MONTHYEARIR 05000331/19970011997-11-0505 November 1997 SALP Rept 50-331/97-01 for 951029-970927 IR 05000331/19860011986-06-25025 June 1986 App to SALP Board Rept 50-331/86-01 for Sept 1984 - Feb 1986 ML20155J6141986-05-21021 May 1986 SALP Rept 50-331/86-01 for Sept 1984 - Feb 1986.Overall Performance Continued to Improve.Weaknesses Identified in Pump Operability & Control of Instruments 1997-11-05
[Table view] Category:TEXT-INSPECTION & AUDIT & I&E CIRCULARS
MONTHYEARIR 05000331/19993021999-10-25025 October 1999 NRC Operator Licensing Exam Rept 50-331/99-302OL(including Completed & Graded Tests) for Tests Administered on 990920- 24.Six Applicants Passed Exam & Were Issed Operating Licenses IR 05000331/19990111999-10-0707 October 1999 Insp Rept 50-331/99-11 on 990820-0930.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000331/19990081999-09-0202 September 1999 Insp Rept 50-331/99-08 on 990712-16 & 0810-12.No Violations Noted.Major Areas Inspected:Radiation Protection & Chemistry Programs IR 05000331/19990091999-08-26026 August 1999 Insp Rept 50-331/99-09 on 990708-0819.Violations Noted.Major Areas Inspected:Licensee Operations,Engineering,Maint & Plant Support IR 05000331/19990101999-08-17017 August 1999 Insp Rept 50-331/99-10 on 990802-06.No Violations Noted. Major Areas Inspected:Review of Emergency Preparedness Program,Aspect of Plant Support IR 05000331/19990051999-07-27027 July 1999 Insp Rept 50-331/99-05 on 990601-0701.Violations Noted.Major Areas Inspected:Engineering,Technical Support & Corrective Actions IR 05000331/19990071999-07-16016 July 1999 Insp Rept 50-331/99-07 on 990526-0707.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000331/19993011999-07-13013 July 1999 NRC Operator Licensing Exam Rept 50-331/99-301OL (Including Completed & Graded Tests) for Tests Administered on 990525. Written Retake Exam Administered by Licensee to One Applicant.Applicant Passed Exam & Issued RO License IR 05000331/19980051999-07-12012 July 1999 Insp Rept 50-331/98-05 on 990622-24.No Violations Noted. Major Areas Inspected:Maint IR 05000331/19990061999-06-25025 June 1999 Insp Rept 50-331/99-06 on 990607-11.No Violations Noted. Major Areas Inspected:Physical Security Program IR 05000331/19990041999-06-0909 June 1999 Insp Rept 50-331/99-04 on 990414-0525.Non-cited Violations Noted.Major Areas Inspected:Operations,Engineering, Maintenance & Plant Support IR 05000331/19990031999-04-23023 April 1999 Insp Rept 50-331/99-03 on 990303-0413.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support PNO-III-99-024, on 990416,licensee Commenced Controlled Power Reduction to Approx 10% to Identify & Repair Main Generator Field Ground.Troubleshooting Efforts Are Still in Progress. Ris Monitored SD & Troubleshooting & Will Review Activities1999-04-19019 April 1999 PNO-III-99-024:on 990416,licensee Commenced Controlled Power Reduction to Approx 10% to Identify & Repair Main Generator Field Ground.Troubleshooting Efforts Are Still in Progress. Ris Monitored SD & Troubleshooting & Will Review Activities IR 05000331/19990011999-03-24024 March 1999 Insp Rept 50-331/99-01 on 990113-0302.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support ML20203F1431999-02-10010 February 1999 Notice of Violation from Insp on 981125-990112.Violation Noted:On 981203,quality Control Inspector Failed to Implement Step 5.3(4) of GMP-INST-011,in That Individual Did Not Verify That Profile of Component Lead Was Visible IR 05000331/19980151999-02-10010 February 1999 Insp Rept 50-331/98-15 on 981125-990112.Violations Noted. Major Areas Inspected:Aspects of Licensees Operations, Engineering,Maint & Plant Support IR 05000331/19990021999-02-0101 February 1999 Insp Rept 50-331/99-02 on 990119-21.No Violations Noted. Major Areas Inspected:Reviewed C/As for Previously Identified Issues from Sys Operational Performance Insp Completed on 970425 IR 05000331/19980211999-01-0505 January 1999 Insp Rept 50-331/98-21 on 981214-17.No Violations Noted. Major Areas Inspected:Licensing Corrective Actions & Engineering Involvement in Corrective Action Process IR 05000331/19980201998-12-29029 December 1998 Licensed Operator Requalification Training Program Insp Rept 50-331/98-20 Conducted on 981204.Exam Results:Two Operating Crews Passed Operating Portion of Exam.One SRO & Two ROs Failed Written Exam IR 05000331/19980191998-12-23023 December 1998 Insp Rept 50-331/98-19 on 981130-1204.No Violations Noted. Major Areas Inspected:Radiation Protection & Chemistry Program IR 05000331/19980141998-12-18018 December 1998 Insp Rept 50-331/98-14 on 981014-1124.No Violations Noted. Major Areas Inspected:Operations,Engineering,Maint & Plant Support IR 05000331/19980181998-12-16016 December 1998 Insp Rept 50-331/98-18 on 981116-20 Onsite & 1208 NRC Region 3 Ofc.No Violations Noted.Major Areas Inspected:Review of Physical Security Program IR 05000331/19980131998-11-12012 November 1998 Insp Rept 50-331/98-13 on 980905-1013.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000331/19980161998-11-0303 November 1998 Emergency Preparedness Exercise Insp Rept 50-331/98-16 on 981020-23.Major Areas inspected:1998 Emergency Preparedness Exercise IR 05000331/19980171998-10-30030 October 1998 Insp Rept 50-331/98-17 on 981013-16.No Violations Noted. Major Areas Inspected:Implementation of Solid Waste Mgt Program & Radioactive Material Shipping Program IR 05000331/19980121998-10-0202 October 1998 Insp Rept 50-331/98-12 on 980730-0904.No Violations Noted. Major Areas Inspected:Operations,Engineering,Maint & Plant Support PNO-III-98-045, on 980914,empty Type B Shipping Cask Received with Removable Contamination Levels of Approx 40,000 Dpm Per 100 Square Centimeters.Licensee Decontaminated Cask1998-09-16016 September 1998 PNO-III-98-045:on 980914,empty Type B Shipping Cask Received with Removable Contamination Levels of Approx 40,000 Dpm Per 100 Square Centimeters.Licensee Decontaminated Cask IR 05000331/19980091998-08-19019 August 1998 Insp Rept 50-331/98-09 on 980610-0729.No Violations Noted. Major Areas Inspected:Aspects of Licensee Operations, Engineering,Maint & Plant Support IR 05000331/19980111998-08-14014 August 1998 Insp Rept 50-331/98-11 on 980803-07.No Violations Noted. Major Areas Inspected:Evaluation of Effectiveness of Aspects of Radiation Protection & Chemistry Program ML20236V6971998-07-28028 July 1998 Notice of Violation from Insp on 980429-0609.Violation Noted:On 980513,licensee Conducted Primary Containment Closeout Insp,Activity Affecting Quality & Failed to Verify That Drywell General Area Was Free of Trash & Tools IR 05000331/19980081998-07-28028 July 1998 Insp Rept 50-331/98-08 on 980429-0609.Violations Noted.Major Areas Inspected:Operations,Maint & Engineering ML20236U4911998-06-30030 June 1998 Notice of Violation from Insp on 980505-06.Violations Noted: on 980412,licensee Maint Staff Failed to Adequately Document & Reroute Through Affected Departs for Review & Approval,Changes Made in Scope of Work to Listed Request ML20236U4931998-06-30030 June 1998 Insp Rept 50-331/98-10 on 980505-06.No Violations Noted. Major Areas Inspected:Maint Activities Related to Grayboot Applications Including Training & Qualifications of Maint Staff to Perform Grayboot Applications ML20248J4471998-05-29029 May 1998 Notice of Violation from Insp on 980318-0428.Violation Noted:On 980408,STP 42B012-CY,Prerequisite 6.4,was Not Properly Implemented IR 05000331/19980041998-05-29029 May 1998 Insp Rept 50-331/98-04 on 980318-0428.Violations Noted.Major Areas Inspected:Operations,Maint & Engineering ML20247K3231998-05-12012 May 1998 Notice of Violations from Insp on 980413-0504.Violations Noted:On 980404,licensee Did Not Make Sure Surveys to Assure Compliance w/10CFR20.1902(b),which Describes Posting of High Radiation Areas IR 05000331/19980071998-05-12012 May 1998 Insp Rept 50-331/98-07 on 980413-0504.Violations Noted. Major Areas Inspected:Review of Radiological Planning & Controls for Work Conducted During Ongoing Refueling Outage Including ALARA Reviews & Outage Dose Trending ML20217L0531998-04-28028 April 1998 Notice of Violation from Insp on 980318-20.Violation Noted: on 980313,Operating Log Did Not Contain Entry for Restoration of Reactor Manual Control Sys to Service After Completion of Mods ML20217L7211998-04-28028 April 1998 Insp Rept 50-331/98-06 on 980318-20.Violations Noted.Major Areas Inspected:Circumstances Surrrounding Removal of Sys from Service,Review of Selected Procedures & Records & Interviews W/Personnel Involved W/Removing Sys from Service ML20216G4541998-04-0909 April 1998 Insp Rept 50-331/98-03 on 980205-0317.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support ML20216G4441998-04-0909 April 1998 Notice of Violation from Insp on 980205-0317.Violation Noted:Between 980210 & 0306,licensee Failed to Follow Administrative Control Procedure 1408.9,Step 3.7(2) ML20202G4541998-02-0606 February 1998 Notice of Violation from Insp on 971223-980204.Violations Noted:Between 960102 & 04,for Total of 58 Hours While Plant in Power Operating Conditions,Containment Isolation Valves CV5704B & CV5718B for Well Water Sys,Inoperable ML20202G4731998-02-0606 February 1998 Insp Rept 50-331/98-02 on 971223-980204.Violations Noted. Major Areas Inspected:Operations,Engineering,Maintenance & Plant Support ML20202E9461998-01-0202 January 1998 Insp Rept 50-331/97-17 on 971111-1222.Violations Noted. Major Areas Inspected:Operations,Maintenance,Engineering & Plant Support IR 07100111/20120221998-01-0202 January 1998 Notice of Violation from Insp on 971111-1222.Violation Noted:Nrc Identified on 971218,three Individuals Designated as Requiring Annual Respirator Fit Testing Overdue for Training IR 05000331/19970161997-12-0202 December 1997 Insp Rept 50-331/97-16 on 970928-1110.Violations Noted. Major Areas Inspected:Operations,Maintenance,Engineering & Plant Support ML20202E9211997-12-0202 December 1997 Notice of Violation from Insp on 970928-1110.Violation Noted:From 970519-1029,inspectors Identified That on Ten Occasions Licensee Failed to Balance Mal at Least Once Per Calendar Day When Work in FME Zone IR 05000331/19970141997-11-12012 November 1997 Insp Rept 50-331/97-14 on 970822-0927.No Violations Noted. Major Areas Inspected:Licensee Operations,Engineering,Maint & Plant Support IR 05000331/19970011997-11-0505 November 1997 SALP Rept 50-331/97-01 for 951029-970927 IR 05000331/19970121997-09-22022 September 1997 Insp Rept 50-331/97-12 on 970718-0821.Violations Noted. Major Areas Inspected:Operations,Maintenance,Engineering & Plant Status 1999-09-02
[Table view] |
Text
.
.
.
I
! SALP 5 APPENDIX SALP BOARD REPORT
'
U.S. NUCLEAR REGULATORY COMMISSION
REGION III
SYSTEMATIC ASSESSMENT OF LICENSEE PERFORMANCE 50-331/86001
-
Inspection Report
Iowa Electric Light and Power Name of Licensee
! Duane Arnold Energy Center Name of Facility
! September 1, 1984 through February 28, 1986 Assessment Period I
.
l l
6 p G
. _ - - . _ - _ _ _ _ _ - _ _ - _ - _ __ ._ . .. .. . . . - . - - - - . - . - - - . -
-____
.
.
.
Duane Arnold Energy Center Meeting Summary The findings and conclusions of the SALP Board are documented in Report No. 50-331/86001. They were discussed with the licensee on May 28, 1986, at the Region III office in Glen Ellyn, Illinois. The licensee's regulatory performance was presented in each functional area. Performance in each functional area was found to be acceptable with an improving trend noted in overall regulatory performance. The performance rating improved in the areas of Security, Emergency Preparedness, and Surveillance and Inservice Testin While the performance rating in the area of Maintenance / Modifications declined based on more in-depth inspection, there was not a declining trend noted. The licensee continues to have a high level of performance in the areas of Plant Operations, Fire Protection, and Licensing Activitie While this meeting was primarily a discussion between the licensee and the NRC, it was open to members of the public as observer The following licensee and NRC personnel were in attendance on May 28, 198 Iowa Electric Light and Power Company L. Liu, President and Chief Executive Officer R. W. McGaughy, Manager Nuclear Division D. L. Mineck, Plant Superintendent L. D. Root, Senior Vice President, Operations and Production U.S. Nuclear Regulatory Commission A. B. Davis, Deputy Regional Administrator W. G. Guldemond, Chief, Reactor Projects Branch 2 D. C. Boyd, Chief, Reactor Projects Section 2D
'
J. S. Wiebe, Senior Resident Inspector N. V. Gilles, Resident Inspector R. B. Landsman, Project Manager, Section 2D M. A. Ring, Chief, Test Programs Section P. L. Eng, Reactor Inspector i
.