January 3, 2005
SUBJECT:
MILLSTONE POWER STATION UNIT 2 NRC INSPECTION REPORT 05000336/2004017
Dear Mr. Christian:
On November 19, 2004, the U. S. Nuclear Regulatory Commission (NRC) completed an engineering team inspection at Millstone Unit 2. The enclosed inspection report presents the results of that inspection, which were discussed at an exit meeting on November 19, 2004 with Mr. J. Alan Price and other members of your staff.
This inspection examined activities conducted under your license as they relate to safety, and compliance with the Commissions rules and regulations and with the conditions of your license.
The inspection consisted of system walkdowns; examination of selected procedures, drawings, modifications, calculations, surveillance tests and maintenance records; and interviews with station personnel.
Based on the results of this inspection, no findings of significance were identified.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely,
/RA/
Lawrence T. Doerflein, Chief Safety Systems Branch Division of Reactor Safety Docket No. 50-336 License No. DPR-65 Enclosure: Inspection Report 05000336/2004017 w/attachment: Supplemental Information
Mr. David