October 7, 2019
SUBJECT:
ST. LUCIE NUCLEAR PLANT, UNITS 1 AND 2 - NRC SECURITY INSPECTION REPORT 05000335/2019411 AND 05000389/2019411
Dear Mr. Hernandez:
On September 12, 2019, the U.S. Nuclear Regulatory Commission (NRC) completed a security inspection at your St. Lucie Nuclear Plant, Units 1 and 2, and discussed the results of this inspection with Dan DeBoer and other members of his staff. The results of this inspection are documented in the enclosed report.
No NRC-Identified or self-revealing findings were identified during the inspections.
This letter will be made available for public inspection and copying at https://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room, in accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding.
Sincerely,
/RA/
Binoy Desai, Chief Plant Support Branch Division of Reactor Safety
Docket Nos: 50-335 and 50-389 License Nos: DPR-67 and NPF-16
Enclosure:
NRC IR 05000335/2019411, and 389/2019411
Inspection Report
Docket Numbers:
50-335 and 50-389
License Numbers:
Report Numbers:
05000335/2019411 and 05000389/2019411
Enterprise Identifier:
I-2019-411-0041
Licensee:
Florida Power and Light Company
Facility:
St. Lucie Nuclear Plant, Units 1 and 2
Location:
Jensen Beach, FL
Dates:
September 9 - 12, 2019
Inspectors:
Jonathan Brown, Physical Security Inspector
Approved by:
Binoy Desai, Chief
Plant Support Branch
Division of Reactor Safety
SUMMARY
The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a Baseline Security Inspection at St. Lucie Nuclear Plant, Units 1 and 2, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors.
Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.
List of Findings and Violations
No findings were identified.
INSPECTION SCOPE
Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2201, Security Inspection Program for Commercial Nuclear Power Reactors. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.
SAFEGUARDS
71130.02 - Access Control
The inspector evaluated the access control program. The following elements were evaluated from this IP dated January 1, 2019.
Tier I: All Requirements Tier II: 02.06, a., b., d.; 02.8, a., c., d., f., g.
Tier III: 02.10, a.
OTHER ACTIVITIES - BASELINE
71151 - Performance Indicator Verification
The inspector verified licensee performance indicators submittals listed below for the period from August 2018, through August 2019.
- (1) Protected Area Security Equipment Performance Index
EXIT MEETINGS AND DEBRIEFS
On September 12, 2019, the inspector presented the Baseline Security Inspection results to Mr. DeBoer and other members of the licensee staff.
DOCUMENTS REVIEWED
Inspection
Procedure
Type
Designation
Description of Title
Revision No.
Procedures
SFI 2012
HI-SCAN 7555i X-Ray System Operation
SFI 2304
Search Equipment Testing
Conduct of Personnel Searches
Security Equipment Testing
Weapons Maintenance
Security Posts and Patrols
Controlling Gates and Vehicle Barriers
Vehicle and Material Searches
Escorting Vehicles and Materials
SFI 1114
Security Keys and Cores
NEI 99-02 Regulatory Assessment Performance
Guideline (PI)
Condition
Reports
257125, 02278923, 02279533, 02275792, 02267812, 02300514, 02267887, 02277949,
242724, 02243075, 02270581, 02269335, 02302828, 02327713, 02327676, 02307370