March 11, 2025
SUBJECT:
ANNUAL ASSESSMENT LETTER FOR SAINT LUCIE PLANT, UNITS 1 & 2 -
REPORT 05000335/2024006 AND 05000389/2024006
Dear Robert Coffey:
The NRC has completed its end-of-cycle performance assessment of Saint Lucie Plant, Units 1
& 2, reviewing performance indicators (PIs), inspection results, and enforcement actions from January 1, 2024, through December 31, 2024. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility. The NRC concluded that overall performance at your facility preserved public health and safety. The baseline inspection program was completed at your facility as defined in Inspection Manual Chapter 2515, Light-Water Reactor Inspection Program - Operations Phase.
The NRC determined the performance at Saint Lucie Plant, Units 1 & 2, during the most recent quarter was within the Licensee Response Column, the highest performance category of the NRCs Reactor Oversight Process (ROP) Action Matrix, because all inspection findings had very low safety significance (i.e., Green), and all PIs were within the expected range (i.e., Green).
Therefore, the NRC plans to conduct ROP baseline inspections at your facility The enclosed inspection plan lists the inspections scheduled through December 31, 2026.
The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last twelve months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This letter and its enclosure will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.
Please contact me at 404-997-4890 with any questions you have regarding this letter.
Sincerely, Steven P. Smith, Chief Projects Branch 6 Division of Operating Reactor Safety Docket Nos. 05000335 and 05000389 License Nos. DPR-67 and NPF-16 Enclosure:
Saint Lucie Inspection/Activity Plan (3/1/2025 - 12/31/2026)
cc w/ encl: Distribution via LISTSERV Signed by Smith, Steven on 03/07/25
ML25066A159 OFFICE RII/DORS RI/DORS NAME P. Carman S. Smith DATE 3/7/25 3/7/2025
Site Inspection Activity Plan Enclosure 07200061 - Saint Lucie (ISFSI)
03/01/2025 - 12/31/2026 PREOPERATIONAL TESTING OF AN ISFSI
3/17/2025 3/21/2025 IP 60854 001000 Preoperational Testing Of An ISFSI 3/17/2025 3/21/2025 IP 60856 001003 Review of 10 CFR 72.212(b) Evaluations 3/24/2025 3/28/2025 IP 60854 001000 Preoperational Testing Of An ISFSI OPERATION OF AN 3/31/2025 ISFSI 4/4/2025 IP 60855 001001 Operation Of An ISFSI
Unit Start End Activity CAC Title Staff Count
Saint Lucie 03/01/2025 - 12/31/2026 Unit Start End Activity CAC Title Staff Count CYBER SECURITY INSPECTION
1,2 3/10/2025 3/14/2025 IP 71130.10 000741 Cybersecurity COMPREHENSIVE ENGINEERING TEAM INSPECTION (CETI)
1,2 3/24/2025 3/28/2025 IP 71111.21M 000713 Comprehensive Engineering Team Inspection 1,2 4/7/2025 4/11/2025 IP 71111.21M 000713 Comprehensive Engineering Team Inspection OPERATION OF AN ISFSI
SECURITY BASELINE INSPECTION
1,2 4/21/2025 4/24/2025 IP 71130.02 000734 Access Control 1,2 4/21/2025 4/24/2025 IP 71130.05 000737 Protective Strategy Evaluation 1,2 4/21/2025 4/24/2025 IP 71130.09 001656 Security Plan Changes 1,2 4/21/2025 4/24/2025 IP 71151 001338 Performance Indicator Verification SECURITY BASELINE INSPECTION
1,2 7/21/2025 7/24/2025 IP 71130.04 000736 Equipment Performance, Testing, and Maintenance 1,2 7/21/2025 7/24/2025 IP 71130.07 000739 Security Training UNIT 1 IN-SERVICE INSPECTION +RVH
1 9/29/2025 10/10/2025 IP 71111.08P 000702 Inservice Inspection Activities (PWR)
RP OCCUPATIONAL RAD SAFETY BASELINE INSPECTION
1,2 9/29/2025 10/3/2025 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls 1,2 9/29/2025 10/3/2025 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation 1,2 9/29/2025 10/3/2025 IP 71124.05 000729 Radiation Monitoring Instrumentation 1,2 9/29/2025 10/3/2025 IP 71151 000746 Performance Indicator Verification 1,2 10/20/2025 10/24/2025 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls 1,2 10/20/2025 10/24/2025 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation 1,2 10/20/2025 10/24/2025 IP 71124.05 000729 Radiation Monitoring Instrumentation 1,2 10/20/2025 10/24/2025 IP 71151 000746 Performance Indicator Verification ST LUCIE INITIAL EXAM
1,2 10/26/2025 11/1/2025 OV 000956 FB-OR-Onsite Validation Of Initial License Examination (OV)
1,2 11/30/2025 12/13/2025 EXAD 000500 FB-OR-Initial License Exam Administration (EXAD)
SAINT LUCIE REQUAL
EMERGENCY PREPAREDNESS EXERCISE INSPECTION
1,2 2/9/2026 2/13/2026 IP 71114.01 000716 Exercise Evaluation 1,2 3/31/2025 4/4/2025 IP 60855 001001 Operation Of An ISFSI 1,2 11/16/2025 11/22/2025 IP 71111.11B 000704 Licensed Operator Requalification Program and Licensed Operator Performance
Site Inspection Activity Plan
1,2 2/9/2026 2/13/2026 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes 1,2 2/9/2026 2/13/2026 IP 71151 001397 Performance Indicator Verification RP OCCUPATIONAL RAD SAFETY BASELINE INSPECTION
1,2 4/13/2026 4/17/2026 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls 1,2 4/13/2026 4/17/2026 IP 71151 000746 Performance Indicator Verification UNIT 2 IN-SERVICE INSPECTION +SG
SECURITY BASELINE INSPECTION
1,2 5/18/2026 5/21/2026 IP 71130.02 000734 Access Control 1,2 5/18/2026 5/21/2026 IP 71130.09 001656 Security Plan Changes 1,2 5/18/2026 5/21/2026 IP 71130.14 000743 Review of Power Reactor Target Sets 1,2 5/18/2026 5/21/2026 IP 71151 001338 Performance Indicator Verification FOCUSED ENGINEERING INSPECTION (FPTI)
1,2 7/13/2026 7/17/2026 IP 71111.21N.05 001646 Fire Protection Team Inspection (FPTI)
1,2 7/27/2026 7/31/2026 IP 71111.21N.05 001646 Fire Protection Team Inspection (FPTI)
RP PUBLIC RAD SAFETY BASELINE INSPECTION
1,2 8/10/2026 8/14/2026 IP 71124.06 000730 Radioactive Gaseous and Liquid Effluent Treatment 1,2 8/10/2026 8/14/2026 IP 71124.07 000731 Radiological Environmental Monitoring Program 1,2 8/10/2026 8/14/2026 IP 71124.08 000732 Radioactive Solid Waste Processing & Radioactive Material Handling, Storage, & Transportation 1,2 8/10/2026 8/14/2026 IP 71151 000746 Performance Indicator Verification FORCE-ON-FORCE PLANNING AND EXERCISE WEEKS - STL
1,2 10/26/2026 10/30/2026 IP 71130.03 000735 Contingency Response - Force-On-Force Testing 1,2 11/16/2026 11/20/2026 IP 71130.03 000735 Contingency Response - Force-On-Force Testing
4/20/2026 5/1/2026 IP 71111.08P 000702 Inservice Inspection Activities (PWR)