SUBJECT:

ST. LUCIE NUCLEAR PLANT - SECURITY BASELINE INSPECTION REPORT 05000335/2022401 AND 05000389/2022401

Dear Mr. Coffey:

On April 26, 2022, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at St. Lucie Nuclear Plant and discussed the results of this inspection with Mr. Orlando Hernandez and other members of your staff. The results of this inspection are documented in the enclosed report.

No findings or violations of more than minor significance were identified during this inspection.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely, Jannette G. Worosilo, Chief Plant Support Branch Division of Reactor Safety Docket Nos. 05000335 and 05000389 License Nos. DPR-67 and NPF-16

Enclosure:

As stated

Inspection Report

Docket Numbers:

05000335 and 05000389

License Numbers:

DPR-67 and NPF-16

Report Numbers:

05000335/2022401 and 05000389/2022401

Enterprise Identifier:

I-2022-401-0042

Licensee:

Florida Power & Light Company

Facility:

St. Lucie Nuclear Plant

Location:

Jensen Beach, Florida

Inspection Dates:

April 18, 2022 to April 22, 2022

Inspectors:

J. Brown, Senior Physical Security Inspector

A. Richardson, Physical Security Inspector

J. Wallo, Senior Physical Security Inspector

Approved By:

Jannette G. Worosilo, Chief

Plant Support Branch

Division of Reactor Safety

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a security baseline inspection at St. Lucie Nuclear Plant, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

List of Findings and Violations

No findings or violations of more than minor significance were identified.

Additional Tracking Items

None.

INSPECTION SCOPES

Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2201, Security Inspection Program for Commercial Nuclear Power Reactors. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.

SAFEGUARDS

71130.02 - Access Control

The inspectors evaluated the access control program through completion of the following

inspection elements: Access Control

(1) Tier I: All Requirements

Tier II: 8 Requirements (02.06 a - d, 02.07 a, 02.08 a, b, e)

Tier III: 1 Requirement (02.09)

71130.05 - Protective Strategy Evaluation

The inspectors evaluated the licensee's protective strategy through completion of the following

procedure elements: Protective Strategy Evaluation

(1) Tier I: All Requirements

Tier II: (02.05 a, 02.06 a, d, e, f, g, h, i, j, k, l, m, n, 02.07 a, b, c, e)

Tier III: (02.08, 02.09 a, b, 02.11 a)

(2)

Drill Observation (1 Sample)

71130.09 - Security Plan Changes

The inspectors evaluated the security plan changes through completion of the following

procedure elements: Security Plan Changes

(1) Since the last NRC inspection of this program area, Security Plan Revision 22 was implemented based on your determination, in accordance with 10 CFR 50.54(p)(2), that the changes resulted in no decrease in safeguards effectiveness of the security plan, and that the revised security plan changed continues to meet the requirements of 10 CFR 73.55(b). The inspectors conducted a review of the security plan changes to evaluate for potential decrease in safeguards effectiveness of the security plan. However, this review does not constitute formal NRC approval of the changes. Therefore, these changes remain subject to future NRC inspection in their entirety.

OTHER ACTIVITIES - BASELINE

71151 - Performance Indicator Verification The inspectors verified licensee performance indicators submittals listed below:

PP01: Protected Area Security Equipment Performance Index Sample (IP Section 02.17) (1 Sample)

(1) April, 2021 through April,

INSPECTION RESULTS

No findings were identified.

EXIT MEETINGS AND DEBRIEFS

The inspectors verified no proprietary information was retained or documented in this report.

On April 26, 2022, the inspectors presented the security baseline inspection results to Mr. Orlando Hernandez and other members of the licensee staff.

DOCUMENTS REVIEWED

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

2374893

Corrective Action

Documents

2375121

Various Key & Lock Accountability Records

Miscellaneous

Various Vital Area Manual Access Logs

SY-AA-102-1000

SGI Program

Revision 21

SY-AA-102-1021

Conduct of Personnel Searches

Revision 14

SY-AA-102-1022

Vehicle & Material Search

Revision 13

SY-AA-102-1023

Visitor Access Control

Revision 11

71130.02

Procedures

SY-AA-102-1024

Escorting Vehicles & Materials

Revision 5

2377523

2377523

2406568

2406568

Corrective Action

Documents

2416874

SFI 2415

Target Sets

Revision 14

SY-AA-102-1008

Security Drills and Exercises

Revision 15

SY-AA-102-1015

Safety/Security Interface

Revision 18

Procedures

SY-AA-102-1035

Security Performance Assessment Program

Revision 12

PSL - 21-002

Annual Review Worksheet (Security)

2/18/2021

71130.05

Self-Assessments

PSL-22-001

St. Lucie Nuclear Assurance Report

2/22/2022

71130.09

Miscellaneous

PSL Physical Security Plan

Revision 22

71151

Miscellaneous

Various Security Performance Indicator Documents