure will not be available for public inspection.

In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response, if any. This practice will ensure that your response will not be made available electronically for public inspection in the NRC Public Document Room or from the NRCs document system, ADAMS. If Safeguards Information is necessary to provide an acceptable response, please provide the level of protection described in 10 CFR 73.21. Otherwise, mark your entire response Security-Related Information - Withhold Under 10 CFR 2.390 and follow the instructions for withholding in 10 CFR 2.390(b)(1).

Sincerely,

/RA/

James M. Trapp, Chief Plant Support Branch 1 Division of Reactor Safety Docket Nos. 50-336, 50-423 License Nos. DPR-65, NPF-44 Enclosure: Inspection Report 05000336/2008402 and 05000423/2008402 w/Attachment: Supplemental Information (OUO-SRI) In accordance with 10 CFR 2.390 of the NRC=s ARules of Practice,@ a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC=s document system, ADAMS. ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, because of the security-related information contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letter=s enclosure will not be available for public inspection.

In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response, if any. This practice will ensure that your response will not be made available electronically for public inspection in the NRC Public Document Room or from the NRCs document system, ADAMS. If Safeguards Information is necessary to provide an acceptable response, please provide the level of protection described in 10 CFR 73.21. Otherwise, mark your entire response Security-Related Information - Withhold Under 10 CFR 2.390 and follow the instructions for withholding in 10 CFR 2.390(b)(1).

Sincerely,

/RA/

James M. Trapp, Chief Plant Support Branch 1 Division of Reactor Safety Docket Nos. 50-336, 50-423 License Nos. DPR-65, NPF-44 Enclosure: Inspection Report 05000336/2008402 and 05000423/2008402 w/Attachment: Supplemental Information (OUO-SRI)

SUNSI Review Complete: ___JMT_______ (Reviewer=s Initials) ADAMS ACCESSION NO. ML081640555 DOCUMENT NAME: G:\DRS\Plant Support Branch 1\Security\Dimitriadis\2008 BI Millstone 5-16-08 Rev 2.doc After declaring this document AAn Official Agency Record@ letter will be released to the Public.

To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RI/DRS RI/DRS RI/DRS RI/DRP RI/DRS NAME ADimitriadis/AXD GSmith/GES WSchmidt/WAC for RPowell/RJP JTrapp/JMT DATE 06/09/08 06/10/08 06/10/08 06/10/08 06/12/08 OFFICIAL COPY cc w/encl; w/OUO-SRI:

J. Campbell, Site Security Manager, Millstone Station E. Wilds, Jr., Ph.D., Director, State of Connecticut SLO Designee F. Tabert, Assistant Director, NY State Dept of Homeland Security M. Balboni, Deputy Secy, New York State Public Safety R. Calendar, Acting President and CEO, NY State Energy Research and Development Authority cc w/o encl; w/o OUO-SRI:

J. A. Price, Site Vice President, Millstone Station C. L. Funderburk, Director, Nuclear Licensing and Operations Support W. Bartron, Supervisor, Station Licensing J. Spence, Manager Nuclear Training L. M. Cuoco, Senior Counsel C. Brinkman, Manager, Washington Nuclear Operations J. Roy, Director of Operations, Massachusetts Municipal Wholesale Electric Company First Selectmen, Town of Waterford B. Sheehan, Co-Chair, NEAC E. Woollacott, Co-Chair, NEAC J. Buckingham, Department of Public Utility Control C. Meek-Gallagher, Commissioner, Suffolk County, Department of Environment and Energy V. Minei, P.E., Director, Suffolk County Health Department, Division of Environmental Quality R. Shadis, New England Coalition Staff S. Comley, We The People D. Katz, Citizens Awareness Network (CAN)

R. Bassilakis, CAN J. M. Block, Attorney, CAN P. Eddy, Electric Division, Department of Public Service, State of New York J. Spath, SLO Designee, New York State Energy Research and Development Authority N. Burton, Esq.

Attachment Distribution w/o encl; w/o OUO-SRI: (via e-mail)

S. Collins, RA M. Dapas, DRA S. Williams, RI OEDO M. Kowal, NRR R. Nelson, NRR J. Hughey NRR, PM J. Lamb, NRR, PM J. Benjamin, RI J. Krafty, RI C. Sanders, DRP R. Powell, DRP B. Norris, DRP N. Sieller, DRP Region I Docket Room (with concurrences)

ROPreports Resource (All IRs)

M. Gamberoni, DRS D. Roberts, DRS J. Trapp, DRS Distribution w/encl; w/OUO-SRI: (via e-mail)

S. Shaffer, DRP - Senior Resident Inspector D. Riffle, NSIR A. Dimitriadis, Senior Physical Security Inspector Attachment